| DR-0001-25-N | 12/03/2025 | 12/03/2025 | production (manufacturing) | minor | broken bucket at time of line clearance | N5C016 | It was observed during line clearance that one empty bucket out of 2 buckets was cracked which was intended to be used for storage of batch after granulation. | NA | CAPA-0008-25 | Closed | | Muneeb Shahid | 17/03/2025 | Muneeb Shahid | 22/04/2025 |
| DR-0002-25-N | 26/06/2025 | 26/06/2025 | Nutra Manufacturing | major | White spots seen in K-1000 chewable tablet | N5F066 | After compression moisture ingress was observed in production area. | RCA-0015-25 | CAPA-0024-25 | Closed | | Muneeb Shahid | 27/06/2025 | Muneeb Shahid | 09/07/2025 |
| DR-0003-25-N | 26/06/2025 | 27/06/2025 | Nutra Manufacturing | major | moisture in compressed air | N5F001 | As per DR-0003-25-N, During the seal coating process, 2.600 kg of tablets were rejected in Shevit tablet B.No#N5F001 due to moisture contamination caused by water ingress in the compressed air supply. This led to defects on the tablet surface, necessitating manual sorting before the film coating stage. As a result, a lower yield is expected at the packing stage. | NA | NA | In Progress | | Muneeb Shahid | 27/06/2025 | Muneeb Shahid | 15/07/2025 |