Ref. SOP No. QAG/2/080

PHARMEVO (PVT.) LTD.

Document No. QAG/5/264

Title: Master Log of Logbooks


 
   TitleLogbook Control NoIssue DateIssued to nameIssued to designationRetrieval DateRetrieval by nameRemarksDepartment
Vehicle IN / OUT RegisterADG/5/005-21/00101-06-2021Abdullah (Security)Incharge31-12-2021Niaz Ali JatoiAdmin Department - Retrieved 
Equipment Logbook - Blister BM-350-APRG/5/102-21/00121-06-2021Hasan (Prod.)N/A20-01-2022Niaz Ali JatoiRetrievedProduction Non-Ceph
Daily Temperature Monitoring Log of Refrigerator - CephQCI/5/105-23-00115-03-2023Narain MalhiAssistant Manager QC - Ceph   Quality Control
Equipment / Machine Log book - Blister 350-C Non-CephPRG/5/102-23/00416-03-2023Shahrukh SaleemSenior Executive Production   Production Non-Ceph
Finished Product Testing Log Book - Saman BarlasQCG/5/015-23/00417-03-2023Saman BarlasOfficer QC   Quality Control
PM Testing Logbook for Lid and Base Foil - Zain ul HadiQCP/5/018-23/00520-03-2023Zain ul HadiQC Officer Packaging01-06-2023Niaz Ali JatoiRetrievedQuality Control
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/00820-03-2023Imran GhouriExecutive QC27-03-2023Niaz Ali JatoiRetrievedQuality Control
Work In Process Store IN / OUT Record FormPRG/5/011-23/00621-03-2023Abdul GhaniSenior Executive Production  Previous logbook PRG/5/011-23/005 has been retrieved.Production Non-Ceph
PM Testing Logbook for Lid and Base Foil - Imran GhouriQCP/5/018-23/00421-03-2023Imran GhouriExecutive QC01-06-2023Niaz Ali JatoiRetrievedQuality Control
PM Testing Logbook for Adhesive Tap Label and DI - Rimsha YousufQCP/5/019-23/00421-03-2023Rimsha YousufQC Officer Packaging  Previous logbook QCP/5/016-23/003 has been retrieved.Quality Control
Over Printing Machine Logbook - Marko Print XI Jet - Barcode MP-PAK-02-31-05PMG/5/043-23/00221-03-2023Abdul BasitAM Production29-12-2023Niaz Ali JatoiPrevious logbook PMG/5/043-22/001 has been retrievedProduction Non-Ceph
Finished Product Testing Logbook - Asma TanveerQCG/5/015-23/00821-03-2023Asma TanveerExecutive QC  Previous logbook QCG/5/015-22/007 has been revieved.Quality Control
PM Testing Logbook of Master Cartons and Unit Cartons - Zain Ul HadiQCP/5/021-23/00822-03-2023Zain ul HadiOfficer QC14-09-2023Niaz Ali JatoiS/1110Quality Control
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/00927-03-2023Imran GhouriExecutive QC03-04-2023Niaz Ali JatoiS/1113Quality Control
General Usage Logbook of HPLC for HPLC No.15PDG/5/105-23/00127-03-2023Nadeem MuradAM PD13-09-2023Niaz Ali JatoiS/1114Product Development
General Usage Logbook of HPLC for HPLC No.16PDG/5/10523/00127-03-2023Nadeem MuradAM PD13-09-2023Niaz Ali JatoiS/1115Product Development
General Usage Logbook of HPLC for HPLC No.17PDG/5/10523/00127-03-2023Nadeem MuradAM PD13-09-2023Niaz Ali JatoiS/1116Product Development
General Usage Logbook of HPLC for HPLC No.18PDG/5/10523/00127-03-2023Nadeem MuradAM PD13-09-2023Niaz Ali JatoiS/1117Product Development
Machine / Equipment Logbook - ZP37 - B-1 - Deduster NCPRG/5/102-23/00231-03-2023Shahid Ali JhakExecutive Production  Previous logbook No.PRG/5/102-22/001 has been retrieved.Production Non-Ceph
Logbook for Batch Document Issuance General PharmaQAG/5/115-23/00403-04-2023Syed Asif HussainAsstt Officer QA  Previous logbooks from QAG/5/115-22/001 to QAG/5/115-22/003 are still with the concerned section of QA.Quality Assurance
Raw Material Testing Logbook - Asma TanveerQCG/5/184-23/00107-04-2023Asma TanveerExecutive QC  First Logbook is being issued.Quality Control
Conveyor Belt Logbook - Belt No. 07 - NCPMG/5/040-23/00307-04-2023Abdul BasitAM Production  Previous logbook is retrievedProduction Non-Ceph
Equipment / Machine Log book - Blister 350-B Non-CephPRG/5/10223/00411-04-2023Abdul GhaniSenior Executive Production  Previous logbook is retrievedProduction Non-Ceph
Finished Product Testing Log Book - Umair SiddiquiQCG/5/015-23/00111-04-2023Umair SiddiquiExecutive QC  Previous logbook will be retrieved within next 03 days.Quality Control
Daily Log sheet for Centrifugal ChillerENG/5/001-23/00911-04-2023Hasnain ShabbirSenior Officer Engineering19-06-2023Niaz Ali JatoiLogbook is used till page no.99 and is retrieved.Engineering
Equipment Logbook - Dissolution Apparatus No.02QCI/5/030-23/00211-04-2023Masood ur RehmanSenior Executive QC  Previous logbook QCI/5/030-23/001 dated 07/12/2022 Reg. No. 262 is retrieved.Quality Control
Verification of top load balance - UX3200 G- Micro Non-CephQCI/5/047-23/00111-04-2023Nida ZehraOfficer QC  Reg. No. 1144Quality Control
Microbiological Testing Report for Pharmaceutical production - ValidationQCM/5/057-23/00411-04-2023Nida ZehraOfficer QC25-07-2023Niaz Ali JatoiPrevious logbook QCM/5/057-23/003 Reg. No.995 is retrieved.Quality Control
Column Usage LogbookQCG/5/072-23/00113-04-2023Masood ur RehmanSenior Executive QC13-06-2024Niaz Ali JatoiNew Logbook is issuedQuality Control
Temperature & Humidity Monitoring Logbook of Wet Chemistry LabQCG/5/254-23/00113-04-2023Saman BarlasOfficer QC  New Logbook is issuedQuality Control
Temperature & Humidity Monitoring Logbook of Instrument LabQCG/5/25423/00113-04-2023Saman BarlasOfficer QC  New Logbook is issuedQuality Control
Temperature & Humidity Monitoring Logbook of Balance RoomQCG/5/25423/00113-04-2023Saman BarlasOfficer QC  New Logbook is issuedQuality Control
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/01613-04-2023Affan Bin SafdarOfficer QC09-05-2023Nasarullah MajeedPrevious logbook No. QCG/5/036-23/015 has been retrieved.Quality Control
Machine / Equipment Logbook - Gral Mixer - NCPRG/5/10223/00214-04-2023Farhan ButtTeam Leader03-07-2023Niaz Ali JatoiS/1152Production Non-Ceph
Logsheet for Distilled Water PlantPCG/5/014-23/00614-04-2023Adnan Ali KhanOperator  Previous logbook PCG/5/014-23/005 is retrieved by QA Person of Ceph area.Production Ceph
General Usage Logbook - Dissolution Apparatus No.06QCI/5/03023/00214-04-2023Masood ur RehmanSenior Executive QC24-11-2023Niaz Ali JatoiS/1154Quality Control
Conveyor Belt Logbook - Belt No. 01 - NCPMG/5/040-23/00217-04-2023Abdul BasitAM Production26-09-2023Niaz Ali JatoiS/1155Production Non-Ceph
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/01119-04-2023Imran GhouriExecutive QC27-04-2023Niaz Ali JatoiPrevious logbook QCP/5/014-23/010 is retrieved having leaves.Quality Control
Equipment General Logbook - Analytical Balance No.03QCI/5/030-23/00319-04-2023Masood ur RehmanSenior Executive QC11-09-2023Niaz Ali Jatoi Quality Control
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/01227-04-2023Imran GhouriExecutive QC  Previous logook QCP/5/014-23/011 is retrieved.Quality Control
Machine Equipment Logbook - ZP37 B-II Deduster - NCPRG/5/10223/00206-05-2023Shahid Ali JhakExecutive Production03-07-2023Niaz Ali Jatois/1162Production Non-Ceph
Daily Cleaning Logbook of IPC Equipment - Disintegration Tester - NCQAN/5/001-23/00306-05-2023NomanAM QA20-12-2023Nasrullah MajeedPrevious logbook QAN/5/001-23/002 is retrieved.Quality Assurance
Daily Operation Report of BoilerENG/5/006-23/01109-05-2023Husnain ShabbirSenior Officer Engineering10-07-2023Niaz Ali JatoiPrevious logbook ENG/5/006-23/010 is retrieved on 08/05/2023Engineering
Machine Equipment Logbook - FBD-120Kg - NCPRG/5/10223/00408-05-2023Shahid Ali JhakExecutive Production  Previous logbook PRG/5/102-23/003 is retrieved.Production Non-Ceph
Logsheet for operation of Reverse Osmosis PlantENO/5/084-23/00724-05-2023Azeemul ZafarOpeator12-09-2023Niaz Ali JatoiS/01Engineering
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/01305-05-2023Imran GhouriExecutive QC11-05-2023Nasarullah MajeedRetrievedQuality Control
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/01411-05-2023Imran GhouriExecutive QC17-05-2023Nasarullah MajeedRetrievedQuality Control
Effluent Treatment Plant LogbookEIG/5/011-23/00122-05-2023Adil Latif KhanOperator   EHS
PM Testing Logbook for General Packaging material - Rimsha YousufQCP/5/020-23/00224-05-2023Rimsha YousufOfficer QC01-01-1900 Previous logbook QCP/5/020-23/001Quality Control
PM Testing Logbook for General Packaging material - Rimsha YousufQCP/5/020-23/00224-05-2023Rimsha YousufOfficer QC  Previous logbook QCP/5/020-23/001Quality Control
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/01517-05-2023Imran GhouriExecutive QC24-05-2023Niaz Ali JatoiRetrievedQuality Control
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/01624-05-2023Imran GhouriExecutive QC30-05-2023Niaz Ali JatoiS/14Quality Control
PM Testing Logbook for General Packaging Material - Imran GhouriQCP/5/020-23/00312-05-2023Imran GhouriExecutive QC24-10-2023Niaz Ali JatoiS/01Quality Control
PM Testing Logbook for Lid and Base Foil - Rimsha YousufQCP/5/018-23/00316-05-2023Rimsha YousufOfficer QC21-08-2023Niaz Ali JatoiS/02Quality Control
Customer Complaint LogbookQCG/5/279-23/00119-05-2023NajeebAM QC   Quality Control
Logbook for Non-Conformance of EquipmentQCG/5/263-23/00119-05-2023NajeebAM QC   Quality Control
Logbook for Maintenance of Chemical HoodQCG/5/212-23/00119-05-2023NajeebAM QC   Quality Control
Logbook for Inventory Record of GlasswareQCG/5/200-23/00119-05-2023NajeebAM QC   Quality Control
Logbook for PT Samples ReceivingQCG/5/255-23/00119-05-2023NajeebAM QC   Quality Control
Logbook for Inventory Record of ChemicalQCG/5/199-23/00119-05-2023NajeebAM QC   Quality Control
PM Testing Logbook for U/C & M/C - Rimsha YousufQCP/5/02123/00822-05-2023Rimsha YousufOfficer QC27-07-2023Niaz Ali JatoiPrevious logbook QCP/5/021-23/007 is retrievedQuality Control
Usage Logbook for Analytical Balance No.05 - QC PackagingQCI/5/030-23/00523-05-2023Imran GhouriExecutive QC03-08-2023Nasarullah MajeedS/12Quality Control
Environmental Monitoring Report by Settle Plate of Micro. Lab Laminar Air FlowQCM/5/042-23/00123-05-2023Nida ZehraOfficer QC26-09-2023Niaz Ali JatoiS/13Quality Control
PM Testing Logbook for General Packaging material - Rimsha YousufQCP/5/02023/00224-05-2023Rimsha YousufOfficer QC  Previous logbook QCP/5/020-23/001 is retrievedQuality Control
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/01825-05-2023Affan Bin SafdarOfficer QC21-06-2023Nasarullah MajeedPrevious logbook QCG/5/036-23/017 is retrieved.Quality Control
Machine Equipment Logbook - ZPW23 De-Duster- NCPRG/5/10223/00216-05-2023Shahid Ali JhakExecutive Production03-07-2023Niaz Ali JatoiS/01Quality Control
Work In Process Store IN / OUT Record FormPMG/5/011-23/00722-05-2023Shahid Ali JhakExecutive Production05-09-2023Niaz Ali JatoiS/02Production Non-Ceph
Conveyor Belt Logbook - Belt No. 03 - NCPMG/5/040-23/00323-05-2023Abdul BasitAM Production29-01-2024Niaz Ali JatoiS/03Production Non-Ceph
Logsheet for Entry and Exist in Sterile Area - Washing - CephPCG/5/006-23/00212-05-2023OsamaSenior Officer Production17-10-2024Niaz Ali JatoiS/01Production Ceph
Usage Logbook of IPC Equipment - Hardness/Thickness Tester - NCQAN/5/001-23/00525-05-2023Abdul Wahab ShahSenior Executive QA12-01-2024Niaz Ali JatoiPrevious logbook QAN/5/001-22/004 is retrieved. S/01Quality Assurance
Logsheet for Operation of Ultra Filtration PlantENO/5/083-23/00726-05-2023Azeemul ZafarOperator12-09-2023Niaz Ali JatoiS/02Engineering
Daily Log Sheet of Water Management SystemENG/5/004-23/00726-05-2023Azeemul ZafarOperator14-09-2023Niaz Ali JatoiS/03Engineering
Conveyor Belt Logbook - Belt No. 02 - NCPMG/5/040-23/00326-05-2023Abdul BasitAM Production10-01-2024Niaz Ali Jatoi Production Non-Ceph
General Equipment Usage Logbook - TOC AnalyzerQCI/5/03023/00326-05-2023Sufiyan RazaSenior Officer QC21-12-2023Niaz Ali JatoiS/17Quality Control
Batch History Audit Logbook - Non- CephQAG/5/018-23/00629-05-2023Abdul Wahab ShahSenior Executive QA04-11-2024Niaz Ali JatoiS/02Quality Assurance
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/01730-05-2023Imran GhouriExecutive QC  Previous logbook is retrieved.Quality Control
Finished Good Testing Logbook - Sufiyan RazaQCG/5/01523/00101-06-2023Sufyan RazaSenior Officer QC24-11-2023Niaz Ali Jatois//22Quality Control
Finished Good Testing Logbook - Ahsan KhanQCG/5/01523/00101-06-2023Ahsan KhanOfficer QC12-01-2024Niaz Ali JatoiS/19Quality Control
Finished Good Testing Logbook - Hassan SiddiquiQCG/5/01523/00101-06-2023Hassan SiddiquiOfficer QC21-11-2023Niaz Ali Jatoi Quality Control
General Equipment Logbook - Conductivity Meter - Metler - S230QCI/5/030-23/00401-06-2023Affan Bin SafdarSenior Officer QC11-12-2023Niaz Ali JatoiS/23Quality Control
Logbook for Battery Replacement - NutraPNG/5/014-23/00106-06-2023Syed Baqar AliSenior Executive Production  New Logbook is being issued.Production Nutraceutical
Machine Equipment Logbook - Double Cone Blender - NutraPNG/5/001-23/00206-06-2023Syed Baqar AliSenior Executive Production  Previous logbook PNG/5/001-23/001 is being retrieved. S/02Production Nutraceutical
Machine Equipment Logbook - Four Head Sachet Filling - NutraPNG/5/001-23/00106-06-2023Syed Baqar AliSenior Executive Production   Production Nutraceutical
Machine Equipment Logbook - Packing Belt No.01 - NutraPNG/5/00123/00106-06-2023Syed Baqar AliSenior Executive Production   Production Nutraceutical
Machine Equipment Logbook - BGK 150 Coating - NutraPNG/5/00123/00206-06-2023Syed Baqar AliSenior Executive Production  Previous logbook PNG/5/001-23/001 is retrieved. S/05Production Nutraceutical
Machine Equipment Logbook - ZPW20 Compression Machine - NutraPNG/5/00123/00206-06-2023Syed Baqar AliSenior Executive Production  Previous logbook PNG/5/001-23/001 is retrieved. S/06Production Nutraceutical
Machine Equipment Logbook - Blister BM350 E - NCPRG/5/10223/00406-06-2023Abdul GhaniSenior Executive Production  Previous logbook PRG/5/102-22/003 is retrieved. S/05Production Non-Ceph
Machine Equipment Logbook - Suspension Filing Machine - CephPRG/5/10223/00212-06-2023Usama YousufSenior Officer Production  Previous logbook PRG/5/102-22/001 is retrieved on 12/06/2023 at Ceph area by IPC person of QA.Production Ceph
Machine Equipment Logbook - Domino Inkjet Printer - CephPCG/5/030-23/00112-06-2023Usama YousufSenior Officer Production26-12-2023Niaz Ali JatoiLogbook is closed on page # 03 and retrieved by QA IPC. S/03Production Ceph
Finished Good Testing Logbook - Shahzaib KhanQCG/5/015-23/00712-06-2023Shahzaib KhanExecutive QC  Previous logbook QCG/5/015-23/006 is retrieved on 12/06/2023. S/30Quality Control
Finished Good Testing Logbook - Maham MalikQCG/5/01523/00212-06-2023Maham MalikSenior Officer QC20-11-2023Niaz Ali JatoiPrevious logbook QCG/5/015-22/001 is retrieved on 12/06/2023. S/31Quality Control
Temperature Monitoring Logsheet - Referigerator 01QCG/5/002-23/00101-06-2023Saman BarlasOfficer QC   Quality Control
Temperature Monitoring Logsheet - Referigerator 02QCG/5/00223/00101-06-2023Saman BarlasOfficer QC  S/25Quality Control
Finished Good Testing Logbook - Saman Barlas - StabilityQCG/5/015-23/00513-06-2023Saman BarlasOfficer QC19-07-2023Niaz Ali JatoiPrevious logbook QCG/5/015-23/004 is retrieved on 13/06/2023.Quality Control
Conveyor Belt Logbook - Belt No. 04 - NCPMG/5/040-23/00314-06-2023Abdul BasitAM Production  Previous logbook PMG/5/040-23/005 is retrieved. S/06Production Non-Ceph
Finished Product Incoming Logbook of QC - Masood ShahQCG/5/083-23/00713-06-2023Masood ur RehmanSenior Executive QC27-11-2023Niaz Ali JatoiPrevious logbook QCG/5/083-23/006 is retrieved. S/033Quality Control
Equipment Usage Logbook - Disintegration Tester No.02QCI/5/03023/00316-06-2023Masood ur RehmanSenior Executive QC24-12-2024Niaz Ali JatoiPrevious logbook QCI/5/030-23/002 is retrieved. S/034Quality Control
Logsheet for Entry and Exist in Sterile Area - Filling - CephPCG/5/00623/00220-06-2023Usama YousufSenior Officer Production01-01-1900 S/004Production Ceph
Retention Sample Logbook - Non - CephQAG/5/032-23/00320-06-2023Hamza AhmedSenior Officer QA   Quality Assurance
PM Testing Logbook for Adhesive Tape and DI - Rimsha YousufQCP/5/01923/00516-06-2023Rimsha YousufOfficer QC25-08-2023Niaz Ali JatoiS/035Quality Control
Log Book for Microbiological Testing of Non Sterile Products - ActiflorQCM/5/092-23/00220-06-2023Nida ZehraOfficer QC09-12-2024Niaz Ali JatoiS/037Quality Control
Column Usage Logbook - QC Ceph LabQCG/5/07223/00123-06-2023Aqib AhmedSenior Officer QC   Quality Control
Log sheet for Start Up and Shut Off HVAC - CephENG/5/087-23/00126-06-2023Hasnain ShabbirSenior Officer Engineering01-01-1900 Previous logbook ENG/5/087-22/001 is retrieved. S/06Engineering
Log sheet for Start Up and Shut Off HVAC - NutraENG/5/08723/00126-06-2023Hasnain ShabbirSenior Officer Engineering01-01-1900 Previous logbook ENG/5/087-22/001 is retrieved. S/005Engineering
Vehicle IN / OUT RegisterADG/5/005-23/00527-06-2023Abdullah (Security)Security Supervisor  Previous logbook is retrieved. S/02Administration
PM Testing Logbook for Adhesive Tape and DI - Imran GhouriQCP/5/019-23/00627-06-2023Imran GhouriExecutive QC27-09-2023Niaz Ali JatoiS/42Quality Control
Machine Equipment Logbook - Fette P3030 Compression Machine - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production08-12-2023Niaz Ali JatoiS/07Production Non-Ceph
Machine Equipment Logbook - Fette - Deduster - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production01-01-2024Niaz Ali JatoiS/08Production Non-Ceph
Machine Equipment Logbook - Fette - Metal Detector - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production01-01-2024Niaz Ali JatoiS/09Production Non-Ceph
Machine Equipment Logbook - Manual Coating - Mfg Vessel- NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production19-01-2024Niaz Ali JatoiPrevious logbook retrieved. S/10Production Non-Ceph
Machine Equipment Logbook - Manual Coating Pan 24' - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production15-11-2023Niaz Ali JatoiS/11Production Non-Ceph
Equipment / Machine Log book - BGK 350- Mfg Vessel Non-CephPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production01-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/12Production Non-Ceph
Machine Equipment Logbook - BGK 350 - Coating Machine - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production12-12-2023Niaz Ali JatoiS/13Production Non-Ceph
Machine Equipment Logbook - BG 50-Coating - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production  Previous logbook retrieved. S/14Production Non-Ceph
Machine Equipment Logbook - BG-150-Coating Mfg. Vessel - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production11-01-2024Niaz Ali JatoiPrevious logbook retrieved. S/15Production Non-Ceph
Machine Equipment Logbook - BG-400 - Coating Machine - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production11-01-2024Niaz Ali JatoiPrevious logbook retrieved. S/17Production Non-Ceph
Machine Equipment Logbook - BG-400 - Coating Mfg. Vessel - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production02-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/16Production Non-Ceph
Machine Equipment Logbook - ZPW23-A Compression Machine - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production  Previous logbook retrieved. S/18Production Non-Ceph
Machine Equipment Logbook - ZPW26-B Compression Machine - NCPRG/5/10223/00203-07-2023Shahid Ali JhakExecutive Production21-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/19Production Non-Ceph
Machine Equipment Logbook - ZPW26-B - Deduster - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production21-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/20Production Non-Ceph
Machine Equipment Logbook - ZPW26-B Metal Detector - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production21-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/21Production Non-Ceph
Machine Equipment Logbook - ZPW23 - Compression Machine - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production27-10-2023Niaz Ali JatoiS/22Production Non-Ceph
Machine Equipment Logbook - ZPW23 - Metal Detector - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production21-11-2023Niaz Ali JatoiS/23Production Non-Ceph
Machine Equipment Logbook - ZPW23 - Deduster - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production27-11-2023Niaz Ali JatoiS/24Production Non-Ceph
Machine Equipment Logbook - ZPW26-A Compression Machine - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production01-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/25Production Non-Ceph
Machine Equipment Logbook - ZP37 B-I Compression Machine - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production13-11-2023Niaz Ali JatoiS/28Production Non-Ceph
Machine Equipment Logbook - ZPW26-A Deduster - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production14-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/26Production Non-Ceph
Machine Equipment Logbook - ZPW26 A Metal Detector - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production14-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/27Production Non-Ceph
Machine Equipment Logbook - ZP37 B-I Deduster - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production06-12-2023Niaz Ali JatoiS/29Production Non-Ceph
Machine Equipment Logbook - ZP37 B-I Metal Detector - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production08-12-2023Niaz Ali JatoiS/30Production Non-Ceph
Machine Equipment Logbook - T-700 Compression Machine - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production15-04-2024Niaz Ali JatoiPrevious logbook retrieved. S/31Production Non-Ceph
Machine Equipment Logbook - T-700 - Deduster - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production15-05-2024Niaz Ali JatoiPrevious logbook retrieved. S/32Production Non-Ceph
Machine Equipment Logbook - T-700 - Metal Detector - NCPRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production15-05-2024Niaz Ali JatoiPrevious logbook retrieved. S/33Production Non-Ceph
Machine Equipment Logbook - ZP37-B-II Compression Machine - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production  Previous logbook retrieved. S/34Production Non-Ceph
Machine Equipment Logbook - ZP37 B-II Deduster - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production13-12-2023Niaz Ali JatoiS/35Production Non-Ceph
Machine Equipment Logbook - ZP37 B-II Metal Detector - NCPRG/5/10223/00303-07-2023Shahid Ali JhakExecutive Production13-12-2023Niaz Ali JatoiS/36Production Non-Ceph
Machine Equipment Logbook - Granulator-01 G-1 - NCPRG/5/10223/00303-07-2023Shahrukh SaleemSenior Executive Production06-12-2023Niaz Ali JatoiS/37Production Non-Ceph
Machine / Equipment Logbook - GHL - G-01 - NCPRG/5/10223/00403-07-2023Shahrukh SaleemSenior Executive Production01-11-2023Niaz Ali JatoiS/38Production Non-Ceph
Machine / Equipment Logbook - FBD -120KG - NCPRG/5/10203-07-2023Shahrukh SaleemSenior Executive Production27-10-2023Niaz Ali JatoiS/39Production Non-Ceph
Machine Equipment Logbook - Granulator-03 - G-2 - NCPRG/5/102-23/00303-07-2023Shahrukh SaleemSenior Executive Production20-11-2023Niaz Ali JatoiS/40Production Non-Ceph
Machine Equipment Logbook - Compactor - NCPRG/5/102-23/00303-07-2023Shahrukh SaleemSenior Executive Production02-10-2023Niaz Ali JatoiS/41Production Non-Ceph
Machine Equipment Logbook - Gral Mixer - NCPRG/5/102-23/00503-07-2023Shahrukh SaleemSenior Executive Production03-11-2023Niaz Ali JatoiS/42Production Non-Ceph
Machine Equipment Logbook - ZJT-40 Capsule Filling Machine - NCPRG/5/102-23/00303-07-2023Shahrukh SaleemSenior Executive Production23-05-2024Niaz Ali JatoiPrevious logbook retrieved. S/43Production Non-Ceph
Machine Equipment Logbook - FBD - 60KG - NCPRG/5/102-23/00303-07-2023Shahrukh SaleemSenior Executive Production01-01-1900 Previous logbook retrieved. S/44Production Non-Ceph
Machine Equipment Logbook - BM350-D - Blister Machine - NCPRG/5/102-23/00403-07-2023Abdul GhaniSenior Executive Production01-01-1900 Previous logbook retrieved. S/45Production Non-Ceph
Machine Equipment Logbook - UPS-Uhlman-2DT - NCPRG/5/102-23/00203-07-2023Abdul GhaniSenior Executive Production30-08-2024Niaz Ali JatoiS/46Production Non-Ceph
Machine Equipment Logbook - BM350-C Blister Machine- NCPRG/5/10223/00503-07-2023Abdul GhaniSenior Executive Production01-12-2023Niaz Ali JatoiS/47Production Non-Ceph
Machine Equipment Logbook - BM350-A - Blister Machine - NCPRG/5/10223/00503-07-2023Abdul GhaniSenior Executive Production15-09-2023Nasarullah MajeedS/48Production Non-Ceph
Machine Equipment Logbook - BM350-B - Blister - NCPRG/5/102-23/00503-07-2023Abdul GhaniSenior Executive Production06-09-2023Niaz Ali JatoiS/49Production Non-Ceph
Machine Equipment Logbook - BM350-E - Blister Machine - NCPRG/5/102-23/00503-07-2023Abdul GhaniSenior Executive Production13-10-2023Niaz Ali JatoiS/50Production Non-Ceph
Machine Equipment Logbook - Vertical Sachet Machine- NCPRG/5/102-23/00203-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/51Production Non-Ceph
Machine Equipment Logbook - Granulator-02 - NCPRG/5/102-23/00303-07-2023Shahrukh SaleemSenior Executive Production14-02-2024Niaz Ali JatoiPrevious logbook retrieved. S/52Production Non-Ceph
Machine Equipment Logbook - Double Cone Blender 400kg - NCPRG/5/10203-07-2023Shahrukh SaleemSenior Executive Production31-01-2024Niaz Ali JatoiS/53Production Non-Ceph
Machine Equipment Logbook - Fitz Mill - NCPRG/5/102-23/00203-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/54Production Non-Ceph
Machine Equipment Logbook - Tray Dryer - NCPRG/5/102-23/00203-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/55Production Non-Ceph
Machine Equipment Logbook - GHL Small - 20kg - NCPRG/5/102-23/002'03-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/56Production Non-Ceph
Machine Equipment Logbook - Double Head Sachet - NCPRG/5/102-23/002''03-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/57Production Non-Ceph
Machine Equipment Logbook - DC Blender-DPI - NCPRG/5/102-23/002'''03-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/58Production Non-Ceph
Machine Equipment Logbook - Capsule Polisher - NCPRG/5/102-23/00103-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/60Production Non-Ceph
Machine Equipment Logbook - Capsule Filling -DPI Area - NCPRG/5/102-23/002''''03-07-2023Shahrukh SaleemSenior Executive Production  Previous logbook retrieved. S/59Production Non-Ceph
Over Printing Machine Logbook - Ink Jet Printer TJ2002PMG/5/043-23/00304-07-2023Abdul BasitAM Production07-12-2023Niaz Ali JatoiS/61Production Non-Ceph
Machine Equipment Logbook - V-Blender - NCPRG/5/102-23/00304-07-2023Shahrukh SaleemSenior Executive Production01-01-1900 Previous logbook retrieved. S/62Production Non-Ceph
Machine Equipment Logbook - DC Blender - 30kg - NCPRG/5/102-23/00304-07-2023Shahrukh SaleemSenior Executive Production05-03-2024Niaz Ali JatoiPrevious logbook retrieved. S/63Production Non-Ceph
Finished Good Testing Logbook - Narain Malhi - QC CephQCG/5/01523/00207-07-2023Narain MalhiAM QC  Previous logbook retrieved. S/43Quality Control
Finished Good Testing Logbook - Aqib Ahmed - QC Ceph.QCG/5/01523/00408-07-2023Aqib AhmedSenior Officer QC14-03-2024Nasrullah MajeedPrevious logbook retrieved. S/44Quality Control
Disinfectant Preparation Logsheet for Finished Goods WarehouseWHG/5/053-23/00207-07-2023Showkat AliAM Warehouse  Previous logbook retrieved. S/01Warehouse
Logsheet for Startup and Shutdown Procedure of HVAC Non-Ceph AreaENG/5/086-23/00210-07-2023Hasnain ShabbirSenior Officer Engineering  Previous logbook is retrieved. S/10Engineering
Daily Operation Report of BoilerENG/5/006-23/01210-07-2023Hasnain ShabbirSenior Officer Engineering  Previous logbook is retrieved. S/09Engineering
Machine Equipment Logbook - Drum Blender (Granulation) - CephPRG/5/102-23/00311-07-2023Usama YousufSenior Officer Production12-11-2024Niaz Ali JatoiPrevious logbook retrieved by Ceph IPC. S/06Production Ceph
Machine Equipment Logbook - Manesty Mixer (Granulation) - CephPRG/5/102-23/003'11-07-2023Usama YousufSenior Officer Production14-11-2024Niaz Ali JatoiPrevious logbook retrieved by IPC Ceph. S/07Production Ceph
Machine Equipment Logbook - Coating Machine - CephPRG/5/102-23/002'''''11-07-2023Usama YousufSenior Officer Production  Previous logbook retrieved by IPC Ceph. S/08Production Ceph
Machine Equipment Logbook - Water Bath - CephPRG/5/102-23/002'''''''11-07-2023Usama YousufSenior Officer Production  Previous logbook retrieved by IPC Ceph. S/09Production Ceph
Machine Equipment Logbook - Silver Sun Mixer - CephPRG/5/102-23/002''''''''11-07-2023Usama YousufSenior Officer Production  Previous logbook retrieved by IPC Ceph. S/10Production Ceph
Machine Equipment Logbook - Auto Labeller - CephPRG/5/102-23/002'''''''''11-07-2023Usama YousufSenior Officer Production  Previous logbook retrieved by IPC Ceph. S/11Production Ceph
Machine Equipment Logbook - Ampoule Washing Machine -CephPRG/5/102-23/002''''''''''11-07-2023Usama YousufSenior Officer Production26-12-2023Niaz Ali JatoiLogbook is closed on page # 03 and retrieved by QA IPC. New logbook is issued for Ceph equipment . S/12Production Ceph
Machine Equipment Logbook - Vial Washing Machine - CephPRG/5/102-23/002"11-07-2023Usama YousufSenior Officer Production26-12-2023Niaz Ali JatoiLogbook is closed on page # 08 and retrieved by IPC Ceph. New Logbook of ceph equipment (PCG/5/030). S/13Production Ceph
Machine Equipment Logbook - Suspension Filling Machine - CephPRG/5/102-23/002""11-07-2023Usama YousufSenior Officer Production10-05-2024Niaz Ali JatoiS/14. Retrieved by IPC CephProduction Ceph
Cleaning and verification of weighing balance - Avery Berkel-405 Belt 04- PackingPMG/5/022-23/00111-07-2023Abdul BasitAM Production  S/65Production Non-Ceph
Cleaning and verification of weighing balance - SL-15K - Master Cartons Tare Weight - PackingPMG/5/023-23/00111-07-2023Abdul BasitAM Production  S/64Production Non-Ceph
PM Testing Logbook for Adhesive Tape and DI - ZainQCP/5/01923/00512-07-2023Zain ul HadiOfficer QC20-10-2023Nasrullah MajeedS/45Quality Control
        Select
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/01709-05-2023Affan Bin SafdarOfficer QC25-05-2023Niaz Ali JatoiS/1166Quality Control
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-02 - 75KWENG/5/017-23/00718-07-2023Hasnain ShabbirSenior Officer Engineering21-11-2023Niaz Ali JatoiPrevious logbook ENG/5/017-23/006 is retrieved. S/11Engineering
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-02 - 75KWENG/5/017-23/00718-07-2023Hasnain ShabbirSenior Officer Engineering21-11-2023Niaz Ali JatoiPrevious logbook ENG/5/017-23/006 is retrieved. S/11-Duplicate entryEngineering
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-01 - 55KWENG/5/017-23/00118-07-2023Hasnain ShabbirSenior Officer Engineering21-11-2023Niaz Ali JatoiS/12Engineering
Finished Good Testing Logbook - Saman Barlas - StabilityQCG/5/015-23/00619-07-2023Saman BarlasOfficer QC21-09-2023Niaz Ali JatoiS/47Quality Control
Finished Good Testing Logbook - Saman Barlas - StabilityQCG/5/015-23/00619-07-2023Saman BarlasOfficer QC  S/47Quality Control
Daily Cleaning Logbook of IPC Equipment - Leakage Tester - NCQAN/5/001-23/00919-07-2023Abdul Wahab ShahSenior Executive QC22-03-2024Nasarullah MajeedS/04Quality Assurance
WIP In and Out Record Form - Non-CephPMG/5/011-23/00819-07-2023Shahid Ali JhakExecutive Production28-08-2024Niaz Ali JatoiS/66Production Non-Ceph
Packaging Material Incoming Logbook for PharmEvoQCP/5/005-23/00420-07-2023Farhat Subhan KhattakSenior Executive QC13-02-2024Niaz Ali JatoiS/48Quality Control
Tablet Tooling Periodic Inspection Log - Compression Machine - ZPW23PMG/5/049-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous PRG/5/018-22/001 - S/860 .....S/81Production Non-Ceph
Tablet Tooling Periodic Inspection Log - Compression Machine - Fette 3030 & T 700PMG/5/049-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/018-22/001 - S/858. Current S/80Production Non-Ceph
Tablet Tooling Periodic Inspection Log - Compression Machine - ZPW26 A/BPMG/5/049-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/018-22/001 - S/878. Current S/79Production Non-Ceph
Tablet Tooling Periodic Inspection Log - Compression Machine - ZP37-B-1PMG/5/049-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/018-22/001 - S/859. Current S/78Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZPW26 - BPMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/021-22/001 - S/876. Current S/77Production Non-Ceph
New Tooling Inspection Form for Non-Ceph ProductionPRG/5/017-23/00224-07-2023Shahid Ali JhakExecutive Production25-07-2023Niaz Ali JatoiLogbook format is revised. New logbook is issued as PMG/5/048-23/001. S/83Production Non-Ceph
Dies and Punches Issuance, Receiving, Inspection and Maintenance LogPRG/5/016-23/00224-07-2023Shahid Ali JhakExecutive Production25-07-2023Niaz Ali JatoiLogbook format is revised. New logbook is issued as PMG/5/047-23/001.Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZP23/DPMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/021-22/001 - S/968. Current S/74Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZPW26PMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/021-22/001 - S/857. Current S/73Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZPW23PMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production08-11-2024Niaz Ali JatoiPrevious: PRG/5/021-22/001 - S/856. Current S/72Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZP37-B-IIPMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/021-22/001 - S/879. Current S/71Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - Fette 3030 & T700PMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/021-22/001 - S/854. Current S/70Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - T700PMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production  Previous: PRG/5/021-22/001 - S/874. Current S/69Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZP37-BPMG/5/052-23/00124-07-2023Shahid Ali JhakExecutive Production08-11-2024Niaz Ali JatoiPrevious: PRG/5/021-22/001 - S/855. Current S/68Production Non-Ceph
Monitoring of Differential Pressure for Compression Tool RoomPMG/5/013-23/00224-07-2023Shahid Ali JhakExecutive Production  S/67Production Non-Ceph
Dies and Punches Issuance, Receiving, Inspection and Maintenance LogPRG/5/016-23/00224-07-2023Shahid Ali JhakExecutive Production25-07-2023Niaz Ali JatoiLogbook format is revised. New logbook is issued as PMG/5/047-23/001. S/82Production Non-Ceph
New Tooling Inspection Form for Non-Ceph ProductionPRG/5/017-23/00224-07-2023Shahid Ali JhakExecutive Production25-07-2023Niaz Ali JatoiLogbook format is revised. New logbook is issued as PMG/5/048-23/001. S/83Production Non-Ceph
Tablet Tooling Periodic Inspection Log - Fette 3030 & T 700 - BPMG/5/049-23/00124-07-2023Shahid Ali JhakExecutive Production  S/84Production Non-Ceph
Tablet Tooling Periodic Inspection Log - Compression Machine - ZP37 B-IIPMG/5/049-23/00124-07-2023Shahid Ali JhakExecutive Production  S/85Production Non-Ceph
PM Testing Logbook for U/C & M/C - Rimsha YousufQCP/5/02123/00822-05-2023Rimsha YousufOfficer QC27-07-2023Niaz Ali JatoiPrevious logbook QCP/5/021-23/007 is retrievedQuality Control
PM Testing Logbook for Unit Carton and Master Carton - Rimsha YousufQCP/5/021-23/00927-07-2023Rimsha YousufOfficer QC21-09-2023Niaz Ali JatoiS/52Quality Control
Microbiological Testing Report of Nutraceutical ProductsQCM/5/049-23/00326-07-2023Mehran KhanSenior Executive QC16-04-2024Niaz Ali JatoiS/50Quality Control
Microbiological Testing Report for Nutraceutical Products - ValidationQCM/5/049-23/00126-07-2023Mehran KhanSenior Executive QC27-05-2024Niaz Ali JatoiS/51Quality Control
General Usage Logbook - Dissolution Apparatus No.03QCI/5/030-23/00227-07-2023Masood ur RehmanSenior Executive QC23-01-2024Niaz Ali JatoiS/53Quality Control
Tablet Tooling Removal and Destruction Log - Non - CephPMG/5/050-23/00124-07-2023Shahid Ali JhakExecutive Production  S/90Production Non-Ceph
General Equipment Logbook - Balance No.04QCI/5/030-23/00802-08-2023Masood ur RehmanSenior Executive QC15-12-2023Niaz Ali JatoiS/54Quality Control
Usage Logbook for Analytical Balance No.05 - QC PackagingQCI/5/030-23/00503-08-2023Imran GhouriExecutive QC01-01-1900 S/56Quality Control
Finished Good Testing Logbook - Fatima LaraibQCG/5/015-23/00102-08-2023Fatima LaraibSenior QC Officer01-11-2023Niaz Ali JatoiS/55Quality Control
Conveyor Belt Logbook - Belt No. 07 - NCPMG/5/040-23/00407-08-2023Abdul BasitAM Production26-03-2024Nasrullah MajeedS/91Production Non-Ceph
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2204-08-2023Affan Bin SafdarOfficer QC25-08-2023Niaz Ali JatoiS/057Quality Control
Logbook of IPC Equipment - Moisture Analyzer - Non-CephQAN/5/001-23/00308-08-2023Muhammad HabibSenior Officer QA15-08-2024Niaz Ali JatoiS/06Quality Assurance
PM Testing Logbook for Lid and Base Foil - Zain ul HadiQCP/5/018-23/00708-08-2023Zain ul HadiOfficer QC23-11-2023Niaz Ali JatoiS/58Quality Control
PM Testing Logbook for Lid and Base Foil - Zain ul HadiQCP/5/018-23/00520-03-2023Zain ul HadiQC Officer Packaging01-06-2023Niaz Ali JatoiRetrievedQuality Control
PM Testing Logbook for Lid and Base Foil - Imran GhouriQCP/5/018-23/00421-03-2023Imran GhouriExecutive QC01-06-2023Niaz Ali JatoiRetrievedQuality Control
PM Testing Logbook for Lid and Base Foil - Zain ul HadiQCP/5/018-23/00601-06-2023Zain ul HadiOfficer QC08-08-2023Niaz Ali JatoiRetrieved - S/27Quality Control
PM Testing Logbook for Lid and Base Foil - Zain ul HadiQCP/5/018-23/00601-06-2023Zain ul HadiOfficer QC08-08-2023Niaz Ali JatoiRetrieved - S/27Quality Control
Machine / Equipment Logbook - ZP19 Compression Machine - NutraPNG/5/001-23/00108-08-2023Syed Baqar AliSenior Executive Production  S/07Production Nutraceutical
Machine / Equipment Logbook - Auto Labeller - NutraPNG/5/001-23/00108-08-2023Syed Baqar AliSenior Executive Production09-09-2024Niaz Ali JatoiS/08Production Nutraceutical
Machine / Equipment Logbook - Capper Machine - NutraPNG/5/001-23/00108-08-2023Syed Baqar AliSenior Executive Production23-09-2024Niaz Ali JatoiS/09Production Nutraceutical
Machine / Equipment Logbook - Induction Sealing Machine - NutraPNG/5/001-23/00108-08-2023Syed Baqar AliSenior Executive Production19-09-2024Niaz Ali JatoiS/10Production Nutraceutical
Machine / Equipment Logbook - Packing Belt No.02 - NutraPNG/5/001-23/00108-08-2023Syed Baqar AliSenior Executive Production  S/11Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Double Cone BlenderPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production25-10-2024Niaz Ali JatoiS/12Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Blister AreaPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production28-10-2024Niaz Ali JatoiS/13Production Nutraceutical
Monitoring of Differential Pressure in Nutra - BGK-150 CoatingPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production16-10-2024Niaz Ali JatoiS/14Production Nutraceutical
Monitoring of Differential Pressure in Nutra - ZP19 CompressionPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production30-10-2024Niaz Ali JatoiS/15Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Tablet Filling AreaPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production  S/16Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Liquid Filling AreaPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production04-12-2024Niaz Ali JatoiS/17Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Liquid ManufacturingPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production04-12-2024Niaz Ali JatoiS/18Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Soft Gel areaPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production  S/19Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Sachet FillingPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production23-10-2024Niaz Ali JatoiS/20Production Nutraceutical
Monitoring of Differential Pressure in Nutra - ZPW20 CompressionPNG/5/007-23/00208-08-2023Syed Baqar AliSenior Executive Production07-10-2024Niaz Ali JatoiS/21Production Nutraceutical
Microbial Count Report - Non-CephQCM/5/019-23/00410-08-2023Mehran KhanSenior Executive QC11-01-2024Niaz Ali JatoiS/060Quality Control
Microbiological Media Preparation - Non-CephQCM/5/016-23/00210-08-2023Mehran KhanSenior Executive QC12-02-2024Niaz Ali JatoiS/61Quality Control
Microbiological Media Preparation - CephQCM/5/016-23/00210-08-2023Muzaffar AliSenior Executive QC14-05-2024Niaz Ali JatoiS/62 - QA IPCQuality Control
Environmental Monitoring Report by Settle Plate of Sterile Area CephQCM/5/024-23/00511-08-2023Muzaffar AliSenior Executive QC  S/63Quality Control
General Usage Logbook of HPLC for HPLC No.15QCI/5/060-23/00111-08-2023Daniyal KhalidExecutive QC  New HPLC. S/64Quality Control
Finished Good Testing Logbook - Saman Barlas - StabilityQCG/5/015-23/00513-06-2023Saman BarlasOfficer QC19-07-2023Niaz Ali JatoiPrevious logbook QCG/5/015-23/004 is retrieved on 13/06/2023.Quality Control
PM Testing Logbook for Lid and Base Foil - Rimsha YousufQCP/5/018-23/00421-08-2023Rimsha YousufOfficer QC23-02-2024Niaz Ali JatoiS/65Quality Control
PM Testing Logbook for Lid and Base Foil - Rimsha YousufQCP/5/018-23/00316-05-2023Rimsha YousufOfficer QC21-08-2023Niaz Ali JatoiS/02Quality Control
PM Testing Logbook for Lid and Base Foil - Imran GhouriQCP/5/018-23/00501-06-2023Imran GhouriExecutive QC08-08-2023Niaz Ali JatoiS/26Quality Control
Inspection and Sampling Report of Packaging Materials - Imran GhouriQCP/5/014-23/00927-03-2023Imran GhouriExecutive QC03-04-2023Niaz Ali JatoiS/1113Quality Control
Usage Logbook for Analytical balance No-05 QC packagingQCI/5/030-24/00805-01-2024Imran GhouriExecutive QC13-03-2024Nasarullah MajeedPrevious logbook QCI/5/030-23/007 RetrievedQuality Control
Usage Logbook for Analytical Balance No.05 - QC PackagingQCI/5/030-23/00503-08-2023Imran GhouriExecutive QC  S/56Quality Control
        Select
Cleaning and verification of weighing balance - PAIR - CEPH WIPPCG/5/024-23/00223-08-2023Osama YousufOfficer Production Ceph26-12-2024Niaz Ali JatoiS/16Production Ceph
Daily Log sheet for Centrifugal ChillerENG/5/001-23/01019-06-2023Hasnain ShabbirSenior Officer Engineering24-08-2023Niaz Ali JatoiS/04Engineering
Daily Log sheet for Centrifugal ChillerENG/5/001-23/01124-08-2023Hasnain ShabbirSenior Officer Engineering25-10-2023Niaz Ali JatoiS/13Engineering
Daily Temperature and Humidity Monitoring Log - Tablet FillingPNG/5/008-23/00225-08-2023Syed Baqar AliSenior Executive Production  S/30Production Nutraceutical
Daily Temperature and Humidity Monitoring Log - Blistering AreaPNG/5/008-23/00225-08-2023Hasnain ShabbirSenior Executive Production  S/22Production Nutraceutical
Daily Temperature and Humidity Monitoring Log - BGK-150 Coating AreaPNG/5/008-23/00225-08-2023Hasnain ShabbirSenior Executive Production  S/23Production Nutraceutical
Daily Temperature and Humidity Monitoring Log - Double Cone BlenderPNG/5/008-23/00225-08-2023Hasnain ShabbirSenior Executive Production  S/24Production Nutraceutical
Daily Temperature and Humidity Monitoring Log - ZP19 - CompressionPNG/5/008-23/00225-08-2023Syed Baqar AliSenior Executive Production  S/25Production Nutraceutical
Daily Temperature and Humidity Monitoring Log - Packing HallPNG/5/008-23/00225-08-2023Syed Baqar AliSenior Executive Production  S/26Production Nutraceutical
Daily Temperature and Humidity Monitoring Log - ZPW20 - CompressionPNG/5/008-23/00225-08-2023Syed Baqar AliSenior Executive Production  S/27Production Nutraceutical
Cleaning and Housekeeping Log of Nutraceutical BuildingPNG/5/009-23/00325-08-2023Syed Baqar AliSenior Executive Production12-08-2024Niaz Ali JatoiS/29Production Nutraceutical
Disinfectant Preparation Logbook for NutraPNG/5/016-23/00125-08-2023Syed Baqar AliSenior Executive Production  S/28Production Nutraceutical
PM Testing Logbook for Adhesive Tape and DI - Rimsha YousufQCP/5/019-23/00625-08-2023Rimsha YousufOfficer QC20-12-2023Nasrullah MajeedS/66Quality Control
PM Testing Logbook for Adhesive Tape and DI - Rimsha YousufQCP/5/01923/00516-06-2023Rimsha YousufOfficer QC25-08-2023Niaz Ali JatoiS/035Quality Control
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/01921-06-2023Affan Bin SafdarOfficer QC12-07-2023Niaz Ali JatoiS/40Quality Control
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/02012-07-2023Affan Bin SafdarOfficer QC04-08-2023Niaz Ali JatoiS/46Quality Control
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2225-08-2023Affan Bin SafdarOfficer QC13-09-2023Niaz Ali JatoiS/067Quality Control
Logbook for Batch Document Issuance General PharmaQAG/5/115-23/00504-09-2023Syed Asif HussainOffice Assistant  S/07Quality Assurance
WIP In and Out Record Form - Non-CephPRW/5/001-23/00904-09-2023Shahid Ali JhakSenior Executive Production10-07-2024Niaz Ali JatoiS/92Production Non-Ceph
General Equipment Logbook - Polari Meter - ADP-430QCI/5/030-23/00128-08-2023Asma TanveerExecutive QC  S/069Quality Control
Preventive Maintenance Checklist of facility - Non-CephENG/5/050-23/00206-09-2023Hasnain ShabbirExecutive Engineering  S/15Engineering
Preventive Maintenance Checklist of facility - CephENG/5/050-23/00206-09-2023Hasnain ShabbirExecutive Engineering  S/14Engineering
General Usage Logbook of for Dissolution Apparatus No.04QCI/5/0306-09-2023Syed Masood ShahAM QC07-03-2024Niaz Ali JatoiS/70Quality Control
Equipment / Machine Log book - BM-350-B Non-CephPRG/5/102-23/00606-09-2023Abdul GhaniSenior Executive Production30-11-2023Niaz Ali JatoiS/93Production Non-Ceph
Column Usage Logbook for HPLCsQCG/5/072-23/00211-09-2023Masood ur RehmanAssistant Manager QC01-01-1900 S/073Quality Control
General Equipment Logbook - UV Spectophotometer No.03 (840-341400)QCI/5/030-23/00111-09-2023Daniyal KhalidSenior Executive QC  S/74Quality Control
General Equipment Logbook - Balance No.03QCI/5/030-23/00311-09-2023Daniyal KhalidSenior Executive QC  S/075Quality Control
Logsheet for operation of Reverse Osmosis PlantENO/5/084-23/00812-09-2023Azeemul ZafarOperator  S/16Engineering
Logsheet for Operation of Ultra Filtration PlantENO/5/083-23/00812-09-2023Azeemul ZafarOperator  S/17Engineering
Daily Temperature and Humidity Monitoring Log - Sachet Filling NutraPNG/5/008-23/00213-09-2023Syed Baqar AliAM Production  S/31Production Nutraceutical
PM Testing Logbook for Unit Cartons and Master Cartons - Imran GhouriQCP/5/021-23/00720-06-2023Imran GhouriExecutive QC12-09-2023Niaz Ali JatoiS/36Quality Control
Daily Operation Report of BoilerENG/5/006-23/01312-09-2023Hasnain ShabbirExecutive Engineering10-11-2023Niaz Ali JatoiS/018Engineering
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2313-09-2023Affan Bin SafdarSenior Officer QC09-10-2023Niaz Ali JatoiS/078Quality Control
General Usage Logbook for HPLC - HPLC No.01PDG/5/105-23/00113-09-2023Nadeem MuradAM PD  S/05Product Development
General Usage Logbook of HPLC - HPLC No.02PDG/5/105-23/00113-09-2023Nadeem MuradAM PD  S/06Product Development
General Usage Logbook of HPLC - HPLC No.03PDG/5/105-23/00113-09-2023Nadeem MuradAM PD  S/07Product Development
General Usage Logbook of HPLC - HPLC No.04PDG/5/105-23/00113-09-2023Nadeem MuradAM PD  s/08Product Development
General Usage Logbook of HPLC - HPLC No.05PDG/5/105-23/00113-09-2023Nadeem MuradAM PD  S/09Product Development
PM Testing Logbook for General Packaging Material - Zain ul HadiQCP/5/020-23/00314-09-2023Zain ul HadiSenior Officer QC01-08-2024Nasrullah MajeedS/80, Logbbok RetreivedQuality Control
PM Testing Logbook for Unit Cartons & Master Cartons - Zain ul HadiQCP/5/021-23/00914-09-2023Zain ul HadiSenior Officer QC30-01-2024Niaz Ali JatoiS/79Quality Control
Logbook for verification of Weighing Balance - Metler Toledo - 204 T - IPC Non-CephQAG/5/258-23/00213-09-2023Abdul Wahab ShahSenior Executive QA  S/08Quality Assurance
Sample and Annexures of Validation Record for Liquid/Sachet/injectables - CephQAV/5/067-23/00114-09-2023Aqib KhanDeputy Manager QA  S/09Quality Assurance
Daily Logsheet of Water Management SystemENG/5/004-23/00814-09-2023Azeemul ZafarOperator28-12-2023Niaz Ali JatoiS/19Engineering
Cleaning and verification of weighing balance - Manufacturing - WB-PD-01PDG/5/019-23/00114-09-2023Ishtiaque AhmedSenior Executive PD01-01-1900 S/10Product Development
Cleaning and verification of weighing balance - Compression - WB-PD-05PDG/5/019-23/00114-09-2023Ishtiaque AhmedSenior Executive PD  S/11Product Development
Vendor Sample (RM/PM) Incoming LogbookQCG/5/047-23/00120-09-2023Muhammad AnwarAM QC  S/82Quality Control
PM Testing Logbook for U/C & M/C - Rimsha YousufQCP/5/021-23/01021-09-2023Rimsha YousufSenior Officer QC29-12-2023Niaz Ali JatoiS/83Quality Control
Batch History Audit Log Book - CephQAG/5/018-23/00225-09-2023Sajjad Hussain QureshiSenior Executive Production  S/10Quality Assurance
General Usage Logbook - Semi Micro BalanceQCI/5/030-23/00325-09-2023Daniyal KhalidSenior Executive QC23-02-2024Niaz Ali JatoiS/85Quality Control
General Usage Logbook - Dissolution Apparatus No.05QCI/5/030-23/00325-09-2023Daniyal KhalidSenior Executive QC05-03-2024Niaz Ali JatoiS/84Quality Control
Finished Product Testing Log Book - Saman BarlasQCG/5/015-23/00725-09-2023Saman BarlasSenior Officer QC12-01-2024Niaz Ali Jatoi Quality Control
Conveyor Belt Logbook - Belt No. 01 - NCPMG/5/040-23/00426-09-2023Abdul BasitDeputy Manager Production22-05-2024Niaz Ali JatoiS/95Production Non-Ceph
PM Testing Logbook for Adhesive Tape and DI - Imran GhouriQCP/5/019-23/00727-09-2023Imran GhouriExecutive QC12-01-2024Niaz Ali JatoiS/88Quality Control
Logsheet for Distilled Water PlantPCG/5/014-23/00803-10-2023Adnan Ali KhanOperator08-12-2023Niaz Ali JatoiS/17Production Ceph
Logsheet for Distilled Water PlantPCG/5/014-23/00726-06-2023Adnan Ali KhanOperator03-10-2023Niaz Ali JatoiS/005Production Ceph
Cleaning Logsheet of Sterility Test AreaQCM/5/048-23/00202-10-2023Muzaffar AliSenior Executive QC23-08-2024Niaz Ali JatoiS/89Quality Control
Finger Touch Report of Cephalosporin Sterile AreaQCM/5/017-23/00203-10-2023Muzaffar AliSenior Executive QC  S/90Quality Control
Finger Touch Report of Sterility Test CephQCM/5/018-23/00203-10-2023Muzaffar AliSenior Executive QC23-08-2024Niaz Ali JatoiS/91Quality Control
Log sheet of Hot Incubator - CephQCM/5/032-23/00102-10-2023Muzaffar AliSenior Executive QC05-08-2024Niaz Ali JatoiS/92Quality Control
Log sheet of cool IncubatorQCM/5/029-23/00102-10-2023Muzaffar AliSenior Executive QC  S/93Quality Control
Sterility Test ReportQCM/5/044-23/00202-10-2023Muzaffar AliSenior Executive QC02-04-2024Niaz Ali JatoiS/94 - Ceph. IPCQuality Control
VERIFICATION LOGBSHEET FOR TOP LOAD BALANCE – SHIMADZU UX 3200G – QC CEPHQCI/5/047-23/00102-10-2023Muzaffar AliSenior Executive QC  S/95Quality Control
Signature Verification RegisterQAG/5/107-23/00103-10-2023Hamza AnsariOffice Assistant01-01-1900 S/11Quality Assurance
Equipment / Machine Log book - Roller Compactor - Non-CephPRG/5/102-23/00128-09-2023Shahrukh SaleemSenior Executive Production22-08-2024Niaz Ali JatoiS/96Production Non-Ceph
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2409-10-2023Affan Bin SafdarSenior Officer QC27-10-2023Niaz Ali JatoiS/97Quality Control
Usage Logbook for Analytical Balance No.05 - QC PackagingQCI/5/030-23/00712-10-2023Imran GhouriExecutive QC05-01-2024Nasrullah MajeedS/98Quality Control
Usage Logbook for Analytical Balance No.05 - QC PackagingQCI/5/030-23/00603-08-2023Imran GhouriExecutive QC12-10-2023Niaz Ali JatoiS/56Quality Control
Daily Monitoring of Differential Pressure in Sterile Filling RoomPCG/5/013- 23/00213-10-2023Usama YousufSenior Officer Production15-11-2023Niaz Ali JatoiS/18Production Ceph
Machine Equipment Logbook - Blister Machine BM350-E- NCPRG/5/102-23/00613-10-2023Abdul GhaniSenior Executive Production  S/97Production Non-Ceph
Environmental Monitoring Report by Settle Plate of Sterility Lab CephQCM/5/025-23/00202-10-2023Muzaffar AliSenior Executive QC23-08-2024Niaz Ali JatoiS/96Quality Control
Machine Equipment Logbook - Compactor - NCPRG/5/102-23/00417-10-2023Shahrukh SaleemSenior Executive Production02-07-2024Niaz Ali JatoiS/98Production Non-Ceph
PM Testing Logbook for General Packaging Material - Imran GhouriQCP/5/020-23/00424-10-2023Imran GhouriExecutive QC25-06-2024Niaz Ali JatoiS/106Quality Control
Daily Monitoring of Temperature and Rh in Granulation Area - NutraPNG/5/008-23/00125-10-2023Syed Baqar AliAssistant Manager Production (Nutra)  S/33Production Nutraceutical
Machine Equipment Logbook - Fluid Bed Dryer - NutraPNG/5/001-23/00125-10-2023Syed Baqar AliAssistant Manager Production (Nutra)  S/34Production Nutraceutical
Machine Equipment Logbook - Gral Mixer - NutraPNG/5/001-23/00125-10-2023Syed Baqar AliAssistant Manager Production (Nutra)  S/36Production Nutraceutical
Monitoring of Differential Pressure in Granulation - NutraPNG/5/007-23/00125-10-2023Syed Baqar AliAssistant Manager Production (Nutra)  S/35Production Nutraceutical
Daily Log sheet for Centrifugal ChillerENG/5/001-23/01225-10-2023Muhammad Ali ShaikhOfficer Engineering26-12-2023Niaz Ali JatoiS/20Engineering
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-23/00624-10-2023Mehran KhanSenior Executive QC20-01-2024Niaz Ali JatoiS/107Quality Control
WIP In and Out Record Form - Non-CephPMG/5/011-23/1018-10-2023Shahid Ali JhakSenior Executive Production  S/99Production Non-Ceph
Equipment / Machine Log book - Blister BM350-D Non-CephPRG/5/102-23/00520-10-2023Abdul GhaniSenior Executive Production23-02-2024Niaz Ali JatoiS/100Production Non-Ceph
Machine Equipment Logbook - Fluid Bed Dryer (120kg) - NCPRG/5/102-23/00627-10-2023Shahrukh SaleemSenior Executive Production27-02-2024Niaz Ali JatoiS/101Production Non-Ceph
Equipment / Machine Log book - ZPW23 Compression Machine- Non-CephPRG/5/102-23/00427-10-2023Shahrukh SaleemSenior Executive Production01-04-2024Niaz Ali JatoiS/102Production Non-Ceph
HPLC Column Usage LogbookPDG/5/106-23/00131-10-2023Nadeem MuradAssistant Manager PD  Issued by : NAJProduct Development
Receiving Logbook for Contract Manufacturing ProductsPDG/5/109-23/00131-10-2023Nadeem MuradAssistant Manager PD  Issued by: NAJProduct Development
Machine Equipment Logbook - GHL - NCPRG/5/102-23/00501-11-2023Shahrukh SaleemSenior Executive Production29-02-2024Niaz Ali JatoiS/103Production Non-Ceph
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2501-11-2023Affan Bin SafdarSenior Officer QC16-11-2023Niaz Ali Jatoi Quality Control
Microbiological Testing Report for Pharmaceutical production - ValidationQCM/5/057-23/00524-07-2023Nida ZehraOfficer QC30-10-2023Niaz Ali Jatoi Quality Control
Cleaning Verification of Weighing Balance - Packing Hall - Avery BerkelPCG/5/024-23/00203-11-2023Mazhar AliExecutive Production26-12-2024Niaz Ali JatoiS/19Production Ceph
Cleaning and verification of weighing balance in Sachet Filling Nutra - WH-NUT-SF-01PNG/5/002-23/00203-11-2023Syed Baqar AliAM Production  Issued by : NAJProduction Nutraceutical
Machine Equipment Logbook - Gral Mixer - NCPRG/5/102-23/00603-11-2023Shahrukh SaleemSenior Executive Production04-03-2024Niaz Ali JatoiIssued by: NAJProduction Non-Ceph
Stability Protocol Report Number Issuance Logbook - QC NCQCG/5/186-23/00106-11-2023Daniyal KhalidSenior Executive QC30-08-2024Niaz Ali JatoiS/314Quality Control
Finish Product Incoming Logbook - Toll ClientQCG/5/083-23/00106-11-2023Rabab FatimaSenior Executive QC  Issued by : NAJQuality Control
Logbook for 2D Barcode Printing Machine Non-Ceph., PAK-01-31-02PMG/5/031-23/00207-11-2023Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/103Production Non-Ceph
Finish Product Incoming Logbook of QC Non-CephQCG/5/083-23/00806-11-2023Syed Asif AliSenior Executive QC  Issued by: NAJQuality Control
Daily Operation Report of BoilerENG/5/006-23/01410-11-2023Hasnain ShabbirExecutive Engineering11-01-2024Niaz Ali JatoiIssued by: NAJEngineering
Retention Sample Logbook - Non - CephQAG/5/032-23/00410-11-2023Hamza AhmedExecutive QA  Issued by : NAJQuality Assurance
Machine Equipment Logbook - ZP37 B-I Compression Machine - NCPRG/5/102-23/00413-11-2023Shahid Ali JhakSenior Executive Production15-03-2024Nasrullah MajeedIssued by: NAJProduction Non-Ceph
Logbook for Induction Sealing MachinePCP/5/009-23/00113-11-2023Usama YousufSenior Officer Production  Issued by: NAJProduction Ceph
Cleaning and verification of weighing balance - Metler - WB-NUT-TF-03PNG/5/002-23/00114-11-2023Baqar AliAssistant Manager Production (Nutra)  Issued by: NAJProduction Nutraceutical
Daily Usage of IPC Equipment - Friability Tester PTF200 - Non-CephQAN/5/001-23/00315-11-2023Abdul Wahab ShahSenior Executive QA30-07-2024Niaz Ali JatoiS/14Quality Assurance
Daily Monitoring of Differential Pressure in Sterile Filling RoomPCG/5/013- 23/00315-11-2023Usama YousufSenior Officer Production09-09-2024Niaz Ali JatoiS/21Production Ceph
Machine Equipment Logbook - ZP17 Compression Machine - Ceph.PCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Machine Equipment Logbook - Manual Coating Pan 24 - NCPRG/5/102-23/00315-11-2023Shahid Ali JhakSenior Executive Production08-03-2024Niaz Ali JatoiIssued by : NAJProduction Non-Ceph
Equipment Logbook of Sterlizer Dry Heat Sterilize (DHS) - CephPCG/5/011-23/00315-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Equipment Logbook of Sterlizer - Autoclave - CephPCG/5/011-23/00215-11-2023Usama YousufSenior Officer Production09-09-2024Niaz Ali JatoiS/24Production Ceph
Machine / Equipment Logbook - Ampoule Filling MachinePCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Machine / Equipment Logbook - Ceph - Ambica FillingPCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Equipment / Machine Log book - Fitz Mill - CephPCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Equipment / Machine Log book - Tray Dryer - CephPCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Over printing Logbook for 2D Barcode Printing Machine - CephPCP/5/011-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Equipment / Machine Log book - Packing Conveyor Belt - CephPCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production04-12-2024Niaz Ali JatoiS/30Production Ceph
Equipment / Machine Log book - Vial Sealing Machine - CephPCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Equipment / Machine Log book - China Blister Machine - CephPCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Equipment / Machine Log book - Air Blowing Machine - CephPCG/5/030-23/00115-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Equipment / Machine Log book - Zanassi - CephPCG/5/030-23/00215-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Vial and ampoule crushing machine logbook in Ceph - VIAL MachinePCG/5/008-23/00216-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Vial and ampoule crushing machine logbook in Ceph - Ampoule MachinePCG/5/008-23/00216-11-2023Usama YousufSenior Officer Production  Issued by : NAJProduction Ceph
Machine Equipment Logbook - Granulator - 03 (G2) - NCPRG/5/102-23/00420-11-2023Shahrukh SaleemSenior Executive Production30-04-2024Niaz Ali JatoiIssued by : NAJProduction Non-Ceph
Finished Good Testing Logbook - F.G.QCG/5/015-23/00320-11-2023Maham MalikSenior Officer QC  Issued by : NAJQuality Control
PM Testing Logbook for Lid and Base Foil - Zain ul HadiQCP/5/018-23/00821-11-2023Zain ul HadiOfficer QC05-01-2024Nasrullah MajeedLogbook retrievedQuality Control
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-02 - 75KWENG/5/017-23/00821-11-2023Muhammad Ali ShaikhOfficer Engineering19-03-2024Nasarullah MajeedIssued by : NAJEngineering
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-01 - 55KWENG/5/017-23/00221-11-2023Muhammad Ali ShaikhOfficer Engineering19-03-2024Nasarullah MajeedIssued by : NAJEngineering
Finished Good Testing Logbook - Hassan SiddiquiQCG/5/015-23/00221-11-2023Hassan SiddiquiOfficer QC10-05-2024Niaz Ali JatoiS/116Quality Control
Finished Good Testing Logbook - Bilal Ali KhanQCG/5/015-23/00121-11-2023Bilal Ali KhanOfficer QC26-02-2024Niaz Ali JatoiIssued by : NAJQuality Control
Finished Good Testing Logbook - Fatima LaraibQCG/5/015-23/00221-11-2023Fatima LaraibSenior Officer QC  Issued by : NAJQuality Control
Equipment / Machine Log book - ZP37 B-II-- Compression Machine- CephPRG/5/102-23/00421-11-2023Shahid Ali JhakSenior Executive Production30-04-2024Niaz Ali JatoiIssued by : NAJProduction Non-Ceph
Logbook for Mobile Phase PreparationQCG/5/025-23/00421-11-2023Syed Asif AliSenior Executive QC02-07-2024Niaz Ali JatoiS/119Quality Control
Finish Product Incoming Logbook of QC NutraQCG/5/083-23/00414-11-2023Daniyal KhalidSenior Executive QC  Issued by : NAJQuality Control
Machine / Equipemnt Logbook Fluid Bed Dryer (60kg)PRG/5/102-23/00423-11-2023Shahrukh SaleemSenior Executive Production26-04-2024Niaz Ali JatoiIssued by : Nasrullah MajeedProduction Non-Ceph
Finished Product Testing Logbook - Sufiyan RazaQCG/5/015-23/00224-11-2023Sufiyan RazaExecutive QC  Issued by : NAJQuality Control
Finished Good Testing Logbook - Naeem KhanQCG/5/015-23/00128-11-2023Naeem KhanOfficer QC  Issued by : NAJQuality Control
Cleaning and verification of weighing balance - Packing Hall CA5-BI-100D - CEPHPCG/5/024-23/00227-11-2023Usama YousufSenior Officer Production26-12-2024Niaz Ali JatoiS/37Production Ceph
Cleaning & Verification of Weighing BalanceWHG/5/004-21/00105-05-2021ArsalanWarehouse Operator  S/01Warehouse
Vehicle IN / OUT RegisterADG/5/005-21/00101-06-2021Abdullah (Security)Security Supervisor31-12-2022Niaz Ali JatoiS/02Administration
Equipment / Machine Log book - Blister 350-A Non-CephPRG/5/102-21/00118-06-2021Abdul GhaniExecutive Production10-01-2022Niaz Ali JatoiS/03Production Non-Ceph
Machine / Equipment Log Book - Blister Machine-BM350-B-NCPRG/5/102-21/00121-06-2021Abdul GhaniExecutive Production12-04-2022Niaz Ali JatoiS/04Production Non-Ceph
Machine Equipment Logbook - ZPW-23 Deduster - NCPRG/5/102-23/00424-11-2023Shahid Ali JhakSenior Executive Production06-05-2024Niaz Ali Jatois/112Production Non-Ceph
Machine Equipment Logbook - ZPW23 Metal Detector - NCPRG/5/102-23/00421-11-2023Shahid Ali JhakSenior Executive Production06-05-2024Niaz Ali JatoiS/110Production Non-Ceph
Equipment / Machine Log book - Blister 350-B Non-CephPRG/5/102-23/00730-11-2023Abdul GhaniSenior Executive Production05-04-2024Niaz Ali Jatoi Production Non-Ceph
Logbook for 2D Barcode Printing Machine Non-Ceph., PAK-01-31-05PMG/5/031-23/00230-11-2023Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/114Production Non-Ceph
Equipment / Machine Log book - Blister 350-A Non-CephPRG/5/102-23/00615-09-2023Abdul GhaniSenior Executive Production01-12-2023Niaz Ali JatoiS/94Production Non-Ceph
Equipment / Machine Log book - Blister 350-A Non-CephPRG/5/102-23/00701-12-2023Abdul GhaniSenior Executive Production   Production Non-Ceph
Equipment / Machine Log book - Blister 350-C Non-CephPRG/5/102-23/00601-12-2023Abdul GhaniSenior Executive Production24-04-2024Niaz Ali Jatoi Production Non-Ceph
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2615-11-2023Affan Bin SafdarSenior Officer QC08-12-2023Niaz Ali Jatoi Quality Control
Machine Equipment Logbook - Granulator-01 - NCPRG/5/102-23/00406-12-2023Sultan SikandarOfficer Production22-04-2024Niaz Ali Jatoi Production Non-Ceph
Over Printing Machine Logbook - Ink Jet Printer TJ2002PMG/5/043-23/00407-12-2023Abdul BasitDeputy Manager Production04-06-2024Niaz Ali Jatoi Production Non-Ceph
Machine Equipment Logbook - ZP37 B-I Metal Detector - NCPRG/5/102-23/00308-12-2023Shahid Ali JhakSenior Executive Production03-05-2024Niaz Ali JatoiS/122Production Non-Ceph
Machine Equipment Logbook - Fette P3030 Compression Machine - NCPRG/5/102-23/00407-12-2023Shahid Ali JhakSenior Executive Production23-04-2024Niaz Ali Jatoi Production Non-Ceph
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2706-12-2023Affan Bin SafdarSenior Officer QC21-12-2023Niaz Ali Jatoi Quality Control
Machine Equipment Logbook - ZP37 B-I Deduster - NCPRG/5/102-23/00406-12-2023Shahid Ali JhakSenior Executive Production03-05-2024Niaz Ali JatoiS/119Production Non-Ceph
Logsheet for Distilled Water PlantPCG/5/014-23/00908-12-2023Adnan Ali KhanOperator27-03-2024Niaz Ali JatoiRetrieved by QA IPC Ceph.Production Ceph
Retention Sample Logbook - CephQAG/5/032-23/00108-12-2023Sajjad Hussain QureshiSenior Executive QA   Quality Assurance
Logbook for Temperature Monitoring of Retention Room - Ceph - 01QAG/5/251-23/00101-12-2023Sajjad Hussain QureshiSenior Executive QA   Quality Assurance
Logbook for Temperature Monitoring of Retention Room - Ceph - 02QAG/5/251-23/00108-12-2023Sajjad Hussain QureshiSenior Executive QA   Quality Assurance
General Equipment Usage Logbook - Conductivity Meter - Mettler S230QCI/5/030-23/00511-12-2023Affan Bin SafdarSenior Officer QC26-06-2024Niaz Ali JatoiS/123Quality Control
Sample & Annexures of Validation and Qualification Record - Non-Ceph & NutraQAV/5/066-23/00212-12-2023Aqib KhanDeputy Manager QA   Quality Assurance
Machine Equipment Logbook - BGK 350 Coating Machine - NCPRG/5/102-23/00312-12-2023Shahid Ali JhakSenior Executive Production23-04-2024Niaz Ali JatoiIssued by: NAJProduction Non-Ceph
Cleaning and verification of weighing balance - Omega - Packing Hall CephPCG/5/024-23/00212-12-2023Mazhar AliExecutive Production26-12-2024Niaz Ali JatoiS/39Production Ceph
Machine Equipment Logbook - ZP37 B-II Metal Detector - NCPRG/5/102-23/00413-12-2023Shahid Ali JhakSenior Executive Production25-06-2024Niaz Ali JatoiS/124Production Non-Ceph
Machine Equipment Logbook - ZP37 B-II Deduster - NCPRG/5/102-23/00413-12-2023Shahid Ali JhakSenior Executive Production25-06-2024Niaz Ali JatoiS/125Production Non-Ceph
Finished Product Incoming Logbook - Ceph AreaQCG/5/083-23/00113-12-2023Muzaffar AliSenior Executive QC   Quality Control
Out of Specification LogQCG/5/063-23/00213-12-2023Najeeb FirdousiAssistant Manager QC   Quality Control
Purified Water Testing Report - Narain Malhi - Ceph AreaQCG/5/036-23/00413-12-2023Narain MalhiDeputy Manager QC15-04-2024Niaz Ali Jatoi Quality Control
Logbook for 2D Barcode Printing Machine Non-Ceph., PAK-01-31-01PMG/5/031-23/00215-12-2023Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/126Production Non-Ceph
Machine / Equipment Log Book - Coating Machine BG-150PRG/5/102-23/00203-07-2023Shahid Ali JhakExecutive Production18-12-2023Niaz Ali JatoiS/14Production Non-Ceph
Equipment / Machine Log book - Coating Machine BG-150PRG/5/102-23/00315-12-2023Shahid Ali JhakSenior Executive Production09-04-2024Niaz Ali Jatoi Production Non-Ceph
Equipment Usage Logbook - Analytical Balance No.01 - QC CephQCI/5/030-23/00114-02-2023Narain MalhiAssistant Manager QC18-12-2023Sajjad Hussain QureshiS/1065Quality Control
Equipment Usage Logbook - Analytical Balance No.01 - QC CephQCI/5/030-23/00218-12-2023Aqib AhmedSenior Officer QC18-12-2024Niaz Ali JatoiS/128Quality Control
General Usage Logbook - Balance No. 04QCI/5/030-23/00915-12-2023Daniyal KhalidSenior Executive QC25-04-2024Nasarullah Majeed Quality Control
Daily Usage of IPC Equipment - Disintegration Tester - NutraQAN/5/001-23/00218-12-2023Abdul Wahab ShahSenior Executive QA   Quality Assurance
Water Sampling Logbook - QC Non-CephQCG/5/181-23/00518-12-2023Affan Bin SafdarSenior Officer QC12-06-2024Niaz Ali Jatoi Quality Control
Daily Usage Cleaning Logbook of IPC Equipment Disintegration Tester - Non CephQAN/5/001-23/00419-12-2023Abdul Wahab ShahSr. Executive QA25-09-2024Niaz Ali JatoiS/19Quality Assurance
PM Testing Logbook for Adhesive Tape, Label, and Direction Insert - Rimsha YousufQCP/5/019-23/00720-12-2023Rimsha YousufQC officer07-03-2024Niaz Ali Jatoi Quality Control
Vehicle In/Out RegisterADG/5/005-23/00621-12-2023Ghulam MustafaAdmin Worker18-12-2024Niaz Ali JatoiS/14Administration
Log Sheet for Operation of R.O. PlantENO/5/084-23/00922-12-2023Azeem Ul ZafarOperator05-04-2024Niaz Ali JatoiPrevious logbook ENO/5/084-23/008 retrieved on 22.12.2023Engineering
Log Sheet For Operation of altra filtration plantENO/5/083-23/00922-12-2023Azeem Ul ZafarOperator05-04-2024Niaz Ali JatoiPrevious logbook ENO/5/083-23/008 retrieved on 22.12.2023Engineering
Daily Log sheet of Centrifugal ChillerENG/5/001-23/01326-12-2023Muhammad Ali ShaikhOfficer Engineering29-04-2024Niaz Ali Jatoi Engineering
Machine / Equipment Logbook - Domino Inkjet Printer - Ceph AreaPCG/5/030-23/00226-12-2023Usama YousufSenior Officer Production   Production Ceph
Machine / Equipment Logbook - Vial Washing Sterile - Ceph AreaPCG/5/030-23/00126-12-2023Usama YousufSenior Officer Production   Production Ceph
Machine / Equipment Logbook - Ampoule Washing Machine - Ceph AreaPCG/5/030-23/00126-12-2023Usama YousufSenior Officer Production   Production Ceph
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-23/2821-12-2023Affan Bin SafdarSenior Officer QC11-01-2024Niaz Ali Jatoi Quality Control
General Equipment Usage Logbook - TOC AnalyzerQCI/5/030-23/00421-12-2023Sufiyan RazaSenior Officer QC05-08-2024Niaz Ali JatoiS/143Quality Control
Cleaning and Verification of Weighing Balance - BBA231-WB-NUT-WIP-01 - WIPPNG/5/002-23/00226-12-2023Syed Baqar AliAssistant Manager Production Nutra   Production Nutraceutical
Daily Log sheet of Water Management SystemENG/5/004-23/00928-12-2023Azeemul ZafarOperator08-04-2024Niaz Ali Jatoi Engineering
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Rimsha YousufQCP/5/021-23/01129-12-2023Rimsha YousufSenior Officer QC29-02-2024Niaz Ali Jatoi Quality Control
Over printing for 2D Barcode Machine Logbook - Print XI Jet - MP-01-31-03PMG/5/031-23/00229-12-2023Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/128Production Non-Ceph
Over printing Machine Logbook - Marko Print XI Jet - MP-PAK-02-03-05PMG/5/043-23/00329-12-2023Abdul BasitDeputy Manager Production13-12-2024Niaz Ali JatoiS/129Production Non-Ceph
Cleaning and Housekeeping of Ceph PlantPCG/5/001-24/00201-01-2024Usama YousufSenior Officer Production29-04-2024Niaz Ali JatoiQA IPC person retrieved.Production Ceph
Machine / Equipment Logbook - Fette P3030 - Metal DetectorPRG/5/102-24/00401-01-2024Shahid Ahmed JhakSenior Executive Production31-05-2024Niaz Ali JatoiS/130Production Non-Ceph
Machine / Equipment Logbook - Fette P3030 - DedusterPRG/5/102-24/00401-01-2024Shahid Ahmed JhakSenior Executive Production30-05-2024Niaz Ali JatoiS/131Production Non-Ceph
PM Testing Logbook for Lid and base foil - Zain-ul Hadi - Non CephQCP/5/018-24/00905-01-2024Zain-Ul-HadiOfficer QC17-02-2024Niaz Ali JatoiPrevious Logbook QCP/5/018-23/008 retrievedQuality Control
Usage Logbook for Analytical balance No-05 QC packagingQCI/5/030-24/00805-01-2024Imran GhouriExecutive QC  Previous logbook QCI/5/030-23/007 RetrievedQuality Control
General Equipment Usage Logbook - Dissolution Apparatus - QC CephQCI/5/030-24/00208-01-2024Aqib AhmedSenior Officer QC   Quality Control
Equipment / Machine Logbook - Blister Machine BM 350 - E - NCPRG/5/102-24/00708-01-2024Abdul GhaniSenior14-05-2024Niaz Ali JatoiS/132Production Non-Ceph
General Equipment Usage Logbook - Particle Counter - QC Ceph WetQCI/5/030-24/00208-01-2024Aqib AhmedSenior Officer QC   Quality Control
Internal pH Meter Verification Log Sheet - QC Ceph - WetQCI/5/030-24/00108-01-2024Aqib AhmedSenior Officer QC   Quality Control
Preparation and Standardization of Volumetric Solution - QC CephQCG/5/050-24/00108-01-2024AQSenior Officer QC   Quality Control
Temperature and Humidity Monitoring Logbook - QC Ceph - Cehmical LabQCG/5/254-24/00108-01-2024Aqib AhmedSenior Officer QC   Quality Control
Internal Conductivity Verification Log Sheet - QC CephQCI/5/087-24/00108-01-2024Aqib AhmedSenior Officer QC   Quality Control
General Usage Logbook for HPLC - HPLC No.16 (Thermo Fisher)QCI/5/060-24/00101-01-2024Daniyal KhalidSenior Executive QC   Quality Control
General Usage Logbook for Dissolution # 06QCI/5/030-24/00318-12-2023Daniyal KhalidSenior Executive QC21-06-2024Niaz Ali JatoiS/130Quality Control
Temperature Monitoring logsheet of Oven Binder - Micro Ceph Lab - OV-CP-MQC-01QCG/5/002-24/00109-01-2024Muzaffar AliSenior Executive QC05-08-2024Niaz Ali JatoiS/155Quality Control
Preparation of IPA 70% for QC Micro Lab - CephQCM/5/003-24/00109-01-2024Muzaffar AliSenior Executive QC23-08-2024Niaz Ali JatoiS/156Quality Control
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Imran GhouriQCP/5/021-23/00813-09-2023Imran GhouriExecutive QC09-01-2024Niaz Ali JatoiS/97Quality Control
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Imran GhouriQCP/5/021-24/00909-01-2024Imran GhouriExecutive QC05-03-2024Niaz Ali Jatoi Quality Control
Temperature Monitoring logsheet of Incubator - Micro Ceph Lab - IB-CP-MQC-04QCG/5/002-24/00109-01-2024Muzaffar AliSenior Executive QC   Quality Control
General Equipment Usage Logbook - pH Meter - QC Micro Ceph - PH-CP-MQC-01QCI/5/030-24/00109-01-2024Muzaffar AliSenior Executive QC   Quality Control
General Usage Logbook for HPLC - HPLC No.01 Installed in QC CephQCI/5/060-24/00210-01-2024Aqib AhmedsE   Quality Control
General Usage Logbook for HPLC - HPLC No.10 Installed in QC CephQCI/5/060-24/00410-01-2024Aqib AhmedSenior Officer QC   Quality Control
General Equipment Usage Logbook - UV-1700 - QC CephQCI/5/030-24/00210-01-2024Aqib AhmedSenior Officer QC   Quality Control
Over printing Machine Logbook for 2D Barcode Non- Ceph (PK-01-31-06)PMG/5/031-24/00210-01-2024Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/133Production Non-Ceph
Conveyor Belt Logbook - Belt No.02PMG/5/040-24/00510-01-2024Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/134Production Non-Ceph
Daily Operation Report of BoilerENG/5/006-24/01511-01-2024Muhammad Ali ShaikhOfficer Engineering12-03-2024Nasrullah MajeedIssued by : NAJEngineering
Purified Water Testing Report - Affan Bin SafdarQCG/5/036-24/02911-01-2024Affan Bin SafdarSenior Officer QC24-01-2024Niaz Ali JatoiIssued by : NAJQuality Control
Finished Testing Logbook - Asif Ali JafriQCG/5/015-24/00611-01-2024Asif Ali JafriSenior Executive QC11-01-2024Niaz Ali Jatoi Quality Control
Finished Product Testing logbook - Asif Ali JafriQCG/5/015-24/00711-01-2024Asif Ali JafriSenior Executive QC20-06-2024Niaz Ali JatoiS/165Quality Control
Machine / Equipment Logbook - BG 400 Coating Manufacturing VesselPRG/5/102-24/00302-02-2024Sultan SikandarOfficer Production08-03-2024Niaz Ali JatoiS/142Production Non-Ceph
Machine / Equipment Logbook - BG 150 Coating Manufacturing VesselPRG/5/102-24/00311-01-2024Muhammad AyubSenior Executive Production16-05-2024Niaz Ali JatoiS/136Production Non-Ceph
Finished Product Testing logbook - Ahsan KhanQCG/5/015-23/00131-05-2023Ahsan KhanOfficer QC12-01-2024Niaz Ali JatoiDouble entry.Quality Control
Finished Product Testing logbook - Ahsan KhanQCG/5/015-24/00212-01-2024Ahsan KhanOfficer QC16-05-2024Niaz Ali JatoiS/168Quality Control
Microbial Count Report - Non- CephQCM/5/019-24/00511-01-2024Nida ZehraOfficer QC08-07-2024Niaz Ali JatoiS/167Quality Control
Usage Logbook of IPC Equipment - Hardness / Thickness Tester - NCQAN/5/001-24/00612-01-2024Mudassar NazeerAssistant Manager QA - IPC25-09-2024Niaz Ali JatoiS/23Quality Assurance
Finished Product Testing logbook - Saman BarlasQCG/5/015-24/00812-01-2024Saman BarlasSenior Officer QC20-03-2024Niaz Ali Jatoi Quality Control
PM Testing Logbook for Adhesive Tape and DI - Imran GhouriQCP/5/019-24/00812-01-2024Imran GhouriExecutive QC13-05-2024Niaz Ali JatoiS/170Quality Control
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-24/00716-01-2024Mehran KhanSenior Executive QC20-03-2024Niaz Ali Jatoi Quality Control
Environmental Monitoring Report by Settle Plate of Ceph Sterile AreaQCM/5/024-24/00617-01-2024Khalid AliExecutive QC27-06-2024QA IPC CephS/172Quality Control
Machine / Equipment Logbook - Manual Coating Pan - Manufacturing VesselPRG/5/102-24/00319-01-2024shahid Ali JhakSenior Executive Production03-07-2024Niaz Ali JatoiS/136Production Non-Ceph
WIP Product IN / OUT log - Non-CephPRW/5/001-24/01219-01-2024shahid Ali JhakSenior Executive Production22-10-2024Niaz Ali JatoiS/138Production Non-Ceph
Disinfectant Preparation Logsheet - Raw Material Store - Non-CephWHG/5/053-23/00217-01-2023Razia BegumSenior Executive Warehouse23-01-2024Niaz Ali Jatoi Warehouse
Disinfectant Preparation Logsheet - Raw Material Store - Non-CephWHG/5/053-24/00323-01-2024Razia BegumSenior Executive Warehouse30-04-2024Niaz Ali JatoiS/05Warehouse
General Equipment Usage Logbook - Dissolution Apparatus No.03QCI/5/030-24/00323-01-2024Daniyal KhalidSenior Executive QC12-07-2024Niaz Ali JatoiS/173Quality Control
Machine / Equipment Logbook - Automatic Bottle Blowing Machine - CephPCG/5/030-24/00124-01-2024Usama YousufSenior Officer Production01-01-1900  Production Ceph
PM Testing Logbook of Lid and Base Foil - Imran GhouriQCP/5/018-23/00713-10-2023Imran GhouriExecutive QC25-01-2024Niaz Ali JatoiRetrievedQuality Control
PM Testing Logbook of Lid and Base Foil - Imran GhouriQCP/5/018-24/00825-01-2024Imran GhouriExecutive QC07-05-2024Niaz Ali JatoiS/176Quality Control
Machine / Equipment Logbook - Automatic Bottle Blowing Machine - NutraPNG/5/001-24/00125-01-2024Syed Baqar AliAssistant Manager Production Nutra   Production Nutraceutical
Daily Climatic Chamber Monitoring Log - # 01 Serial # 13-05082QCI/5/104-23/00218-12-2023Daniyal KhalidSenior Executive QC01-01-1900  Quality Control
Daily Climatic Chamber Monitoring Log - # 02 Serial # 13-05075QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 03 Serial # X509-0002QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC01-01-1900 S/132Quality Control
Daily Climatic Chamber Monitoring Log - # 04 Serial # W810-0057QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC04-12-2024Niaz Ali JatoiS134Quality Control
Daily Climatic Chamber Monitoring Log - # 05 Serial # W810-0056QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 07 Serial # 20170000000053QCI/5/104-24/00210-01-2024Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 08 Serial # 20170000000463QCI/5/104-23/00229-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 09 Serial # 20170000000465QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 10 Serial # 20170000000457QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 11 Serial # 20170000000459QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC26-12-2024Niaz Ali JatoiS/138Quality Control
Daily Climatic Chamber Monitoring Log - # 12 Serial # 20170000000456QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 15 Serial # 20180000014708QCI/5/104-23/00218-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Daily Climatic Chamber Monitoring Log - # 16 Serial # 20180000016920QCI/5/104-23/00219-12-2023Daniyal KhalidSenior Executive QC   Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00124-01-2024Bilal Ali KhanOfficer QC12-02-2024Niaz Ali Jatoi Quality Control
General Equipment Logbook - Analytical Balance No.03QCI/5/030-23/00411-09-2023Daniyal KhalidSenior Executive QC29-01-2024Niaz Ali Jatoi Quality Control
General Equipment Logbook - Analytical Balance No.03QCI/5/030-24/00526-01-2024Daniyal KhalidSenior Executive QC17-05-2024Niaz Ali JatoiS/177Quality Control
Conveyor Belt Logbook - Belt No.03 - Non-CephPMG/5/040-24/00426-01-2024Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/139Production Non-Ceph
PM Testing Logbook for Unit Carton and Master Carton - Zain ul HadiQCP/5/021-24/01030-01-2024Zain ul HadiOfficer QC20-03-2024Nasarullah Majeed Quality Control
Environmental Monitoring Report by Settle Plate of Microbiology Lab Laminar Air Flow - NCQCM/5/042-23/00226-09-2023Mehran KhanSenior Executive QC30-01-2024Niaz Ali JatoiS/87Quality Control
Environmental Monitoring Report by Settle Plate of Microbiology Lab Laminar Air Flow - NCQCM/5/042-23/00330-01-2024Mehran KhanSenior Executive QC04-06-2024Niaz Ali JatoiS/179Quality Control
Machine / Equipment Logbook - Double Cone Blender - NCPRG/5/102-24/00431-01-2024Sultan SikandarOfficer Production26-07-2024Niaz Ali JatoiS/140Production Non-Ceph
Lockers Inspection Checklist of Cephalosporin Change RoomPCG/5/026-24/00326-01-2024Usama YousufSenior Officer Production   Production Ceph
PM Testing Logbook for Adhesive Tape and DI - Zain ul HadiQCP/5/019-23/00620-10-2023Zain ul HadiOfficer QC01-02-2024Niaz Ali Jatoi Quality Control
PM Testing Logbook for Adhesive Tape and DI - Zain ul HadiQCP/5/019-24/00701-02-2024Zain ul HadiOfficer QC07-05-2024Niaz Ali JatoiS/180Quality Control
General Equipment Logbook - Karl Fischer No.01 (Model V20)QCI/5/030-24/00101-02-2024Ateequr RehmanAssistant Manager QC   Quality Control
Log Book for Batch Document IssuanceQAG/5/115-24/00601-02-2024Syed Asif HussainOffice Assistant   Quality Assurance
Machine / Equipment Logbook - Coating Machine - BG-400E - NCPRG/5/102-24/00311-01-2024Shahid Ali JhakSenior Executive Production22-05-2024Niaz Ali JatoiS/135Production Non-Ceph
Machine / Equipment Logbook - BGK-350 Coating Vessel - NCPRG/5/102-24/00301-02-2024Shahid Ali JhakSenior Executive Production05-03-2024Niaz Ali Jatoi Production Non-Ceph
Machine / Equipment Logbook - ZPW26-A Compression Machine - NCPRG/5/102-24/00302-02-2024shahid Ali JhakSenior Executive Production01-04-2024Niaz Ali Jatoi Production Non-Ceph
Conveyor Belt Logbook - Belt No. 04 - NCPMG/5/040-24/00407-02-2024Abdul BasitDeputy Manager Production   Production Non-Ceph
Machine / Equipment Logbook - Double Cone Blender - CephPCG/5/030-24/00102-01-2024Usama YousufSenior Officer Production   Production Ceph
Cleaning of Vacuum CleanerWGH/5/065-24/00112-02-2024Razia BegumSenior Executive Warehouse   Warehouse
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00212-02-2024Bilal Ali KhanOfficer QC26-02-2024Niaz Ali Jatoi Quality Control
Daily Record of Purified WaterENG/5/013-24/00212-02-2024Hasnain ShabbirExecutive Engineering   Engineering
Daily Operational Log Sheet of Carrier Screw ChillerENH/5/001-24/00112-02-2024Hasnain ShabbirExecutive Engineering26-07-2024Niaz Ali JatoiS/30Engineering
Packaging Material Incoming Logbook for PharmevoQCP/5/005-24/00513-02-2024Farhat Subhan KhattakSenior Executive QC19-09-2024Niaz Ali JatoiS/184Quality Control
Microbiological Media Preparation Logbook - Non-CephQCM/5/016-24/00312-02-2024Mehran KhanSenior Executive QC26-07-2024Niaz Ali JatoiS/183Quality Control
Daily Usage / Cleaning Logbook of IPC Equipment - Leakage Tester - NutraQAN/5/001-24/00414-02-2024Abdul Wahab ShahSenior Executive QA   Quality Assurance
Batch History Audit Logbook - Non-CephQAG/5/018-24/00814-02-2024Abdul Wahab ShahSenior Executive QA  Note: Logbook Nos. 003, 004, 005, 006 and 007 are yet to be retrievedQuality Assurance
Batch Document Observation - Non-CephQAG/5/054-24/00214-02-2024Abdul Wahab ShahSenior Executive QA   Quality Assurance
Machine / Equipment Logbook - Blister Machine - BM 350-A - NCPRG/5/102-23/00615-09-2023Abdul GhaniSenior Executive Production01-12-2023Niaz Ali Jatoi Production Non-Ceph
Machine / Equipment Logbook - Blister Machine - BM 350-A - NCPRG/5/102-23/00701-12-2023Abdul GhaniSenior Executive Production12-02-2024Niaz Ali Jatoi Production Non-Ceph
Machine / Equipment Logbook - Blister Machine - BM 350-A - NCPRG/5/102-24/00812-02-2024Abdul GhaniSenior Executive Production06-05-2024Niaz Ali JatoiS/145Production Non-Ceph
Logsheet for AutoclaveQCI/5/025-24/00214-02-2024Mehran KhanSenior Executive QC   Quality Control
Machine / Equipment Logbook - ZPW26-A METAL DETECTOR - NCPRG/5/102-24/00314-02-2024shahid Ali JhakSenior Executive Production01-11-2024Niaz Ali JatoiS/146Production Non-Ceph
Machine / Equipment Logbook - ZPW26-A DEDUSTER - NCPRG/5/102-24/00314-02-2024shahid Ali JhakSenior Executive Production01-11-2024Niaz Ali JatoiS/147Production Non-Ceph
Machine / Equipment Logbook - Granulator-02- NCPRG/5/102-24/00414-02-2024shahid Ali JhakSenior Executive Production24-09-2024Niaz Ali JatoiS/148Production Non-Ceph
Finished Product Testing logbook - Saqib QadirQCG/5/015-24/00115-02-2024Saqib QadirSenior Officer QC27-05-2024Niaz Ali JatoiS/186Quality Control
General Analytical Equipment Usage Logbook - Dissolution Apparatus -08PDG/5/104-23/00105-07-2023Nadeem MuradAssistant Manager PD16-02-2024Niaz Ali Jatoi Product Development
General Analytical Equipment Usage Logbook - Dissolution Apparatus -08PDG/5/104-24/00216-02-2024Nadeem MuradAssistant Manager PD05-09-2024Niaz Ali JatoiS/15 : Note: its number is PDG/5/104-24/001 not 002. It was mistakenly written.Product Development
PM Testing Logbook of Lid and Base Foil - Zain ul HadiQCP/5/018-24/01016-02-2024Zain ul HadiOfficer QC22-04-2024Niaz Ali Jatoi Quality Control
Daily Housekeeping Checklist Log for Change Rooms - Visitor/FemaleADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Housekeeping Checklist Log for Change Rooms - FG WarehouseADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Housekeeping Checklist Log for Change Rooms - Non-Ceph AreaADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Housekeeping Checklist Log for Change Rooms - Ceph AreaADG21-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Housekeeping Checklist Log for Change Rooms - Raw Material WarehouseADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Housekeeping Checklist Log for Change Rooms - Nutraceutical Mfg AreaADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Housekeeping Checklist Log for Change Rooms - Nutraceutical PackingADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Housekeeping Checklist Log for Change Rooms - Non-Ceph Packing AreaADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Daily Checklist Log for Housekeeping of Canteen / KitchenADG/5/010-24/00321-02-2024Ehtisham WaheedExecutive Admin   Administration
Machine / Equipment Logbook - ZPW26-B Metal Detector - NCPRG/5/102-24/00321-02-2024Shahid Ali JhakSenior Executive Production25-11-2024Niaz Ali JatoiS/149Production Non-Ceph
Machine / Equipment Logbook - ZPW26-B Deduster - NCPRG/5/102-24/00321-02-2024Shahid Ali JhakSenior Executive Production25-11-2024Niaz Ali JatoiS/150Production Non-Ceph
Machine / Equipment Logbook - ZPW26-B Compression Machine - NCPRG/5/102-24/00321-02-2024Shahid Ali JhakSenior Executive Production25-11-2024Niaz Ali JatoiS/151Production Non-Ceph
Logbook for Batch Document PreparationQAD/5/008-24/00322-02-2024Syed Asif HussainOffice29-04-2024Niaz Ali JatoiS/29Quality Assurance
Sampling of Finished Product Logbook - Non-CephQAG/5/260-24/00122-02-2024Abdul Wahab ShahSenior Executive QA11-05-2024Niaz Ali Jatoi Quality Assurance
PM Testing Logbook of Lid and Base Foil - Rimsha YousufQCP/5/018-24/00523-02-2024Rimsha YousufSenior Officer QC24-06-2024Nasrullah MajeedLogbook retrieved - S. No. 188Quality Control
General Usage Logbook - Semi Micro Balance # 06QCI/5/030-24/00423-02-2024Daniyal KhalidSenior Executive QC01-07-2024Niaz Ali JatoiS/189Quality Control
Sterile Area Cleaning LogbookPCA/5/003-24/00226-02-2024Usama YousufSenior Officer Production   Production Ceph
Finished Product Testing logbook - Bilal Ali KhanQCG/5/015-24/00226-02-2024Bilal Ali KhanOfficer QC04-06-2024Niaz Ali JatoiS/190Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00326-02-2024Bilal Ali KhanOfficer QC11-03-2024Niaz Ali Jatoi Quality Control
Machine / Equipment Logbook - Fluid Bed Dryer (120Kg) - NCPRG/5/102-24/00726-02-2024Sikandar SultanOfficer Production15-07-2024Niaz Ali JatoiS/153Production Non-Ceph
WIP Product IN / OUT log - Non-CephPRW/5/001-24/01326-02-2024shahid Ali JhakSenior Executive Production22-10-2024Niaz Ali JatoiS/154Production Non-Ceph
Finished Good Testing Logbook - Ubaid ur RehmanQCG/5/015-24/00126-02-2024Ubaid ur RehmanAssistant Manager QC   Quality Control
Finished Product Testing logbook - Mariyam MuazzamQCG/5/015-24/00127-02-2024Mariyam MuazzamSenior Officer QC15-05-2024Niaz Ali JatoiS/193Quality Control
Cleaning and Verification of Weighing Balance - WB-NUT-PH-01 - NutraPNG/5/002-24/00227-02-2024Syed Baqar AliAssistant Manager Production Nutra   Production Nutraceutical
Cleaning and Verification of Weighing Balance - WB-NUT-PH-03PNG/5/002-24/00227-02-2024Syed Baqar AliAssistant Manager Production Nutra   Production Nutraceutical
Initial Sample RecieivingPDG/5/085-24/00227-02-2024Osama TahirExecutive PD   Product Development
General Analytical Equipment Usage Logbook - Dissolution No.09PDG/5/104-23/00105-07-2023Nadeem MuradAssistant Manager PD28-02-2024Niaz Ali Jatoi Product Development
General Analytical Equipment Usage Logbook - Dissolution No.09PDG/5/104-24/00228-02-2024Nadeem MuradAssistant Manager PD   Product Development
Machine Equipment Logbook - GHL - NCPRG/5/102-24/00628-02-2024Sultan SikandarOfficer Production19-07-2024Niaz Ali JatoiS/155Production Non-Ceph
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Rimsha YousufQCP/5/021-24/01229-02-2024Rimsha YousufSenior Officer QC30-05-2024Niaz Ali JatoiS/194Quality Control
General Equipment Usage Logbook - pH Meter - Ino Lab - NC (WF-700 12490088)QCI/5/030-24/00229-02-2024Daniyal KhalidSenior Executive QC02-10-2024Niaz Ali JatoiS/195Quality Control
Logsheet for Entry and Exist in Sterile Area - Filling - CephPCG/5/006-24/00529-02-2024Usama YousufSenior Officer Production20-09-2024Niaz Ali JatoiS/47 - QA IPCProduction Ceph
Machine / Equipment Logbook - Gral Mixer - NCPRG/5/102-24/00701-03-2024Sultan SikandarOfficer Production29-07-2024Niaz Ali JatoiS/156Production Non-Ceph
Machine / Equipment Logbook - Blister Machine - BM 350-D - NCPRG/5/102-24/00623-02-2024Abdul GhaniSenior Executive Production12-07-2024Niaz Ali JatoiS/152Production Non-Ceph
Daily Usage / Cleaning Logbook of IPC Equipment - Disintegration Tester - CephQAN/5/001-24/00204-03-2024Sajjad Hussain QureshiSenior Executive QA   Quality Assurance
Retention Sample Logbook - Ceph Retention RoomQAG/5/032-24/00119-02-2024Sajjad Hussain QureshiSenior Executive QA   Quality Assurance
Retention Sample Logbook - Non-Ceph & Nutra Retention RoomQAG/5/032-24/00130-01-2024Hamza AhmedExecutive QA   Quality Assurance
Machine / Equipment Logbook - BGK-350 Coating Vessel - NCPRG/5/102-24/00405-03-2024shahid Ali JhakSenior Executive Production25-09-2024Niaz Ali JatoiS/157Production Non-Ceph
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Imran GhouriQCP/5/021-24/01005-03-2024Imran GhouriExecutive QC04-06-2024Niaz Ali JatoiS/194Quality Control
Machine Equipment Logbook - DC Blender - 30kg - NCPRG/5/102-24/00405-03-2024Sultan SikandarOfficer Production   Production Non-Ceph
Daily Effluent Treatment Plant Log BookEIGH/5/011-24/00206-03-2024Adil Latif KhanEHS Supervisor   EHS
General Usage Logbook - Dissolution Apparatus No.05QCI/5/030-24/00406-03-2024Daniyal KhalidSenior Executive QC05-08-2024Niaz Ali JatoiS/197Quality Control
Cleaning and Verification Log of Weighing Balance - WB-CP-WH-05 - Dispensing - IND-231 (100Kg) - CEPHWHG/5/004-24/00207-03-2024Muhammad ArsalanWarehouse Supervisor   Warehouse
Cleaning and Verification Log of Weighing Balance - IND-231 - WB-CP-WH-07 - Receiving Bay Ceph - 50kgWHG/5/004-24/00207-03-2024Muhammad ArsalanWarehouse Supervisor   Warehouse
Cleaning and Verification Log of Weighing Balance - IND-231 - WB-CP-WH-06 - Dispensing Ceph - 15kgWHG/5/004-24/00207-03-2024Muhammad ArsalanWarehouse Supervisor   Warehouse
Cleaning of Vacuum Cleaner - Ceph WarehouseWHG/5/065-24/00107-03-2024Muhammad ArsalanWarehouse Supervisor   Warehouse
PM Testing Logbook for Adhesive Tape, Label, and Direction Insert - Rimsha YousufQCP/5/019-24/00807-03-2024Rimsha YousufSenior Officer QC   Quality Control
General Usage Logbook of for Dissolution Apparatus No.04QCI/5/030-24/00507-03-2024Daniyal KhalidSenior Executive QC21-10-2024Niaz Ali JatoiS/199Quality Control
Machine / Equipment Logbook - Coating Machine - BG-400E - NCPRG/5/102-24/00422-05-2024Shahid Ali JhakSenior Executive Production09-07-2024Niaz Ali JatoiS/188Production Non-Ceph
Machine Equipment Logbook - Manual Coating Pan 24 - NCPRG/5/102-24/00408-03-2024shahid Ali JhakSenior Executive Production12-07-2024Niaz Ali JatoiS/159Production Non-Ceph
Daily Operation Report of BoilerENG/5/006-24/01612-03-2024Muhammad Ali ShaikhOfficer Engineering13-05-2024Niaz Ali JatoiIssued by: Nasrullah.Engineering
Finish Product Incoming Logbook of QC Non-CephQCG/5/083-24/00907-03-2024Syed Asif AliSenior Executive QC11-07-2024Niaz Ali JatoiS/200Quality Control
Usage Logbook for Analytical balance No-05 QC packagingQCI/5/030-24/00913-03-2024Imran GhouriExecutive QC28-05-2024Niaz Ali JatoiS/201Quality Control
Finished Good Testing Logbook - Aqib Ahmed - QC Ceph.QCG/5/015-24/00514-03-2024Aqib AhmedSr.Officer QC27-08-2024Niaz Ali JatoiIssued by: Nasrullah - S/202Quality Control
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-24/00814-03-2024Mehran MangiSr.Executive QC23-04-2024Niaz Ali JatoiIssued by: Nasrullah Previous logbook Not Received 19/03/2024Quality Control
Machine Equipment Logbook - ZP37 B-I Compression Machine - NCPRG/5/102-24/00515-03-2024Shahid Ali JhakSenior Executive Production08-08-2024Niaz Ali JatoiIssued by: Nasrullah Majeed / S/161Production Non-Ceph
Conductivity Meter Verification Logbook - NCQAG/5/249-24/00315-03-2024Abdul Wahab ShahSr.Exceutive QA13-05-2024Niaz Ali JatoiIssued by: Nasrullah.Quality Assurance
Finished Product Testing logbook - Saman BarlasQCG/5/015-24/00919-03-2024Saman BarlasSenior Officer QC26-07-2024Niaz Ali JatoiS/205Quality Control
Finished Product Testing logbook - Saman BarlasQCG/5/015-24/00919-03-2024Saman BarlasSenior Officer QC   Quality Control
PM Testing Logbook for Unit Carton and Master Carton - Zain ul HadiQCP/5/021-24/01120-03-2024Zain ul HadiOfficer QC21-08-2024Niaz Ali JatoiS/206Quality Control
Sterility Test ReportQCM/5/044-24/00320-03-2024Muzaffar AliSenior Executive QC23-08-2024Niaz Ali JatoiIssued by: NasrullahQuality Control
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-02 - 75KWENG/5/017-23/00915-03-2024Muhammad Ali ShaikhOfficer Engineering02-09-2024Niaz Ali JatoiIssued by : NASRULLAH / S/33Engineering
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-01 - 55KWENG/5/017-24/00315-03-2024Muhammad Ali ShaikhOfficer Engineering  Issued by : NASRULLAHEngineering
Daily Cleaning Logbook of IPC Equipment - Leakage Tester - NCQAN/5/001-24/01022-03-2024Abdul Wahab ShahSenior Executive QC01-01-1900 Issued by : NASRULLAHQuality Assurance
Machine / Equipment Logbook - V-Blender - NCPRG/5/102-24/00425-03-2024Sultan SikandarOfficer Production25-11-2024Niaz Ali JatoiS/162Production Non-Ceph
Logsheet for Distilled Water PlantPCG/5/014-24/01026-03-2024Adnan Ali KhanOperator26-06-2024QA IPC CephIssued by : NASRULLAH - S/48Production Ceph
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00126-03-2024Abdul SabourOfficer QC31-05-2024Niaz Ali JatoiIssued by : NASRULLAHQuality Control
Conveyor Belt Logbook - Belt No. 07 - NCPMG/5/040-24/00526-03-2024Abdul BasitDeputy Manager Production01-01-1900 Issued by : NASRULLAHProduction Non-Ceph
General Usage Logbook of HPLC- HPLC - 08PDG/5/105-24/00129-03-2024Nadeem MuradAssistant Manager PD   Product Development
General Analytical Equipment Usage Logbook - Dissolution Apparatus -01PDG/5/104-24/00129-03-2024Nadeem MuradAssistant Manager PD   Product Development
General Analytical Equipment Usage Logbook - Ultra Sonic Water BathPDG/5/105-24/00129-03-2024Nadeem MuradAssistant Manager PD   Product Development
General Analytical Equipment Usage Logbook - UV SpectrophotometerPDG/5/105-24/00129-03-2024Nadeem MuradAssistant Manager PD   Product Development
General Analytical Equipment Usage Logbook - Water BathPDG/5/104-24/00129-03-2024Nadeem MuradAssistant Manager PD   Product Development
General Analytical Equipment Usage Logbook - Dissolution Apparatus -02PDG/5/104-24/00129-03-2024Nadeem MuradAssistant Manager PD   Product Development
Work In-Process IN/OUT Record - WIP-01 (Suspension) - CephPCG/5/020-24/00229-03-2024Usama YousufSenior Officer Production17-04-2024Niaz Ali JatoiQA-IPC Ceph retrieved.Production Ceph
Cleaning and Verification of Weighing Balance - Panther BM-300 - Sterile Area - CephPCG/5/024-24/00201-04-2024Usama YousufSenior Officer Production24-12-2024Niaz Ali JatoiS/50Production Ceph
Daily Temperature and Rh Logsheet - Encapsulation Area - CephPCG/5/007-24/00201-04-2024Usama YousufSenior Officer Production24-09-2024Niaz Ali JatoiS/51Production Ceph
Daily Temperature and Rh Logsheet - OPTICAL AREA - CephPCG/5/007-24/00201-04-2024Usama YousufSenior Officer Production24-09-2024Niaz Ali JatoiS/52Production Ceph
Machine / Equipment Logbook - ZPW26-A - Compression Machine - NCPRG/5/102-24/00401-04-2024shahid Ali JhakSenior Executive Production10-12-2024Niaz Ali JatoiS/164Production Non-Ceph
Machine / Equipment Logbook - ZPW23 - Compression Machine - NCPRG/5/102-24/00501-04-2024shahid Ali JhakSenior Executive Production24-09-2024Niaz Ali JatoiS/165Production Non-Ceph
Utensils Cleaning Checklist Log - Dispensing Ceph AreaWHG/5/021-24/00103-04-2024Razia BegumSenior Executive Warehouse   Warehouse
General Equipment Usage Logbook - UV Spectrophotometer - CephQCI/5/030-24/00103-04-2024Narain MalhiDeputy Manager QC   Quality Control
Equipment / Machine Log book - Blister 350-B Non-CephPRG/5/102-24/00805-04-2024Abdul GhaniSenior Executive Production15-08-2024Niaz Ali JatoiS/166Production Non-Ceph
General Equipment Usage Logbook - Oven - Ceph LabQCI/5/030-24/00205-04-2024Aqib AhmedSenior Officer   Quality Control
General Equipment Logbook for PD - HPLC - 06PDG/5/105-24/00105-04-2024Nadeem MuradAssistant Manager PD   Product Development
General Equipment Logbook for PD - HPLC - 07PDG/5/105-24/00105-04-2024Nadeem MuradAssistant Manager PD   Product Development
Logbook for Batch Document Issuance for NutraceuticalQAG/5/115-24/00205-04-2024SyedOffice Assistant   Quality Assurance
Log Sheet For Operation of Ultra filtration plantENO/5/083-24/01005-04-2024Azeemul ZafarOperator22-07-2024Niaz Ali JatoiS/34Engineering
Log Sheet for Operation of R.O. PlantENO/5/084-24/01005-04-2024Azeemul ZafarOperator22-07-2024Niaz Ali JatoiS/35Engineering
WIP In and Out Record Form - Non-CephPRW/5/001-24/01018-10-2023shahid Ali JhakSenior Executive Production09-04-2024Niaz Ali Jatoi Production Non-Ceph
WIP In and Out Record Form - Non-CephPRW/5/001-24/01409-04-2024shahid Ali JhakSenior Executive Production   Production Non-Ceph
General Usage Logbook for DPI InstrumentQCI/5/030-24/00209-04-2024Asif AliSenior Executive QC   Quality Control
General Usage Logbook for "Refrectometer"QCI/5/030-24/00209-04-2024Waqas ul Haque QaziSenior Executive QC   Quality Control
General Usage Logbook for ViscometerQCI/5/030-2409-04-2024Waqas ul Haque QaziSenior Executive QC   Production Non-Ceph
General Usage Logbook for Particle Size AnalyzerQCI/5/030-24/00209-04-2024Waqas ul Haque QaziSenior Executive QC26-12-2024Niaz Ali JatoiS/213Quality Control
General Usage Logbook for PotentiometerQCI/5/030-24/00109-04-2024Waqas ul Haque QaziSenior Executive QC   Quality Control
General Usage Logbook for Melting PointQCI/5/030-24/00209-04-2024Waqas ul Haque QaziSenior Executive QC   Quality Control
General Equipment Logbook for FurnaceQCI/5/030-24/00209-04-2024Waqas ul Haque QaziSenior Executive QC   Quality Control
Equipment / Machine Log book - Coating Machine BG-150PRG/5/102-24/00409-04-2024shahid Ali JhakSenior Executive Production01-08-2024Nasrullah MajeedLogbook RetreivedProduction Non-Ceph
General Equipment Logbook - Atomic AbsorptionQCI/5/030-24/00109-04-2024Asif Ali JafriSenior Executive QC   Quality Control
General Equipment Logbook - GC InstrumentQCI/5/030-24/00109-04-2024Muhammad AnwarAssistant Manager QC   Quality Control
Machine Equipment Logbook - T-700 Compression Machine - NCPRG/5/102-24/00315-04-2024shahid Ali JhakSenior Executive Production25-11-2024Niaz Ali JatoiS/169Production Non-Ceph
Microbiological Testing Report of Nutraceutical ProductsQCM/5/049-24/00416-04-2024Mehran KhanSenior Executive QC26-11-2024Niaz Ali JatoiS/221Quality Control
Daily Log sheet of Water Management SystemENG/5/004-24/01008-04-2024Muhammad Ali ShaikhOfficer Engineering22-07-2024Niaz Ali JatoiS/36Engineering
Raw Material Testing Logbook - Abdul SabourQCG/5/184-24/00109-04-2024Abdul SabourOfficer QC   Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00408-03-2024Bilal Ali KhanOfficer QC17-04-2024Niaz Ali Jatoi Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00517-04-2024Bilal Ali KhanOfficer QC06-05-2024Niaz Ali JatoiS/222Quality Control
Machine Equipment Logbook - Granulator-01 & DC Blender - NCPRG/5/102-24/00522-04-2024Sultan SikandarOfficer Production01-01-1900 S/170Production Non-Ceph
Purified Water Testing Report - Narain Malhi - Ceph AreaQCG/5/036-24/00515-04-2024Narain MalhiDeputy Manager QC12-08-2024Niaz Ali JatoiS/220Quality Control
PM Testing Logbook of Lid and Base Foil - Zain ul HadiQCP/5/018-24/01122-04-2024Zain ul HadiOfficer QC04-07-2024Niaz Ali JatoiS/223Quality Control
Daily Canteen Housekeeping Logbook - Kitchen Are Non-CephADG/5/001-24/00323-04-2024Ehtisham WaheedExecutive Admin   Administration
Retention Sample Logbook - Non - Ceph Retention RoomQAG/5/032-24/00523-04-2024Hamza AhmedExecutive QA   Quality Assurance
Daily Temperature and Rh Logsheet - Compression Area - CephPCG/5/007-24/00223-04-2024Baqar AliAssistant Manager Production24-09-2024Niaz Ali JatoiS/53Production Ceph
Daily Temperature and Rh Logsheet - Coating - CephPCG/5/007-24/00223-04-2024Baqar AliAssistant Manager Production24-09-2024Niaz Ali JatoiS/54Production Ceph
Daily Temperature and Rh Logsheet - Granulation Area - CephPCG/5/007-24/00223-04-2024Baqar AliAssistant Manager Production24-09-2024Niaz Ali JatoiS/55Production Ceph
Machine Equipment Logbook - BGK 350 Coating Machine - NCPRG/5/102-24/00423-04-2024Shahid Ali JhakSenior Executive Production10-09-2024Niaz Ali JatoiS/171Production Non-Ceph
Daily Temperature and Rh Logsheet - Blister Area - CephPCG/5/007-24/00223-04-2024Baqar AliAssistant Manager Production24-09-2024Niaz Ali JatoiS/56Production Ceph
Daily Temperature and Rh Logsheet - Packing Area - CephPCG/5/007-24/00223-04-2024Baqar AliAssistant Manager Production24-09-2024Niaz Ali JatoiS/57Production Ceph
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-24/00923-04-2024Mehran KhanSenior Executive QC   Quality Control
Internal pH Meter Verification Log Sheet - QC Micro - NCQCI/5/051-24/00123-04-2024Mehran KhanSenior Executive QC   Quality Control
Machine Equipment Logbook - Fette P3030 Compression Machine - NCPRG/5/102-24/00523-04-2024Shahid Ali JhakSenior Executive Production03-10-2024Niaz Ali JatoiS/172Production Non-Ceph
Equipment / Machine Log book - Blister 350-C Non-CephPRG/5/102-24/00724-04-2024Abdul GhaniSenior Executive Production18-09-2024Niaz Ali JatoiS/173Production Non-Ceph
Daily Temperature and Rh Logsheet - WIP-01 - CephPCG/5/007-24/00224-04-2024Baqar AliAssistant Manager Production24-09-2024Niaz Ali JatoiS/58Production Ceph
Daily Temperature and Rh Logsheet - WIP-02 - CephPCG/5/007-24/00224-04-2024Baqar AliAssistant Manager Production24-09-2024Niaz Ali JatoiS/59Production Ceph
Log Sheet For Sanitization Of TanksENO/5/001-24/00125-04-2024Muhammad Ali ShaikhOfficer Engineering01-01-1900 Issued by : NASRULLAHEngineering
General Usage Logbook - Balance No. 04QCI/5/030-24/01025-04-2024Syed Asif AliSenior Executive QC27-06-2024Niaz Ali JatoiS/226Quality Control
Finished Product Testing Log Book for Tablet-Muhammad GhufranQCG/5/015-24/00125-04-2024GhufranExecutive QC   Quality Control
Machine / Equipment Logbook Fluid Bed Dryer (60kg)PRG/5/102-24/00526-04-2024Shahid Ali JhakSenior Executive Production26-09-2024Nasarullah Majeed Production Non-Ceph
Filter Changing Record for WFI Filtration - CEPH areaPCG/5/016-24/00126-04-2024Usama YousufSenior Officer Production   Production Ceph
Daily Cleaning and Housekeeping Logbook - Ceph PlantPCG/5/001-24/00329-04-2024Usama YousufSenior Officer Production   Production Ceph
IN / OUT Equipment Logbook of Ceph. BuildingPCG/5/027-24/00126-04-2024Usama YousufSenior Officer Production   Production Ceph
Filter Changing Record - Ceph AreaPCG/5/017-24/00126-04-2024Usama YousufSenior Officer Production   Production Ceph
Lockers Inspection Checklist of Cephalosporin Change RoomPCG/5/026-24/00426-04-2024Usama YousufSenior Officer Production   Production Ceph
Logbook for Temperature Monitoring of Retention Room - Non-CephQAG/5/251-24/00225-04-2024Hamza AhmedExecutive QA   Quality Assurance
Daily Log sheet of Centrifugal ChillerENG/5/001-24/01429-04-2024Muhammad Ali ShaikhOfficer Engineering01-07-2024Niaz Ali Jatoi Engineering
Preparation of IPA 70% for QC Micro Lab - Non CephQCM/5/003-24/00230-04-2024Mehran KhanSenior Executive QC   Quality Control
Daily Dispensing Logsheet for Warehouse - Dispensing Booth-02 - Non-CephWHG/5/018-21/00122-09-2021Saeed PathanWarehouse30-04-2024Niaz Ali JatoiS/111Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth-02 - Non-CephWHG/5/018-24/00230-04-2024Razia BegumSenior Executive Warehouse03-10-2024Niaz Ali JatoiS/12 (format revised)Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth-01 - Non-CephWHG/5/018-21/00122-09-2021Saeed PathanWarehouse Supervisor30-04-2024Niaz Ali JatoiS/110Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth-01 - Non-CephWHG/5/018-24/00230-04-2024Razia BegumSenior Executive Warehouse03-10-2024Niaz Ali JatoiS/13 (format revised)Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Dispensing Booth-01 - NCWHR/5/021-24/00230-04-2024Razia BegumSenior Executive Warehouse03-10-2024Niaz Ali JatoiS/14 (Format revised)Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Disp. Booth-01 - NCWHR/5/021-22/00123-05-2022Razia BegumSenior Executive Warehouse30-04-2024Niaz Ali JatoiS/601Warehouse
Machine Equipment Logbook - Granulator - 03 (G2) - NCPRG/5/102-24/00530-04-2024Sultan SikandarOfficer Production27-09-2024Niaz Ali JatoiS/175Production Non-Ceph
Utensils Cleaning Checklist Log - NutraceuticalWHG/5/021-24/00130-04-2024Razia BegumSenior Executive Warehouse   Warehouse
Disinfectant Preparation Logsheet - Raw Material Store - Non-CephWHG/5/053-24/00430-04-2024Razia BegumSenior Executive Warehouse   Warehouse
Utensils Cleaning Checklist Log - Non-CephWHG/5/021-24/00130-04-2024Razia BegumSenior Executive Warehouse  S/17Warehouse
Monitoring of Differential Pressure Logbook for Dispensing Booth-01-NCWHR/5/022-22/00123-05-2022Razia BegumExecutive Warehouse30-04-2024Niaz Ali JatoiS/603Warehouse
Monitoring of Differential Pressure Logbook for Dispensing Booth-01-NCWHR/5/022-24/00230-04-2024Razia BegumSenior Executive Warehouse03-10-2024Niaz Ali JatoiS/18 (Format revised)Warehouse
Monitoring of Differential Pressure Logbook for Dispensing Booth-02-NCWHR/5/022-22/00123-05-2022Razia BegumExecutive Warehouse30-04-2024Niaz Ali JatoiS/604Warehouse
Monitoring of Differential Pressure Logbook for Dispensing Booth-02-NCWHR/5/022-24/00230-04-2024Razia BegumSenior Executive Warehouse03-10-2024Niaz Ali JatoiS/19 (Format revised)Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Disp. Booth-02 - NCWHR/5/021-22/00123-05-2022Razia BegumExecutive Warehouse30-04-2024Niaz Ali JatoiS/602Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Disp. Booth-02 - NCWHR/5/021-24/00230-04-2024Razia BegumSenior Executive Warehouse03-10-2024Niaz Ali JatoiS/20 (format revised)Warehouse
Cleaning Logsheet of Warehouse - Non-Ceph - Raw Material StoreWHG/5/002-24/00130-04-2024Razia BegumSenior Executive Warehouse   Warehouse
Work In-Process IN/OUT Record - WIP-01 - CephPCG/5/020-24/00330-04-2024Usama YousufSenior Officer Production   Production Ceph
Work In-Process IN/OUT Record - WIP-02 - CephPCG/5/020-24/00230-04-2024Usama YousufSenior Officer Production   Production Ceph
Equipment / Machine Log book - ZP37 B-II-- Compression Machine- CephPRG/5/102-24/00530-04-2024Shahid Ali JhakSenior Executive Production30-10-2024Nasarullah Majeed Production Non-Ceph
Daily Temperature and Rh Logsheet - Ampoule Filling - CephPCG/5/007-24/00202-05-2024Usama YousufSenior Officer Production24-09-2024Niaz Ali JatoiS/67Production Ceph
Cleaning of Dispensing / Sampling Booth & Filters - Dispensing Booth-01 - NCWHG/5/036-21/00122-09-2021Saeed PathanWare02-05-2024Niaz Ali JatoiS/113Warehouse
Cleaning of Dispensing / Sampling Booth & Filters - Dispensing Booth-01 - NCWHG/5/036-24/00202-05-2024Razia BegumSenior Executive Warehouse  S/22Warehouse
Cleaning of Dispensing / Sampling Booth & Filters - Dispensing Booth-02 - NCWHG/5/036-21/00122-09-2021Saeed PathanWarehouse Supervisor02-05-2024Niaz Ali JatoiS/114Warehouse
Cleaning of Dispensing / Sampling Booth & Filters - Dispensing Booth-02 - NCWHG/5/036-24/00202-05-2024Razia BegumSenior Executive Warehouse  S/23Warehouse
Cleaning of Dispensing / Sampling Booth & Filters - Sampling Booth-01 - NCWHG/5/036-21/00122-09-2021Saeed PathanWarehouse Supervisor02-05-2024Niaz Ali JatoiS/117Warehouse
Cleaning of Dispensing / Sampling Booth & Filters - Sampling Booth-01 - NCWHG/5/036-24/00202-05-2024Razia BegumSenior Executive Warehouse  S/24Warehouse
Mask Filter Changing Logbook "Warehouse - Dispensing"WHR/5/023-22/00108-09-2022Razia BegumSenior Executive Warehouse02-05-2024Niaz Ali JatoiS/A-869Warehouse
Mask Filter Changing Logbook "Warehouse - Dispensing"WHR/5/023-24/00202-05-2024Razia BegumSenior Executive Warehouse07-10-2024Niaz Ali JatoiS/26Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth- NutraWHG/5/018-21/00122-09-2021Saeed PathanWarehouse Supervisor02-05-2024Niaz Ali JatoiS/112Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth- NutraWHG/5/018-24/00202-05-2024Razia BegumSenior Executive Warehouse30-09-2024Niaz Ali JatoiS/25Warehouse
Daily Temperature and Rh Monitoring Logsheet - Basement Coolest Point - Non-CephWHG/5/042-22/00103-02-2022Waqar AhmedExecutive Warehouse02-05-2024Niaz Ali JatoiS/391Warehouse
Daily Temperature and Rh Monitoring Logsheet - Basement Coolest Point - Non-CephWHG/5/042-24/00202-05-2024Razia BegumSenior Executive Warehouse30-09-2024Niaz Ali JatoiS/27Warehouse
Daily Temperature and Rh Monitoring Logsheet - EHGC Area - Non-CephWHG/5/042-22/00103-02-2022Waqar AhmedExecutive Warehouse02-05-2024Niaz Ali JatoiS/392Warehouse
Daily Temperature and Rh Monitoring Logsheet - EHGC Area - Non-CephWHG/5/042-24/00202-05-2024Razia BegumSenior Executive Warehouse  S/28Warehouse
Daily Temperature and Rh Monitoring Logsheet - Basement Warmest Point - Non-CephWHG/5/042-22/00103-02-2022Waqar AhmedExecutive Warehouse02-05-2024Niaz Ali JatoiS/390Warehouse
Daily Temperature and Rh Monitoring Logsheet - Basement Warmest Point - Non-CephWHG/5/042-24/00202-05-2024Razia BegumSenior Executive Warehouse30-09-2024Niaz Ali JatoiS/29Warehouse
Disinfectant Preparation Logsheet - Packing Material Store - Non-CephWHG/5/053-23/00207-07-2023Waqar AhmedExecutive Warehouse02-05-2024Niaz Ali JatoiS/04Warehouse
Disinfectant Preparation Logsheet - Packing Material Store - Non-CephWHG/5/053-24/00302-05-2024Waqar AhmedAssistant Manager Warehouse  S/30Warehouse
Cleaning Logsheet of Warehouse - Packaging Warehouse - Non-CephWHG/5/002-24/00102-05-2024Waqar AhmedAssistant Manager Warehouse  S/31Warehouse
Cleaning and Verification of Weighing Balance - RADWAG - 150KG - Receiving Bay - NCWHG/5/004-21/00108-11-2021Saeed PathanWarehouse Supervisor02-05-2024Niaz Ali JatoiS/209Warehouse
Cleaning and Verification of Weighing Balance - RADWAG - 150KG - Receiving Bay - NCWHG/5/004-24/00202-05-2024Razia BegumSenior Executive Warehouse  S/32Warehouse
Receiving of Dispensed Batches for Warehouse "Dispensing Booth 01 & 02" Non-CephWHG/5/016-23/00212-05-2023Razia BegumSenior Executive Warehouse02-05-2024Niaz Ali Jatois/1169Warehouse
Receiving of Dispensed Batches for Warehouse "Dispensing Booth 01 & 02" Non-CephWHG/5/016-24/00302-05-2024Razia BegumSenior Executive Warehouse  S/33Warehouse
Logbook for Hot Incubator - NCQCM/5/032-24/00202-05-2024Mehran KhanSenior Executive QC01-01-1900 S/228Quality Control
Logbook for Hot Incubator - NCQCM/5/032-22/00128-12-2022Muzaffar AliSenior Executive QC03-05-2024Niaz Ali JatoiS/966Quality Control
Machine Equipment Logbook - ZP37 B-I Deduster - NCPRG/5/102-24/00503-05-2024Shahid Ali JhakSenior Executive Production18-10-2024Niaz Ali JatoiS/178Production Non-Ceph
Machine Equipment Logbook - ZP37 B-I Metal Detector - NCPRG/5/102-24/00403-05-2024shahid Ali JhakSenior Executive Production18-10-2024Niaz Ali JatoiS/177Production Non-Ceph
New Tooling Inspection Record Form - NutraPNG/5/003-24/00230-04-2024Ayyan Usman KakviOfficer Production  S/43Production Nutraceutical
General Equipment Logbook - Oven - Ceph Lab.QCI/5/030-24/00206-05-2024NarainDeputy Manager QC  S/229Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00606-05-2024Bilal Ali KhanOfficer17-05-2024Niaz Ali JatoiS/230Quality Control
Machine / Equipment Logbook - Blister Machine - BM 350-A - NCPRG/5/102-24/00906-05-2024Abdul GhaniSenior Executive Production09-07-2024Niaz Ali JatoiS/179Production Non-Ceph
Machine Equipment Logbook - ZPW-23 Deduster - NCPRG/5/102-24/00506-05-2024Muhammad AyubSenior Executive Production21-11-2024Niaz Ali JatoiS/130Production Non-Ceph
Machine Equipment Logbook - ZPW23 Metal Detector - NCPRG/5/102-24/00506-05-2024Muhammad AyubSenior Executive Production25-11-2024Niaz Ali JatoiS/181Production Non-Ceph
Equipment / Machine Logbook - Conventional Coating Pan - PD MfgPDG/5/015-24/00107-05-2024UsamaOperator  S/36Product Development
PM Testing Logbook of Lid and Base Foil - Imran GhouriQCP/5/018-24/00907-05-2024Imran GhouriExecutive QC01-08-2024Nasrullah MajeedS/235 Logbook retreivedQuality Control
PM Testing Logbook for Adhesive Tape and DI - Zain ul HadiQCP/5/019-24/00807-05-2024Zain ul HadiOfficer QC07-09-2024Niaz Ali JatoiS/234Quality Control
Material Complain Log Sheet - QC Packaging SectionQCG/5/028-24/00106-05-2024Farhat Subhan KhattakSenior Executive QC  S/233Quality Control
General Equipment Logbook - Weighing Balance -WB-NCP-ML-01QCI/5/030-24/00207-05-2024Mehran KhanSenior Executive QC03-09-2024Niaz Ali JatoiS/236Quality Control
Finished Product Testing logbook - Daniyal KhalidQCG/5/015-24/00308-05-2024Daniyal KhalidSenior Executive QC01-01-1900 S/237Quality Control
Machine Maintenance Logbook - Roller Compactor LGP200 - NCENG/5/014-24/00125-04-2024Ebad MazharDeputy Manager Engineering  S/38Engineering
Machine Maintenance Logbook - DC Blender 200kg - CephENG/5/014-24/00125-04-2024Ebad MazharDeputy Manager Engineering  S/39Engineering
Machine Maintenance Logbook - DC Blender 400kg - G-1-NCENG/5/014-24/00125-04-2024Ebad MazharDeputy Manager Engineering  S/40Engineering
Machine Maintenance Logbook - Automatic Bottle Blowing Machine - NutraENG/5/014-24/00125-04-2024Ebad MazharDeputy Manager Engineering  S/41Engineering
Machine Maintenance Logbook - Automatic Bottle Blowing Machine - Ceph AreaENG/5/014-24/00125-04-2024Ebad MazharDeputy Manager Engineering  S/42Engineering
Finished Product Testing logbook - Tanzeela AfzalQCG/5/015-24/00108-05-2024Tanzeela AfzalSenior Officer QC05-08-2024Niaz Ali JatoiS/238Quality Control
Daily Usage/Cleaning Logbook of IPC Equipment - Torque Tester - TQT-NCP-IPC-01QAN/5/001-24/00109-05-2024Mudassar NazeerAssistant Manager QA - IPC  S/13Quality Assurance
Machine Equipment Logbook - HHFZ Suspension Filling & Capping Machine - CephPCG/5/030-24/00110-05-2024Usama YousufSenior Officer Production  S/68Production Ceph
General Equipment Logbook - FTIR - NCQCI/5/030-24/00110-05-2024Ateequr RehmanAssistant Manager QC  S/239Quality Control
Over printing Machine Logbook - Domino Inkjet - MP-PAK-02-31-04PMG/5/043-24/00210-05-2024Abdul RasheedSenior Executive Production  S/132Production Non-Ceph
Raw Material Incoming Logbook - CephQCG/5/082-24/00106-05-2024Aqib AhmedSenior Officer QC01-01-1900 S/232Quality Control
Raw Material Incoming Logbook - Non-CephQCI/5/082-24/00206-05-2024Ateequr RehmanAssistant Manager QC  S/231Quality Control
Finished Good Testing Logbook - Hassan SiddiquiQCG/5/015-24/00310-05-2024Hassan SiddiquiOfficer QC07-09-2024Niaz Ali JatoiS/240Quality Control
Daily Usage / Cleaning Logbook of IPC Equipment - Hardness & Thickness Tester - NutraQAN/5/001-24/00411-05-2024Mudassar NazeerAssistant Manager QA - IPC  S/14Quality Assurance
Daily Usage / Cleaning Logbook of IPC Equipment - Friability Tester - NutraQAN/5/001-24/00311-05-2024Mudassar NazeerAssistant Manager QA - IPC  S/15Quality Assurance
Log Sheet for Microbial Culture Maintenance - Micro Lab NCQCM/5/004-24/00110-05-2024Mehran KhanSenior Executive QC  S/241Quality Control
Log Sheet for Purity of Microbial Culture - Micro NCQCM/5/005-24/00110-05-2024Mehran KhanSenior Executive QC  S/242Quality Control
Log Sheet for Usage of Laminar Air Flow (ESCO) - Micro Lab - NCQCI/5/110-24/00110-05-2024Mehran KhanSenior Executive QC  S/243Quality Control
Cleaning Logsheet of Microbiology Laboratory - NCQCM/5/013-24/00211-05-2024Mehran KhanSenior Executive QC  S/244Quality Control
Environmental Monitoring Report by Air Sampler of Production Area - NCQCM/5/120-24/00111-05-2024Mehran KhanSenior Executive QC  S/245Quality Control
Environmental Monitoring Report by Settle Plate for Fungal Count of Micro Laminar Air Flow - NCQCM/5/097-24/00111-05-2024Mehran KhanSenior Executive QC21-11-2024Niaz Ali JatoiS/246Quality Control
Usage Log Sheet for Cool Incubator VELP - Micro Lab - NCQCI/5/116-24/00111-05-2024Mehran KhanSenior Executive QC08-10-2024Niaz Ali JatoiS/247Quality Control
Temperature Monitoring Log Sheet for Cool Incubator VELP - Micro - NCQCI/5/115-24/00111-05-2024Mehran KhanSenior Executive QC21-11-2024Niaz Ali JatoiS/248Quality Control
Environmental Monitoring Report by Air Sampler of Micro Lab Laminar Air Flow - NCQCM/5/122-24/00111-05-2024Mehran KhanSenior Executive QC  S/249Quality Control
Cleaning Logsheet for Vial Sealing Machine and Sterile AreaPCG/5/019-24/00211-05-2024Usama YousufSenior Officer Production  S/70Production Ceph
Cleaning Logsheet for Automatic Bottle Sticker Labelling MachinePCG/5/009-24/00211-05-2024Usama YousufSenior Officer Production  S/71Production Ceph
Preparation and Filtration of IPA 70% RecordPCG/5/025-24/00211-05-2024Usama YousufSenior Officer Production  S/72Production Ceph
Preparation and Filtration Record for Sanitizing Agent - Sterile AreaPCG/5/022-24/00211-05-2024Usama YousufSenior Officer Production  S/73Production Ceph
Overprinting Logbook for Labelling MachinePCG/5/031-24/00111-05-2024Usama YousufSenior Officer Production  S/74Production Ceph
Logbsheet for Jobs Before Start Up and After Shutdown of Sterile AreaPCA/5/007-24/00111-05-2024Usama YousufSenior Officer Production  S/75Production Ceph
Cleaning Logbsheet of Warehouse - RM NutraceuticalWHG/5/002-24/00110-05-2024Razia BegumSenior Executive Warehouse  S/34Warehouse
Cleaning and Verification of Weighing Balance - RADWAG - 600GM - Dispensing Booth 01- NCWHG/5/004-00210-05-2024Razia BegumSenior Executive Warehouse  S/35Warehouse
Cleaning and Verification of Weighing Balance - Mettler - 15KG - Dispensing Booth-02- NCWHG/5/004-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/36Warehouse
Cleaning and Verification of Weighing Balance - Mettler - 15KG - Dispensing Booth - NutraWHG/5/004-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/37Warehouse
Cleaning and Verification of Weighing Balance - Mettler - 150KG - Dispensing Booth- NutraWHG/5/004-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/38Warehouse
Receiving of Dispensed Batches for Warehouse - NutraWHG/5/016-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/39Warehouse
Cleaning and Verification of Weighing Balance - Mettler - 420G - Dispensing Booth - NCWHG/5/004-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/40Warehouse
Cleaning and Verification of Weighing Balance - Mettler - 300KG - Dispensing Booth-01- NCWHG/5/004-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/41Warehouse
Cleaning and Verification of Weighing Balance - Mettler - 15KG - Dispensing Booth-01- NCWHG/5/004-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/42Warehouse
Cleaning and Verification of Weighing Balance - Mettler - 300KG - Dispensing Booth-02- NCWHG/5/004-24/00210-05-2024Razia BegumSenior Executive Warehouse  S/44Warehouse
Cleaning Logbsheet of Warehouse - FG NutraceuticalWHG/5/002-24/00110-05-2024Muhammad HunainOfficer Warehouse  S/45Warehouse
Daily Temperature and Rh Monitoring Logsheet - Cold Storage-01 - FGWHG/5/042-24/00213-05-2024Muhammad HunainOfficer Warehouse  S/46Warehouse
Daily Temperature and Rh Monitoring Logsheet - Cold Storage-02 - FGWHG/5/002-24/00213-05-2024Muhammad HunainOfficer Warehouse  S/47Warehouse
Daily Temperature and Rh Monitoring Logsheet - Finished Good -01 - Non-CephWHG/5/042-24/00213-05-2024Muhammad HunainOfficer Warehouse  S/48Warehouse
Cleaning Logsheet of Warehouse - Cold Storage - NCWHG/5/002-24/00213-05-2024Muhammad HunainOfficer Warehouse  S/49Warehouse
Daily Temperature and Rh Monitoring Logsheet - Finished Goods-02- Non-CephWHG/5/042-24/00213-05-2024Muhammad HunainOfficer Warehouse  S/50Warehouse
Disinfectant Preparation Logsheet - Nutraceutical WarehouseWHG/5/053-24/00213-05-2024Muhammad HunainOfficer Warehouse  S/51Warehouse
Disinfectant Preparation Logsheet - Finished Goods - Non-CephWHG/5/053-24/00313-05-2024Muhammad HunainOfficer Warehouse  S/52Warehouse
Daily Temperature and Rh Monitoring Logsheet - Finished Goods - NutraWHG/5/042-24/00213-05-2024Muhammad HunainOfficer Warehouse  S/53Warehouse
Cleaning Logsheet of Warehouse - Finished Goods - Non-CephWHG/5/002-24/00113-05-2024Muhammad HunainOfficer Warehouse  S/54Warehouse
INTERMEDIATE AND FINISHED PRODUCT SAMPLING LOGBOOK – CEPH AREAQAG/5/260-24/00211-05-2024Sajjad Hussain QureshiSenior Executive QA  S/18Quality Assurance
Daily Usage / Cleaning Logbook of IPC Equipment - Conductivity Meter - Non-CephQAN/5/001-24/00511-05-2024Mudassar NazeerAssistant Manager QA - IPC  S/19Quality Assurance
Intermediate & Finished Product Sampling Logbook - NutraQAG/5/260-24/00113-05-2024Mudassar NazeerAssistant Manager QA - IPC  S/21Quality Assurance
Intermediate & Finished Product Sampling Logbook - DPIQAG/5/260-24/00213-05-2024Mudassar NazeerAssistant Manager QA - IPC  S/22Quality Assurance
Conductivity Meter Verification Logbook - ncQAG/5/249-24/00413-05-2024Mudassar NazeerAssistant Manager QA - IPC  S/23Quality Assurance
Over Printing Machine Logbook for Labelling Machine - Bottle StickerPCG/5/031-24/00111-05-2024Usama YousufSenior Officer Production  S/76Production Ceph
PM Testing Logbook for Adhesive Tape and DI - Imran GhouriQCP/5/019-24/00913-05-2024Imran GhouriExecutive QC07-09-2024Niaz Ali JatoiS/250Quality Control
PM Testing Logbook for Adhesive Tape and DI - Rismha YousufQCP/5/019-24/00914-05-2024Rimsha YousufSenior Officer QC21-08-2024Niaz Ali JatoiS/251Quality Control
Equipment / Machine Logbook - Blister Machine BM 350 - E - NCPRG/5/102-24/00814-05-2024Abdul GhaniSenior Executive Production04-10-2024Niaz Ali JatoiS/183Production Non-Ceph
Microbiological Media Preparation Logbook - CephQCM/5/016-24/00314-05-2024Muzaffar AliSenior Executive QC  S/252Quality Control
Logsheet for Autoclave - Ceph AreaQCI/5/025-24/00114-05-2024Muzaffar AliSenior Executive QC  S/253Quality Control
Machine Equipment Logbook - T-700 - Deduster - NCPRG/5/102-24/00315-05-2024Shahid Ali JhakSenior Executive Production26-12-2024Niaz Ali JatoiS/185Production Non-Ceph
Machine Equipment Logbook - T-700 - Metal Detector - NCPRG/5/102-24/00315-05-2024Shahid Ali JhakSenior Executive Production  S/184Production Non-Ceph
Machine / Equipment Logbook - BG 150 Coating Manufacturing VesselPRG/5/102-24/00416-05-2024Muhammad AyubSenior Executive Production25-09-2024Niaz Ali JatoiS/186Production Non-Ceph
General Equipment Logbook - pH Meter INOLAB - Micro QC - NCQCI/5/030-24/00216-05-2024Mehran KhanSenior Executive QC10-12-2024Niaz Ali JatoiS/255Quality Control
Finished Product Testing logbook - Mariyam MuazzamQCI/5/015-24/00216-05-2024Mariyam MuazzamSenior Officer QC12-08-2024Niaz Ali JatoiS/254Quality Control
Finished Product Testing logbook - Ahsan KhanQCG/5/015-24/00316-05-2024Ahsan KhanOfficer QC24-12-2024Niaz Ali JatoiS/256Quality Control
General Equipment Logbook - Analytical Balance No.03QCI/5/030-24/00617-05-2024Ateequr RehmanAssistant Manager QC30-05-2024Niaz Ali JatoiS/257 Note: Logbook is closed and retrieved due to double page numbering.Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00717-05-2024Bilal Ali KhanOfficer QC05-06-2024Niaz Ali JatoiS/258Quality Control
Daily Temperature and Rh Monitoring Logsheet - Sterile Filling Area-CephPCG/5/007-24/00220-05-2024Usama YousufSenior Officer Production24-09-2024Niaz Ali JatoiS/77Production Ceph
Daily Temperature and Rh Monitoring Logsheet - Washing Area-CephPCG/5/007-24/00220-05-2024Usama YousufSenior Officer Production24-09-2024Niaz Ali JatoiS/78Production Ceph
Logbook for Batch Document PreparationQAD/5/008-24/00429-04-2024Syed Asif HussainOffice Assistant QA   Quality Assurance
Conveyor Belt Logbook - Belt No. 01 - NCPMG/5/040-24/00522-05-2024Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/187Production Non-Ceph
Machine Equipment Logbook - ZJT-40 Capsule Filling Machine - NCPRG/5/102-24/00423-05-2024Sultan SikandarOfficer Production  S/189Production Non-Ceph
Finished Product Testing logbook - Saqib QadirQCG/5/015-24/00227-05-2024Saqib QadirOfficer QC  S/259Quality Control
Microbiological Testing Report for Nutraceutical Products - ValidationQCM/5/049-24/00227-05-2024Mehran KhanSenior Executive QC  S/260Quality Control
Usage Logbook for Analytical balance No-05 QC packagingQCI/5/030-24/01028-05-2024Imran GhouriExecutive QC16-08-2024Nasrullah MajeedS/261Quality Control
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Rimsha YousufQCP/5/021-24/01330-05-2024Rimsha YousufSenior Officer QC07-09-2024Niaz Ali JatoiS/262Quality Control
General Equipment Logbook - Analytical Balance No.03QCI/5/030-24/00730-05-2024Rabab FatimaSenior Executive QC02-08-2024Nasrullah MajeedS/263Quality Control
Machine / Equipment Logbook - Fette P3030 - DedusterPRG/5/102-24/00530-05-2024Shahid Ali JhakSenior Executive Production20-11-2024Niaz Ali JatoiS/190Production Non-Ceph
Microbiological Testing Report of Pharmaceutical Products - Finished Products - NCQCM/5/057-24/00330-05-2024Mehran KhanSenior Executive QC  S/264Quality Control
Machine / Equipment Logbook - Fette P3030 - Metal DetectorPRG/5/102-24/00531-05-2024Shahid Ali JhakSenior Executive Production20-11-2024Niaz Ali JatoiS/191Production Non-Ceph
WIP In and Out Record Form - Non-CephPRW/5/001-24/01531-05-2024Shahid Ali JhakSenior Executive Production25-10-2024Niaz Ali JatoiS/192Production Non-Ceph
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00231-05-2024Abdul SabourQC Officer08-07-2024Niaz Ali JatoiS/265Quality Control
Stability Schedule RegisterQCG/5/033-24/00131-05-2024Daniyal KhalidSenior Executive QC  S/266Quality Control
Daily Temperature and Rh Monitoring Logsheet - Suspension Filling Area-CephPCG/5/007-24/00201-06-2024Usama YousufSenior Officer Production24-09-2024Niaz Ali JatoiS/79Production Ceph
Over Printing Machine Logbook - Ink Jet Printer TJ2002PMG/5/043-24/00504-06-2024Abdul BasitDeputy Manager Production14-10-2024Niaz Ali JatoiS/193Production Non-Ceph
Finished Product Testing logbook - Bilal Ali KhanQCG/5/015-24/00304-06-2024Bilal Ali KhanOfficer QC29-10-2024Niaz Ali JatoiS/267Quality Control
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Imran GhouriQCP/5/021-24/01104-06-2024Imran GhouriExecutive QC07-09-2024Niaz Ali JatoiS/268Quality Control
Stability Samples Receiving LogbookQCG/5/211-24/00204-06-2024Daniyal KhalidSenior Executive QC  S/270Quality Control
Environmental Monitoring Report by Settle Plate of Microbiology Lab Laminar Air Flow - NCQCM/5/042-24/00404-06-2024Mehran KhanSenior Executive QC08-10-2024Niaz Ali JatoiS/271Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00805-06-2024Bilal Ali KhanOfficer QC13-09-2024Niaz Ali JatoiS/272Quality Control
Cleaning and Verification of Weighing Balance - AND-GF-300 - DPI AreaPMG/5/040-24/00105-06-2024Muhammad AyubSenior Executive Production  S/194Production Non-Ceph
Monitoring of Differential Pressure Logbook for Liquid Manufacturing-NCPMG/5/013-24/00105-06-2024Muhammad AyubSenior Executive Production  S/195Production Non-Ceph
Monitoring of Differential Pressure Logbook for Liquid Air Blowing-NCPMG/5/013-24/00105-06-2024Muhammad AyubSenior Executive Production  S/196Production Non-Ceph
Monitoring of Differential Pressure Logbook for DPI Manufacturing-NCPMG/5/013-24/00105-06-2024Muhammad AyubSenior Executive Production  S/197Production Non-Ceph
Analytical Balance Usage Logbook - ATX224R - PDPDA/5/001-24/00105-06-2024Nadeem MuradAssistant Manager PD  S/37Product Development
PH Meter Usage Logbook - Toledo DS-20 - PDPDA/5/004-24/00105-06-2024Nadeem MuradAssistant Manager PD  S/38Product Development
Internal pH Meter Verification Log Sheet - Toledo DS-20 - PDPDA/5/005-24/00105-06-2024Nadeem MuradAssistant Manager PD  S/39Product Development
General Equipment Logbook - Dissolution Apparatus No.01QCI/5/030-24/00310-06-2024Ateequr RehmanAssistant Manager QC10-12-2024Niaz Ali JatoiS/273Quality Control
Water Sampling Logbook - QC Non-CephQCG/5/181-24/00612-06-2024Bilal Ali KhanOfficer QC27-11-2024Niaz Ali JatoiS/274Quality Control
Machine / Equipment Logbook - Blister Machine - BM 350-C - NCPRG/5/102-21/00121-06-2021Hasan JusaniOfficer Production03-07-2023Niaz Ali JatoiS/05Production Non-Ceph
Machine / Equipment Logbook - Blister Machine - BM 350-D - NCPRG/5/102-21/00121-06-2021Hasan JusaniOfficer Production18-05-2022Niaz Ali JatoiS/06Production Non-Ceph
Equipment Logbook - Blister BM-350-EPRG/5/102-21/00121-06-2021Hasan JusaniOfficer Production06-03-2022Niaz Ali JatoiS/07Production Non-Ceph
Logbook for IPC Equipment - Manual Thickness Tester - CephQAN/5/001-21/00123-06-2021Bushra RiazOfficer QA21-03-2024Niaz Ali JatoiS/08Quality Assurance
Logbook for IPC Equipment - Disintegration Tester - Non CephQAN/5/001-21/00123-06-2021Bushra RiazOfficer QA13-10-2021Niaz Ali JatoiS/09Quality Assurance
Batch History Audit Logbook - Non-CephQAG/5/018-24/00914-06-2024Abdul Wahab ShahSenior Executive QA  S/52Quality Assurance
Toll Out Finished Product Log - QAQCG/5/009-24/00214-06-2024Abdul Wahab ShahSenior Executive QA  S/53Quality Assurance
Batch History Audit Logbook - NutraceuticalQAG/5/018-24/00314-06-2024Abdul Wahab ShahSenior Executive QA  S/54Quality Assurance
Toll Out Finished Product Log - QAQCG/5/009-21/00124-06-2021Abdul Wahab ShahExecutive QA  S/10Quality Assurance
Out of Trend RegisterQCG/5/085-21/00124-06-2021Muhammad NawazLab Attendant  S/11Quality Control
Out of Specification RegisterQCG/5/063-21/00124-06-2021Muhammad NawazLab Attendant  S/12Quality Control
Logbook for IPC Equipment - Hardness / Thickness Tester - Non Ceph-AQAN/5/001-21/00125-06-2021Anwar AlamExecutive QA13-08-2021Niaz Ali JatoiS/13Quality Assurance
Logbook for IPC Equipment - Friability Tester - Nutra"QAN/5/001-21/00125-06-2021Bushra RiazSenior Officer QA25-01-2022Niaz Ali JatoiS/15Quality Assurance
Logbook for IPC Equipment - Leakage Tester - Nutra"QAN/5/001-21/00125-06-2021Bushra RiazSenior Officer QA21-02-2022Niaz Ali JatoiS/16Quality Assurance
Logbook for IPC Equipment - Disintegration Tester - Nutra"QAN/5/001-21/00125-06-2021Bushra RiazSenior Officer QA18-12-2023Niaz Ali JatoiS/17Quality Assurance
PM Testing Logbook for TOP/DI - Imran GhouriQCP/5/019-21/00123-06-2021Narain MalhiAssistant Manager QC02-09-2021Niaz Ali JatoiS/18Quality Control
PM Testing Logbook for TOP/DI - Farhat KhattakQCP/5/019-21/00123-06-2021Narain MalhiAssistant Manager QC05-10-2021Niaz Ali JatoiS/19Quality Control
Logbook for IPC Equipment - Mooisture Analyzer-Non Ceph"QAN/5/001-21/00128-06-2021Ariz JavaidSenior Officer QA19-07-2022Niaz Ali JatoiS/20Quality Assurance
Logbook for IPC Equipment - Friability Tester-Non CephQAN/5/001-21/00128-06-2021Ariz JavedSenior Officer QA18-10-2021Niaz Ali JatoiS/21Quality Assurance
Logbook for IPC Equipment - Leakage Tester-Non Ceph-AQAN/5/001-21/00130-06-2021Ariz JavaidSenior Officer QA06-08-2021Niaz Ali JatoiS/22Quality Assurance
Logbook for IPC Equipment - Leakage Tester- Ceph"QAN/5/001-21/00102-07-2021Abdul Wahab ShahSenior Executive QA07-03-2024Niaz Ali JatoiS/23Quality Assurance
General Usage Logbook for Dissolution # 06QCI/5/030-24/00421-06-2024Daniyal KhalidSenior Executive QC05-11-2024Niaz Ali JatoiS/275Quality Control
PM Testing Logbook for Lid and base foil (PharmEvo and Toll clients) Rimsha Yousuf - Non CephQCP/5/018-24/00624-06-2024Rimsha YousufQC Officer07-10-2024Niaz Ali JatoiS/276Quality Control
PM Testing Logbook for General Packaging Material - Imran GhouriQCP/5/020-24/00525-06-2024Imran GhouriExecutive QC  S/277Quality Control
Finished Product Testing logbook - Umair RafiqueQCG/5/015-24/00125-06-2024Umair RafiqueSenior Executive QC  S/278Quality Control
Machine Equipment Logbook - ZP37 B-II Metal Detector - NCPRG/5/102-24/00525-06-2024shahid Ali JhakSenior Executive Production  S/199Production Non-Ceph
Machine Equipment Logbook - ZP37 B-II Deduster - NCPRG/5/102-24/00525-06-2024shahid Ali JhakSenior Executive QC  S/198Production Non-Ceph
Logsheet for Distilled Water PlantPCG/5/014-24/01126-06-2024Adnan Ali KhanOperator07-10-2024Niaz Ali JatoiS/80 (QA IPC)Production Ceph
General Equipment Usage Logbook - Conductivity Meter - Mettler S230QCI/5/030-24/00626-06-2024Abdul SabourOfficer QC10-12-2024Niaz Ali JatoiS/279Quality Control
General Usage Logbook - Balance No. 04QCI/5/030-24/01127-06-2024Syed Asif AliSenior Executive QC30-08-2024Niaz Ali JatoiS/280Quality Control
Verification Log for Balance (ATX224R) - PD Analytical LabPDA/5/002-24/00127-06-2024Nadeem MuradAssistant Manager PD19-11-2024Niaz Ali JatoiS/40Product Development
Environmental Monitoring Report by Settle Plate of Ceph Sterile AreaQCM/5/024-24/00727-06-2024Muzaffar AliSenior Executive QC15-11-2024Niaz Ali JatoiS/281Quality Control
General Usage Logbook - Semi Micro Balance # 06QCI/5/030-24/00501-07-2024Ateequr RehmanAssistant Manager QC01-10-2024Niaz Ali JatoiS/283Quality Control
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-24/01128-06-2024Mehran KhanSenior Executive QC09-09-2024Niaz Ali JatoiS/282Quality Control
Daily Log sheet of Centrifugal ChillerENG/5/001-24/01501-07-2024Muhammad Ali ShaikhOfficer Engineering26-09-2024Nasarullah MajeedS/44Engineering
Log Book for Batch Document IssuanceQAG/5/115-24/00701-07-2024Syed Asif HussainOffice Assistant  S/55Quality Assurance
General Equipment Logbook - Vacuum Oven # 03 - FaithfulQCI/5/030-24/00101-07-2024Waqas ul Haque QaziSenior Executive QC  S/284Quality Control
General Equipment Logbook - Thermcraft Furnace # 02QCI/5/030-24/00101-07-2024Waqas ul Haque QaziSenior Executive QC  S/285Quality Control
Machine / Equipment Logbook - BG 400 Coating Manufacturing VesselPRG/5/102-24/00408-03-2024Shahid Ali JhakSenior Executive Production22-08-2024Niaz Ali JatoiS/160Production Non-Ceph
Logbook for Mobile Phase PreparationQCG/5/025-24/00502-07-2024Ateequr RehmanAssistant Manager QC05-12-2024Niaz Ali JatoiS/286Quality Control
Machine / Equipment Logbook - Manual Coating Pan - Manufacturing VesselPRG/5/102-24/00403-07-2024Shahid Ali JhakSenior Executive Production20-12-2024Niaz Ali JatoiS/200Production Non-Ceph
Microbial Count Report - Non- CephQCM/5/019-24/00603-07-2024Mehran KhanSenior Executive QC02-12-2024Niaz Ali JatoiS/287Quality Control
PM Testing Logbook of Lid and Base Foil - Zain ul HadiQCP/5/018-24/01204-07-2024Zain ul HadiOfficer QC07-10-2024Niaz Ali JatoiS/288Quality Control
General Equipment Logbook - Moisture Analyzer - NCQCI/5/030-24/00105-07-2024Waqas ul Haque KaziSenior Executive QC01-01-1900 S/289Quality Assurance
Machine / Equipment Logbook - Granulator - 01 - NCPRG/5/102-24/00608-07-2024Sultan SikandarOfficer Production01-01-1900 S/205Production Non-Ceph
Machine / Equipment Logbook - DC Blender 400kg - NCPRG/5/102-24/00108-07-2024Sultan SikandarOfficer Production01-01-1900 S/206Production Non-Ceph
Machine / Equipment Logbook - Hoonga Blister Machine - HM400P-A - NCPRG/5/102-24/00105-07-2024Muhammad DanishSenior Officer Production  S/203Production Non-Ceph
Equipment / Machine Logbook - Hoonga Blister Machine HM400P - B - NCPRG/5/102-24/00105-07-2024Muhammad DanishSenior Officer Production  S/204Production Non-Ceph
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00305-07-2024Abdul SabourOfficer QC26-07-2024Niaz Ali JatoiS/290Quality Control
Machine / Equipment Logbook - Blister Machine - BM 350-A - NCPRG/5/102-24/01009-07-2024Abdul GhaniSenior Executive Production26-09-2024Nasarullah MajeedS/207Production Non-Ceph
Daily Operation Report of BoilerENG/5/006-24/01713-05-2024Muhammad Ali ShaikhOfficer Engineering09-07-2024Niaz Ali JatoiS/43Engineering
Daily Operation Report of BoilerENG/5/006-24/01809-07-2024Hasnain ShabbirExecutive Engineering02-09-2024Niaz Ali JatoiS/45Engineering
Machine / Equipment Logbook - Coating Machine - BG-400E - NCPRG/5/102-24/00509-07-2024Shahid Ali JhakSenior Executive Production15-11-2024Niaz Ali JatoiS/208Production Non-Ceph
WIP In and Out Record Form - Non-CephPRW/5/001-24/01610-07-2024Shahid Ali JhakSenior Executive Production10-12-2024Niaz Ali JatoiS/209Production Non-Ceph
Finished Product Incoming Logbook - QC Non-CephQCG/5/083-24/01010-07-2024Syed Asif AliSenior Executive QC  S/291Quality Control
Monitoring of Differential Pressure Logbook for Blister-08 -NCPMG/5/013-24/00105-07-2024Muhammad DanishSenior Officer Production  S/201Production Non-Ceph
Monitoring of Differential Pressure Logbook for Blister-09 -NCPMG/5/013-24/00105-07-2024Abdul GhaniSenior Executive Production  S/202Production Non-Ceph
Usage Logbook for Mobile Phase PreparationPDA/5/007-24/00111-07-2024Nadeem MuradAssistant Manager PD  S/41Product Development
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-24/01004-06-2024Mehran KhanSenior Executive QC03-07-2024Niaz Ali JatoiS/269Quality Control
Machine / Equipment Logbook - Blister Machine - BM 350-D - NCPRG/5/102-24/00712-07-2024Abdul GhaniSenior Executive Production15-11-2024Niaz Ali JatoiS/210Production Non-Ceph
Machine Equipment Logbook - Manual Coating Pan 24 - NCPRG/5/102-24/00512-07-2024Shahid Ali JhakSenior Executive Production08-11-2024Niaz Ali JatoiS/211Production Non-Ceph
General Equipment Usage Logbook - Dissolution Apparatus No.03PRG/5/102-24/00412-07-2024Daniyal KhalidSenior Executive QC12-12-2024Niaz Ali JatoiS/292Quality Control
Conveyor Belt Logbook - Belt No.05PMG/5/040-24/00615-07-2024Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/213Production Non-Ceph
Machine / Equipment Logbook - Fluid Bed Dryer (120Kg) - NCPRG/5/102-24/00812-07-2024Sikandar SultanOfficer Production25-11-2024Niaz Ali JatoiS/212Production Non-Ceph
Semi Micro Balance Usage Lobook - AP225WDPDA/5/011-24/00115-07-2024Nadeem MuradAssistant Manager PD  S/42Product Development
Machine Equipment Logbook - GHL - NCPRG/5/102-24/00719-07-2024Sultan SikandarOfficer Production29-11-2024Niaz Ali JatoiS/214Production Non-Ceph
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00422-07-2024Abdul SabourOfficer QC07-08-2024Niaz Ali JatoiS/293Quality Control
Raw Material Testing Logbook - Muhammad MustafaQCG/5/184-24/00122-07-2024Muhammad MustafaSenior Executive QC02-10-2024Niaz Ali JatoiS/294Quality Control
Log Sheet For Operation of Ultra filtration plantENO/5/083-24/01122-07-2024Azeemul ZafarOperator01-11-2024Niaz Ali JatoiS/48Engineering
Log Sheet for Operation of RO PlantENO/5/084-24/01122-07-2024Azeemul ZafarOperator01-11-2024Niaz Ali JatoiS/47Engineering
Daily Log sheet of Water Management SystemENG/5/004-24/01122-07-2024Azeemul ZafarOperator01-11-2024Niaz Ali JatoiS/46Engineering
Finished Product Testing logbook - Ghalib ZaidiQCG/5/015-24/00124-07-2024Ghalib ZaidiSenior Officer QC  S/295Quality Control
Material Complain Log Sheet - QC Raw Material SectionQCG/5/028-24/00124-07-2024Waqas ul Haq KaziSenior Executive QC  S/296Quality Control
Raw Material Testing Logbook - New/Alternate SourceQCG/5/184-24/00124-07-2024Waqas ul Haq KaziSenior Executive QC  S/297Quality Control
Machine / Equipment Logbook - Double Cone Blender - NCPRG/5/102-24/00526-07-2024Sultan SikandarOfficer Production  S/216Production Non-Ceph
Finished Product Testing logbook - Saman BarlasQCG/5/015-24/01026-07-2024Saman BarlasSenior Officer QC  S/298Quality Control
Microbiological Media Preparation Logbook - Non-CephQCM/5/016-24/00426-07-2024Mehran KhanSenior Executive QC17-12-2024Niaz Ali JatoiS/299Quality Control
Daily Operational Log Sheet of Carrier Screw ChillerENH/5/001-24/00226-07-2024Muhammad Ali ShaikhOfficer Engineering  S/49Engineering
Machine / Equipment Logbook - Gral Mixer - NCPRG/5/102-24/00829-07-2024Sultan SikandarOfficer Production06-12-2024Niaz Ali JatoiS/217Production Non-Ceph
Logbook for Batch Document PreparationQAD/5/008-23/00201-02-2023Syed Asif HussainOffice Assistant23-02-2024Niaz Ali JatoiS/1025Quality Assurance
Logbook for Batch Document PreparationQAD/5/008-21/00101-11-2021Syed Asif HussainOffice Assistant01-02-2024Niaz Ali JatoiS/185Quality Assurance
Logbook for IPC Equipment - Disintegration Tester- CephQAN/5/001-21/00102-07-2021Abdul Wahab ShahSenior Executive QA  S/24Quality Assurance
Log sheet for operation of Ultra Filteration PlantENO/5/083-21/00107-07-2021Azeemul ZafarOperator11-11-2021Niaz Ali JatoiS/25Engineering
Log Sheet for Operation of Reverse Osmosis PlantENO/5/083-21/00107-07-2021Azeemul ZafarOperator09-11-2021Niaz Ali JatoiS/26Engineering
Daily Operation Report of BoilerENG/5/006-21/00107-07-2021Azeemul ZafarOperator22-09-2021Niaz Ali JatoiS/27Engineering
Daily Sheet of Water Management SystemENG/5/004-21/00107-07-2021Azeemul ZafarOperator11-11-2021Niaz Ali JatoiS/28Engineering
Daily Log sheet of Centrifugal ChillerENG/5/001-21/00107-07-2021Azeemul ZafarOperator09-11-2021Niaz Ali JatoiS/29Engineering
Daily Log Sheet of Air CompressorENG/5/017-21/00107-07-2021Azeemul ZafarOperator11-11-2021Niaz Ali JatoiS/30Engineering
Daily Record of Purified WaterENG/5/013-21/00107-07-2021Azeemul ZafarOperator15-02-2024Niaz Ali JatoiS/31Engineering
Logbook for IPC Equipment - Hardness / Thickness Tester - NutraQAN/5/001-21/00107-07-2021Abdul Wahab ShahSenior Executive QA17-03-2022Niaz Ali JatoiS/32Quality Assurance
Finished Product Testing Log Book for Tablet for NajeebQCG/5/105-21/00109-07-2021Najeeb FirdousiAssistant Manager QC  S/33Quality Control
Finished Product Testing Log Book for Tablet for WaleedQCG/5/105-21/00109-07-2021WaleedQC Officer02-11-2022Niaz Ali JatoiS/34Quality Control
Usage Log Book for Conductivity MeterQAG/5/248-21/00112-07-2021Fatima AkhlaqExecutive QA12-01-2022Niaz Ali JatoiS/35Quality Assurance
PM Testing Logbook for U/C & Master Carton - Imran GhouriQCP/5/021-21/00113-07-2021Imran GhouriExecutive QC13-07-2021Niaz Ali JatoiS/36Quality Control
Batch History Audit Log BookQAG/5/018-21/00113-07-2021Ariz JavaidSenior Officer QA21-02-2022Niaz Ali JatoiS/37Quality Assurance
Finish Product Incoming Log Book of QC - Non-CephQCG/5/083-21/00126-07-2021Ahmed RazaLab Attendant02-11-2021Niaz Ali JatoiS/38Quality Control
Finish Product Incoming Log Book of QC - NutraQCG/5/083-21/00126-07-2021Ahmed RazaLab Attendant16-09-2021Niaz Ali JatoiS/39Quality Control
Finish Product Incoming Log Book of QC - CephQCG/5/083-21/00129-07-2021Nawaz KhanLab Attendant12-02-2023Niaz Ali JatoiS/40Quality Control
Sterile Water for Injection Testing ReportQCG/5/045-21/00129-07-2021Nawaz KhanLab Attendant16-02-2023Niaz Ali JatoiS/41Quality Control
Logbook for IPC Equipment - Leakage Tester-Non Ceph-BQAN/5/001-21/00230-07-2021Ariz JavaidSenior Officer QA10-09-2021Niaz Ali JatoiS/42Quality Assurance
Logbook for re-issuance of Batch DocumentQAG/5/267-21/00109-08-2021Bushra RiazSenior Officer QA  S/43Quality Assurance
Redressing/Repacking Request Form LogbookQAG/5/097-21/00109-08-2021Fatima AkhlaqExecutive QA03-01-2022Niaz Ali JatoiS/44Quality Assurance
Daily Usage of IPC Equipment - Friability Tester PTF200 - Non-CephQAN/5/001-24/00430-07-2024Mudassar NazeerAssistant Manager QA - IPC13-12-2024Niaz Ali JatoiS/56Quality Assurance
Equipment / Machine Log book - Coating Machine BG-150 Non-cephPRG/5/102-24/00501-08-2024Shahid Ali JhakSr. Executive Prod.15-11-2024Niaz Ali JatoiS/ 218Production Non-Ceph
PM Testing Logbook For General Packaging material - Syed Zain-ul-HadiQCP/5/020-24/00401-08-2024Zain-Ul HadiOfficer QC01-01-1900 S/301Quality Control
Working Standard Usage logbook Non-cephQCG/5/301-24/00201-08-2024Ubaid Ur RehmanAssistant Manager - II01-01-1900 S/302Quality Control
Working Standard Vials Issuance Log Book - Non-cephQCG/5/300-24/00101-08-2024Ubaid Ur RehmanAssistant Manager - II01-01-1900 S/303Quality Control
PM Testing Logbook For Lid & base Foil- Imran Khan GhouriQCP/5/018-24/01001-08-2024Imran Khan GhouriExecutive QC07-10-2024Niaz Ali JatoiS/300Quality Control
General Usage Logbook For UV 1800QCI/5/030-24/00202-08-2024Ateeq Ur RehmanAssistant Manager Quality Control01-01-1900 S/305Quality Control
General Equipment Usage Logbook for Analytical Balance # 03QCI/5/030-24/00802-08-2024Rabab FatimaSenior Executive QC10-10-2024Niaz Ali JatoiS/304Quality Control
General Equipment Usage Logbook - TOC AnalyzerQCI/5/030-24/00502-08-2024sabourOfficer QC  S/307Quality Control
General Usage Logbook - Dissolution Apparatus No.05QCI/5/030-24/00505-08-2024Ateequr RehmanAssistant Manager QC01-01-1900 S/308Quality Control
Temperature Monitoring Log Sheet for Refrigerator - Micro - CephQCI/5/120-24/00105-08-2024Muzaffar AliSenior Executive QC  S/309Quality Control
Log sheet of Hot Incubator - CephQCI/5/119-24/00105-08-2024Muzaffar AliSenior Executive QC  S/311Quality Control
Temperature Monitoring logsheet of Hot Incubator - Micro Ceph LabQCI/5/118-24/00105-08-2024Muzaffar AliSenior Executive QC  S/312Quality Control
Water Bath Utilization Log Sheet - QC Micro CephQCI/5/111-24/00105-08-2024Muzaffar AliSenior Executive QC  S/313Quality Control
Dry Bath Utilization Log Sheet - QC Micro CephQCI/5/112-24/00105-08-2024Muzaffar AliSenior Executive QC  S//314Quality Control
Oven (Binder ED 53) Utilization logsheet - Micro Ceph LabQCI/5/114-24/00105-08-2024Muzaffar AliSenior Executive QC  S/315Quality Control
Temperature and Humidity Monitoring Logbook - QC Micro CephQCG/5/254-24/00105-08-2024Muzaffar AliSenior Executive QC  S/316Quality Control
Temperature and Humidity Monitoring Logbook - QC Packaging Lab - NCQCG/5/254-24/00105-08-2024Farhat Subhan KhattakSenior Executive QC  S/317Quality Control
Raw Material Testing Logbook - Ali RazaQCG/5/184-24/00106-08-2024Ali RazaOfficer QC01-11-2024Niaz Ali JatoiS/318Quality Control
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00506-08-2024Abdul SabourOfficer QC26-08-2024Niaz Ali JatoiS/319Quality Control
Monitoring of Differential Pressure Logbook for Non-Ceph - Granulation-02PMG/5/013-24/00201-08-2024Sultan SikandarOfficer Production  S/219Production Non-Ceph
Environmental Monitoring Report by Settle Plate for Fungal Count in LAF Microbiology Lab Non-Sterile area - CephQCM/5/118-24/00106-08-2024Muzaffar AliSenior Executive QC10-10-2024Niaz Ali JatoiS/320 - QA IPCQuality Control
Environmental Monitoring Report by Air Sampler of Sterile Testing Area - Ceph.QCM/5/043-24/00107-08-2024Muzaffar AliSenior Executive QC  S/321Quality Control
Environmental Monitoring Report by Settle Plate of Dispensing Booth Ceph. AreaQCM/5/112-24/00107-08-2024Muzaffar AliSenior Executive QC  S/322Quality Control
Format for Recording Refrigerator Items - QC Micro CephQCI/5/117-24/00107-08-2024Muzaffar AliSenior Executive QC  S/323Quality Control
Environmental Monitoring Report by Air Sampler of Production Sterile Area - CephQCM/5/015-24/00107-08-2024Muzaffar AliSenior Executive QC  S/324Quality Control
Bacterial Endotoxin Test Report - QC Micro CephQCM/5/021-24/00107-08-2024Muzaffar AliSenior Executive QC15-11-2024Niaz Ali JatoiS/325Quality Control
Environmental Monitoring Report by Settle Plate for Fungal Count of Production Ceph Sterile Area - CephQCM/5/094-24/00107-08-2024Muzaffar AliSenior Executive QC  S/326Quality Control
Logsheet for Usage of Laminar Air Flow - QC Micro. CephQCI/5/108-24/00107-08-2024Muzaffar AliSenior Executive QC  S/327Quality Control
Logsheet for Biological Safety Cabinet Class II Type A2 - QC Micro CephQCI/5/109-24/00107-08-2024Muzaffar AliSenior Executive QC  S/328Quality Control
Water for Injection Bulk Testing Report - QC CephQCG/5/043-24/00107-08-2024Muzaffar AliSenior Executive QC  S/329Quality Control
Environmental Monitoring Report by Settle Plate for Fungal Count of Sterility Testing Lab - QC Micro CephQCM/5/093-24/00107-08-2024Muzaffar AliSenior Executive QC  S/330Quality Control
Identification of Environmental Flora Report - QC Micro. CephQCM/5/007-24/00107-08-2024Muzaffar AliSenior Executive QC  S/331Quality Control
Particle Count Report of Dispensing Booth Ceph AreaQCM/5/113-24/00107-08-2024Muzaffar AliSenior Executive QC  S/332Quality Control
Microbiological Bioburden Testing Report of Primary Packaging Materials - QC Micro CephQCM/5/033-24/00107-08-2024Muzaffar AliSenior Executive QC  S/333Quality Control
Cleaning and Operation Log of Microscope Olympus - QC Micro CephQCI/5/092-24/00107-08-2024Muzaffar AliSenior Executive QC  S/334Quality Control
General Equipment Logbook - pH Meter S220 - QC NCQCI/5/030-24/00107-08-2024Ateequr RehmanAssistant Manager QC  S/335Quality Control
Cleaning and Housekeeping Record - Non-Ceph PackingPMG/5/001-24/00219-07-2024Abdul BasitDeputy Manager Production09-09-2024Niaz Ali JatoiS/215Production Non-Ceph
Purified Water Testing Report - Narain Malhi - Ceph AreaQCG/5/036-24/00608-08-2024Narain MalhiDeputy Manager QC28-11-2024Niaz Ali JatoiS/337Quality Control
Monitoring of Differential Pressure Logbook for Encapsulation Area - Non-CephPMG/5/013-24/00209-08-2024Shanza ShowkatAssistant Manager Production Nutra01-01-1900 S/220Production Non-Ceph
Verification Log for Balance (AP225WD) - PD Analytical LabPDA/5/003-24/00112-08-2024Nadeem MuradAssistant Manager PD31-10-2024Niaz Ali JatoiS/43Product Development
Logbook of IPC Equipment Moisture Analyzer Non-CephQAN/5/001-24/00415-08-2024Mudassar NazeerAssistant Manager QA - IPC01-01-1900 S/057Quality Assurance
Usage Logbook for Analytical balance No-05 QC packagingQCI/5/030-24/01116-08-2024Farhat SubhanAssistant Manager - II21-10-2024Niaz Ali JatoiS/339Quality Control
Machine / Equipment Logbook - Compression Machine ZP37-B-1 - NCPRG/5/102-24/00609-08-2024Shahid Ali JhakSenior Executive QC26-12-2024Niaz Ali JatoiS/221Production Non-Ceph
Daily Usage / Cleaning Logbook of IPC Equipment - Leakage Tester - Non-CephQAN/5/001-24/01120-08-2024Syed Mujtaba AbbasAssistant Manager QA - IPC  S/58Quality Assurance
Monitoring of Differential Pressure Logbook for Sachet Area-NCPMG/5/013-24/00212-08-2024Shanza ShowkatAssistant Manager Production Nutra  S/222Production Non-Ceph
Equipment / Machine Logbook - Blister Machine BM 350 - B - NCPRG/5/102-24/00915-08-2024Abdul GhaniAssistant Manager Production Nutra29-11-2024Niaz Ali JatoiS/223Production Non-Ceph
PM Testing Logbook for Adhesive Tape and DI - Rimsha YousufQCP/5/019-24/01021-08-2024Rimsha YousufSenior Officer QC15-11-2024Niaz Ali JatoiS/340Quality Control
PM Testing Logbook for Unit Carton and Master Carton - Zain ul HadiQCP/5/021-24/01221-08-2024Zain ul HadiSenior Officer QC23-12-2024Niaz Ali JatoiS/341Quality Control
Cleaning and Housekeeping Log of Nutraceutical BuildingPNG/5/009-24/00408-08-2024Ayyan Usman KakviExecutive Production  S/44Production Nutraceutical
Cleaning and Verification of Weighing Balance - WB-NUT-PH-02PNG/5/002-24/00208-08-2024Ayyan Usman KakviExecutive Production  S/45Production Nutraceutical
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00622-08-2024Abdul SabourOfficer QC09-09-2024Niaz Ali JatoiS/342Quality Control
Machine / Equipment Logbook - Coating Machine - BG400 Mfg. - NCPRG/5/102-24/00222-08-2024Shanza ShowkatAssistant Manager Production  S/225Production Non-Ceph
Finished Product Testing logbook - Muhammad Ghufran SiddiquiQCG/5/015-24/00222-08-2024Muhammad Ghufran SiddiquiExecutive QC  S/343Quality Control
Column Usage Logbook -HPLCsQCG/5/072-24/00323-08-2024Asif Ali JafriAssistant Manager QC  S/344Quality Control
Cleaning Logsheet of Sterility Test AreaQCM/5/048-24/00323-08-2024Muzaffar AliSenior Executive QC  S/346Quality Control
Cleaning Log Sheet of Microbiology Lab - Ceph.QCM/5/013-24/00223-08-2024Muzaffar AliSenior Executive QC  S/347Quality Control
Log Sheet for Fogging of Sterility Testing Area - QC Ceph MicroQCM/5/034-24/00223-08-2024Muzaffar AliSenior Executive QC  S/348Quality Control
Preparation and Filtration Record of Sanitization Agent - QC Micro CephQCM/5/069-24/00123-08-2024Muzaffar AliSenior Executive QC  S/349Quality Control
Preparation of IPA 70% for QC Micro Lab - CephQCM/5/003-24/00223-08-2024Muzaffar AliSenior Executive QC  S/350Quality Control
Record for Entering in Sterility Testing Room - QC Micro CephQCM/5/010-24/00223-08-2024Muzaffar AliSenior Executive QC  S/351Quality Control
Finger Touch Report of Sterility Test CephQCM/5/018-24/00323-08-2024Muzaffar AliSenior Executive QC  S/352Quality Control
Environmental Monitoring Report by Settle Plate of Sterility Lab CephQCM/5/025-24/00323-08-2024Muzaffar AliSenior Executive QC  S/353Quality Control
Sterility Test Report - QC Micro CephQCM/5/044-24/00423-08-2024Muzaffar AliSenior Executive QC28-11-2024Niaz Ali JatoiS/345Quality Control
WIP In and Out Record Form - Non-CephPRW/5/001-24/01723-08-2024Muhammad QasimManager Production  S/227Production Non-Ceph
Finished Product Testing logbook - Syed Ahmed Hussain - QC CephQCG/5/015-24/00127-08-2024Syed Ahmed HussainSenior Officer QC  S/354Quality Control
Finished Product Testing logbook - Aqib Ahmed - QC Ceph.QCG/5/015-24/00627-08-2024Aqib AhmedExecutive QC  S/355Quality Control
Daily Climatic Chamber Monitoring Log - # 06 Serial # W816.0170QCI/5/104-24/00228-08-2024Aqib AhmedExecutive QC  S/356Quality Control
Water for Injection Bulk for Ampoule, vial washingQCG/5/044-24/00128-08-2024Syed Ahmed HussainSenior Officer QC  S/357Quality Control
Cleaning and Verification of Weighing Balance - Suspension Filling - Radwag - CephPCG/5/024-24/00229-08-2024Usama YousufExecutive Production24-12-2024Niaz Ali JatoiS/81Production Ceph
Machine Equipment Logbook - UPS-Uhlman-2DT - NCPRG/5/102-24/00330-08-2024Abdul GhaniAssistant Manager Production  S/228Production Non-Ceph
General Usage Logbook - Balance No. 04QCI/5/030-24/01230-08-2024Asif Ali JafriAssistant Manager QC05-11-2024Niaz Ali JatoiS/358Quality Control
Daily Operation Report of BoilerENG/5/006-24/01902-09-2024Hasnain ShabbirExecutive Engineering25-10-2024Niaz Ali JatoiS/50Engineering
Daily Logsheet for Air Compressor- E-EN-PRM-01-24-02 - 75KWENG/5/017-24/01002-09-2024Hasnain ShabbirExecutive Engineering  S/51Engineering
Stability Protocol Report Number Issuance Logbook - QC NCQCG/5/186-24/00230-08-2024Daniyal KhalidAssistant Manager QC  S/359Quality Control
General Equipment Logbook - Weighing Balance -WB-NCP-ML-01QCI/5/030-24/00303-09-2024Mehran KhanSenior Executive QC  S/360Quality Control
Temperature Monitoring Logsheet - Hot Incubator (Memmert B-50)QCI/5/121-24/00103-09-2024Nida ZehraSenior Officer QC  S/361Quality Control
Monitoring of Differential Pressure Logbook for Coating - 03-NCPMG/5/013-24/00203-09-2024Shahid Ali JhakAssistant Manager Production Nutra  S/232Production Non-Ceph
Monitoring of Differential Pressure Logbook for Coating - 04-NCPMG/5/013-24/00203-09-2024Shahid Ali JhakAssistant Manager Production Nutra  S/231Production Non-Ceph
Monitoring of Differential Pressure Logbook for Coating - 01-NCPMG/5/013-24/00203-09-2024Shahid Ali JhakAssistant Manager Production  S/230Production Non-Ceph
Monitoring of Differential Pressure Logbook for Coating - 02-NCPMG/5/013-24/00203-09-2024Shahid Ali JhakAssistant Manager Production  S/229Production Non-Ceph
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-24/01203-09-2024Mehran KhanSenior Executive QC25-11-2024Niaz Ali JatoiS/362Quality Control
General Analytical Equipment Usage Logbook - Dissolution Apparatus -08PDG/5/104-24/00205-09-2024Nadeem MuradAssistant Manager PD  S/44Product Development
Monitoring of Differential Pressure Logbook for Compression-04-NCPMG/5/013-24/00204-09-2024Shahid Ali JhakAssistant Manager Production01-01-1900 S/233Production Non-Ceph
Monitoring of Differential Pressure Logbook for Compression-02-NCPMG/5/013-24/00204-09-2024Shahid Ali JhakAssistant Manager Production01-01-1900 S/234Production Non-Ceph
Monitoring of Differential Pressure Logbook for Compression-03-NCPMG/5/013-24/00204-09-2024Shahid Ali JhakAssistant Manager Production  S/235Production Non-Ceph
Monitoring of Differential Pressure Logbook for Compression-01-NCPMG/5/013-24/00204-09-2024Shahid Ali JhakAssistant Manager Production  S/236Production Non-Ceph
Batch Document Observation - CephQAG/5/054-24/00320-08-2024Irfan Ali ShahExecutive QA  S/59Quality Assurance
Conveyor Belt Logbook - Belt No. 01 - NCPMP/5/001-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/238 Note: Format changed, previous PMG/5/040-24/005Production Non-Ceph
Conveyor Belt Logbook - Belt No. 02 - NCPMP/5/001-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/239 Note: Format changed, previous PMG/5/040-24/004 / S /134Production Non-Ceph
Conveyor Belt Logbook - Belt No. 03 - NCPMP/5/001-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/237. Note: Format changed, previous PMG/5/040-24/004 S/139Production Non-Ceph
Conveyor Belt Logbook - Belt No. 04 - NCPMG/5/040-24/00407-02-2024Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/144Production Non-Ceph
Conveyor Belt Logbook - Belt No. 04 - NCPMP/5/001-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/240. Note: Format changed, previous PMG/5/040-24/004 /s/144Production Non-Ceph
Conveyor Belt Logbook - Belt No.05 - NCPMP/5/001-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/241. Note: Format changed, previous PMG/5/040-24/006 /S/213Production Non-Ceph
Conveyor Belt Logbook - Belt No.06PMP/5/001-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/242. Note: format changed, previous PMG/5/040-24/006/S/706Production Non-Ceph
Conveyor Belt Logbook - Belt No.07 - NCPMG/5/040-24/00526-03-2024Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/163Production Non-Ceph
Conveyor Belt Logbook - Belt No.07 - NCPMP/5/001-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/243. Note: Format changed, previous PMG/5/040-24/005 /S/163Production Non-Ceph
Logbook for 2D Barcode Printing Machine - No.01 - NCPMG/5/031-23/00215-12-2023Abdul BasitDeputy Manager Production06-09-2024Niaz Ali JatoiS/126Production Non-Ceph
Factory Determination Sheet - QC Ceph LabQCI/5/090-24/00106-09-2024Aqib AhmedExecutive QC  S/363Quality Control
Stability Schedule Register - QC CephQCG/5/033-24/00106-09-2024Aqib AhmedExecutive QC  S/364Quality Control
Overprinting Logbook for 2D Barcode Printing Machine No. 02 - Non-Ceph.,PMP/5/004-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/245. Note: Format changed, previous PMG/5/031-23/002/S/103Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No.04 - Non-Ceph.PMP/5/004-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/247. Format Changed, previous PMG/5/031-22/001/S/849Production Non-Ceph
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Imran GhouriQCP/5/021-24/01207-09-2024Imran GhouriExecutive QC03-12-2024Niaz Ali JatoiS/365Quality Control
Monitoring of Differential Pressure Logbook for Compression-05-NCPMG/5/013-24/00206-09-2024Shahid Ali JhakAssistant Manager Production  S/250Production Non-Ceph
Monitoring of Differential Pressure Logbook for Compression-06-NCPMG/5/013-24/00206-09-2024Shahid Ali JhakAssistant Manager Production  S/251Production Non-Ceph
Monitoring of Differential Pressure Logbook for Compression-07-NCPMG/5/013-24/00206-09-2024Shahid Ali JhakAssistant Manager Production01-01-1900 S/252Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No. 01 - Non-Ceph.,PMP/5/004-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/244 Note: Format changed, previous PMG/5/031-23/002/S/126Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No. 03 - Non-Ceph.,PMP/5/004-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/246 Note: Format changed, previous PMG/5/031-23/002/S/128Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No.05 - Non-Ceph.PMP/5/004-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/248 Note: Format changed, previous PMG/5/031-23/002/S/114Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No. 06 - Non-Ceph.,PMP/5/004-24/00106-09-2024Saad AliOfficer Production01-11-2024Niaz Ali JatoiS/249 Note: format changed, previous PMG/5/031-24/002/S/133Production Non-Ceph
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Rimsha YousufQCP/5/021-24/01407-09-2024Rimsha YousufSenior Officer QC01-11-2024Niaz Ali JatoiS/367Quality Control
Daily Usage / Cleaning Logbook of IPC Equipment - DT Apparatus (Galvascientific) - NCQAN/5/001-24/00107-09-2024Mudassar NazeerAssistant Manager QA - IPC  S/60Quality Assurance
PM Testing Logbook for Adhesive Tape and DI - Imran GhouriQCP/5/019-24/01007-09-2024Imran GhouriExecutive QC22-11-2024Niaz Ali JatoiS/368Quality Control
PM Testing Logbook for Adhesive Tape and DI - Zain ul HadiQCP/5/019-24/00907-09-2024Zain ul HadiSenior Officer QC19-11-2024Niaz Ali JatoiS/369Quality Control
Cleaning and Operation of Autoclave - CephPCG/5/021-24/00109-09-2024Usama YousufExecutive Production01-01-1900 S/84 Note: format changed, previous PCG/5/011-23/002/S/24Production Ceph
Cleaning Logsheet of WFI and PW Storage Tank - Ceph.PCG/5/021-24/00209-09-2024Mazhar AliExecutive Production  S/84Production Ceph
Daily Monitoring of Differential Pressure of Sterile Area -CephPCG/5/013-24/00409-09-2024Usama YousufExecutive Production31-10-2024Niaz Ali JatoiS/85Production Ceph
Logsheet for Neutralization for Vials - CephPCG/5/002-24/00209-09-2024Usama YousufExecutive Production31-10-2024Niaz Ali JatoiS/86Production Ceph
Optical Lux Monitoring Record - CephPCA/5/011-24/00109-09-2024Usama YousufExecutive Production  S/90Production Ceph
Optical Inspection Record - CephPCA/5/008-24/00109-09-2024Usama YousufExecutive Production01-01-1900 s/89Production Ceph
Optical Booth Cleaning and Utilization LogbookPCA/5/009-24/00109-09-2024Usama YousufExecutive Production  S/87Production Ceph
Logsheet for Rest Time During Optical Inspection - CephPCA/5/010-24/00109-09-2024Usama YousufExecutive Production  S/88Production Ceph
Daily Monitoring of Differential Pressure of Non-Sterile Area -CephPCG/5/032-24/00109-09-2024Usama YousufExecutive Production31-10-2024Niaz Ali JatoiS/91Production Ceph
Machine Equipment Logbook - BGK 350 Coating Machine - NCPRG/5/102-24/00510-09-2024Shahid Ali JhakAssistant Manager Production  S/259Production Non-Ceph
Daily Cleaning and Housekeeping Logbook - Non-Ceph PackingPMG/5/001-24/00309-09-2024Mohammad QassimManager Production06-11-2024Niaz Ali JatoiS/253Production Non-Ceph
Daily Cleaning and Housekeeping Logbook - Non-Ceph ManufacturingPMG/5/001-24/00109-09-2024Mohammad QassimManager Production04-11-2024Niaz Ali JatoiS/254Production Non-Ceph
Disinfectant Preparation Logsheet - Non-CephPMG/5/039-24/00109-09-2024Mohammad QassimManager Production29-11-2024Niaz Ali JatoiS/255Production Non-Ceph
Weekly Drain Sanitization Log - Non-CephPMG/5/055-24/00109-09-2024Mohammad QassimManager Production22-11-2024Niaz Ali JatoiS/256Production Non-Ceph
Weekly Cleaning and Housekeeping - Non-Ceph ManufacturingPMG/5/054-24/00109-09-2024Mohammad QassimManager Production  S/258Production Non-Ceph
Finished Product Testing logbook - Hassan SiddiquiQCG/5/015-24/00410-09-2024Hassan SiddiquiSenior Officer QC  S/370Quality Control
Purified Water Testing Report - Bilal Ali KhanQCG/5/036-24/00910-09-2024Bilal Ali KhanSenior Officer QC  S/371Quality Control
Daily Climatic Walk-In Stability Chamber - NCQCI/5/122-24/00110-09-2024Daniyal KhalidAssistant Manager QC  S/372Quality Control
Test Solution / Buffer Solution / IndicatorQCG/5/049-24/00216-09-2024Waqas ul Haq KaziASSISTANT MANAGER QUALITY CONTROL (RAW MATERIAL)  S/373Quality Control
Finished Product Testing logbook - Tanzeela AfzalQCG/5/015-24/00202-08-2024Tanzeela AfzalSenior Officer QC10-12-2024Niaz Ali JatoiS/306Quality Control
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00707-09-2024Abdul SabourOfficer QC02-10-2024Niaz Ali JatoiS/366Quality Control
Equipment / Machine Log book - Blister 350-C Non-CephPRG/5/102-24/00818-09-2024Abdul GhaniAssistant Manager Production  S/270Production Non-Ceph
Finished Product Testing logbook - Mariyam MuazzamQCG/5/015-24/00312-08-2024Mariyam MuazzamSenior Officer QC  S/338Quality Control
Logsheet for Entry and Exist in Sterile Area - Filling - CephPCG/5/006-24/00620-09-2024Syed Baqar AliAssistant Manager Production21-11-2024Niaz Ali JatoiS/92Production Ceph
Packaging Material Incoming Logbook for PharmevoQCP/5/005-24/00619-09-2024Farhat Subhan KhattakAssistant Manager QC  S/376Quality Control
Equipment / Machine Log book - Hoonga Cartoner (HC-400) - E-MP-PAK-01-56-01PRG/5/102-24/00120-09-2024Rasheed KhanExecutive Production  S/271Production Non-Ceph
Equipment / Machine Log book - Hoonga Cartoner (HC-400) - E-MP-PAK-01-56-02PRG/5/102-24/00120-09-2024Rasheed KhanExecutive Production  S/272Production Non-Ceph
Machine / Equipment Logbook - Auto Labeller - NutraPNG/5/001-24/00209-09-2024Ayyan Usman KakviExecutive Production  S/46Production Nutraceutical
Machine / Equipment Logbook - Induction Sealing Machine - NutraPNG/5/001-24/00219-09-2024Ayyan Usman KakviExecutive Production  S/47Production Nutraceutical
Microbiological Testing Report - Stability Testing of Zi-Ad Syrup and Zi-Ad TabletQCM/5/057-24/00120-09-2024Mehran KhanSenior Executive QC  S/377Quality Control
Machine / Equipment Logbook - Capper Machine - NutraPNG/5/001-24/00223-09-2024Abdul BasitDeputy Manager Production (Nutra)  S/48Production Nutraceutical
Machine / Equipment Logbook - Granulator-02- NCPRG/5/102-24/00524-09-2024Madni RazaExecutive Production  S/273Production Non-Ceph
Machine / Equipment Logbook - ZPW23 - Compression Machine - NCPRG/5/102-24/00624-09-2024Shahid Ali JhakAssistant Manager Production  S/274Production Non-Ceph
Machine / Equipment Logbook - BG 150 Coating Manufacturing VesselPRG/5/102-24/00525-09-2024Muhammad QasimManager Production  S/275Production Non-Ceph
Machine / Equipment Logbook - BGK-350 Coating Vessel - NCPRG/5/102-24/00525-09-2024Muhammad QasimManager Production  S/276Production Non-Ceph
Usage Logbook of IPC Equipment - Hardness / Thickness Tester - NCQAN/5/001-24/00725-09-2024Abdul Wahab ShahAssistant Manager QA  S/62Quality Assurance
Daily Usage Cleaning Logbook of IPC Equipment Disintegration Tester - Non CephQAN/5/001-24/00525-09-2024Abdul Wahab ShahAssistant Manager QA  S/61Quality Assurance
Daily Temperature and Rh Logsheet - Granulation Area - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/105Production Ceph
Daily Temperature and Rh Logsheet - Ampoule Filling - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/104Production Ceph
Daily Temperature and Rh Logsheet - Encapsulation Area - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/103Production Ceph
Daily Temperature and Rh Logsheet - Sterile Washing Area - CephPCG/5/007-24/00220-05-2024Usama YousufSenior Officer QC25-09-2024Niaz Ali JatoiS/78Production Ceph
Daily Temperature and Rh Logsheet - Sterile Washing Area - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/102Production Ceph
Daily Temperature and Rh Logsheet - WIP-01 - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/101Production Ceph
Daily Temperature and Rh Logsheet - WIP-02 - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/100Production Ceph
Daily Temperature and Rh Logsheet - Blister Area - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/99Production Ceph
Daily Temperature and Rh Logsheet - Coating - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/98Production Ceph
Daily Temperature and Rh Logsheet - Packing Area - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/97Production Ceph
Daily Temperature and Rh Logsheet - OPTICAL AREA - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/96Production Ceph
Daily Temperature and Rh Monitoring Logsheet - Suspension Filling Area-CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/95Production Ceph
Daily Temperature and Rh Monitoring Logsheet - Sterile Filling Area-CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/94Production Ceph
Daily Temperature and Rh Logsheet - Compression Area - CephPCG/5/007-24/00324-09-2024Usama YousufExecutive Production04-11-2024Niaz Ali JatoiS/93Production Ceph
Machine Equipment Logbook - FBD - 60KG - NCPRG/5/102-24/00626-09-2024Sultan SikandarOfficer Production   Production Non-Ceph
Machine Equipment Logbook - BM350-A - Blister Machine - NCPRG/5/102-24/01126-09-2024Abdul GhaniAssistant Manager Production02-12-2024Niaz Ali JatoiS/278Production Non-Ceph
Daily Log sheet of Centrifugal ChillerENG/5/001-24/01626-09-2024Muhammad Ali ShaikhOfficer Engineering27-11-2024Niaz Ali JatoiS/52Engineering
Machine Equipment Logbook - Granulator - 03 (G2) - NCPRG/5/102-24/00627-09-2024Shanza ShowkatAssistant Manager Production  S/279Production Non-Ceph
Daily Temperature and Rh Monitoring Logsheet - Basement Warmest Point - Non-CephWHG/5/042-24/00330-09-2024Razia BegumSenior Executive Warehouse  S/55Warehouse
Daily Temperature and Rh Monitoring Logsheet - Raw Material Warehouse - NutraWHG/5/042-24/00230-09-2024Razia BegumSenior Executive Warehouse  S/59Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Dispensing Booth - NutraWHR/5/021-21/00101-06-2022Razia BegumExecutive Warehouse30-09-2024Niaz Ali JatoiS/629Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Dispensing Booth - NutraWHR/5/021-24/00230-09-2024Razia BegumSenior Executive Warehouse  S/58Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth- NutraWHG/5/018-24/00330-09-2024Razia BegumSenior Executive Warehouse  S/57Warehouse
Monitoring of Differential Pressure - Dispensing Booth - NutraWHR/5/022-24/00230-09-2024Kanza ShoaibOfficer Warehouse01-01-1900 S/60Warehouse
Monitoring of Differential Pressure - Dispensing Booth - NutraWHR/5/022-22/00101-06-2022Razia BegumExecutive Warehouse30-09-2024Niaz Ali JatoiS/628Warehouse
Daily Temperature and Rh Monitoring Logsheet - Basement Coolest Point - Non-CephWHG/5/042-24/00330-09-2024Kanza ShoaibOfficer Warehouse  S/56Warehouse
General Usage Logbook - Semi Micro Balance # 06QCI/5/030-24/00601-10-2024Rabab FatimaSenior Executive QC  S/379Quality Control
Raw Material Testing Logbook - Muhammad MustafaQCG/5/184-24/00202-10-2024Muhammad MustafaSenior Executive QC  S/381Quality Control
General Equipment Usage Logbook - pH Meter - Ino Lab - NC (WF700-12490088)QCI/5/030-24/00302-10-2024Abdul SabourOfficer QC01-01-1900 S/380Quality Control
Daily Dispensing Logsheet for Warehouse - Dispensing Booth- CephWHG/5/018-24/00122-09-2021Saeed PathanWarehouse Worker02-10-2024Niaz Ali JatoiS/109Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth- CephWHG/5/018-24/00202-10-2024Muslim FaisalSenior Executive Warehouse  S/61Warehouse
Daily Temperature and Rh Monitoring Logsheet - Cold/Controlled Storage - CephWHG/5/042-22/00103-02-2022Waqar AhmedExecutive Warehouse02-10-2024Niaz Ali JatoiS/401Warehouse
Daily Temperature and Rh Monitoring Logsheet - Cold/Controlled Storage - CephWHG/5/042-24/00202-10-2024Muslim FaisalSenior Executive Warehouse  S/62Warehouse
Daily Temperature & Humidity Monitoring - Raw Material Warehouse - CephWHG/5/042-22/00103-02-2022Waqar AhmedExecutive Warehouse02-10-2024Niaz Ali JatoiS/400Warehouse
Daily Temperature & Humidity Monitoring - Raw Material Warehouse - CephWHG/5/042-24/00202-10-2024Muslim FaisalSenior Executive Warehouse  S/63Warehouse
Monitoring of Differential Pressure - Dispensing Booth - CephWHR/5/022-22/00101-06-2022Razia BegumExecutive Warehouse02-10-2024Niaz Ali JatoiS/630 (IPC Ceph)Warehouse
Monitoring of Differential Pressure - Dispensing Booth - CephWHR/5/022-24/00202-10-2024Muslim FaisalSenior Executive Warehouse  S/64Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Dispensing Booth - CephWHR/5/021-22/00101-06-2022Razia BegumExecutive Warehouse02-10-2024Niaz Ali JatoiS/631 (QA IPC Ceph)Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Dispensing Booth - CephWHR/5/021-24/00202-10-2024Muslim FaisalSenior Executive Warehouse  s/65Warehouse
Mask Filter Changing Logbook - Dispensing Booth -CephWHR/5/023-24/00102-10-2024Muslim FaisalSenior Executive Warehouse  S/66Warehouse
Machine Equipment Logbook - Fette P3030 Compression Machine - NCPRG/5/102-24/00603-10-2024Shahid Ali JhakAssistant Manager Production  S/280Production Non-Ceph
Monitoring of Laminar Operational Time and Air Pressure - Disp. Booth-02 - NCWHR/5/021-24/00303-10-2024Muslim FaisalSenior Executive Warehouse  S/67Warehouse
Monitoring of Differential Pressure Logbook for Dispensing Booth-01-NCWHR/5/022-24/00303-10-2024Muslim FaisalSenior Executive Warehouse  S/68Warehouse
Monitoring of Laminar Operational Time and Air Pressure - Dispensing Booth-01 - NCWHR/5/021-24/00303-10-2024Muslim FaisalSenior Executive Warehouse  S/69Warehouse
nitoring of Differential Pressure Logbook for Dispensing Booth-02-NCWHR/5/022-24/00303-10-2024Muslim FaisalSenior Executive Warehouse  S/70Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth-02 - Non-CephWHG/5/018-24/00303-10-2024Muslim FaisalSenior Executive Warehouse  S/71Warehouse
Daily Dispensing Logsheet for Warehouse - Dispensing Booth-01 - Non-CephWHG/5/018-24/00303-10-2024Muslim FaisalSenior Executive Warehouse  S/72Warehouse
Usage Logsheet for Cool Incubator (VELP)QCI/5/116-24/00203-10-2024Mehran KhanSenior Executive QC  S/382Quality Control
Retention Sample Logbook - Non-CephQAG/5/032-24/00604-10-2024Mudassar NazeerAssistant Manager QA  S/63Quality Assurance
Equipment / Machine Logbook - Blister Machine BM 350 - E - NCPRG/5/102-24/00904-10-2024Abdul GhaniAssistant Manager Production  S/281Production Non-Ceph
Monitoring of Differential Pressure in Nutra - Compression-01 (ZPW20)PNG/5/007-24/00307-10-2024Ayyan Usman KakviExecutive Production  S/49Production Nutraceutical
PM Testing Logbook For Lid & base Foil- Imran Khan GhouriQCP/5/018-24/01107-10-2024Imran Khan GhouriExecutive QC  S/383Quality Control
PM Testing Logbook for Lid and base foil (PharmEvo and Toll clients) Rimsha Yousuf - Non CephQCP/5/018-24/00707-10-2024Rimsha YousufSenior Officer QC  S/385Quality Control
PM Testing Logbook of Lid and Base Foil - Zain ul HadiQCP/5/018-24/01307-10-2024Zainul HadiSenior Officer QC11-11-2024Niaz Ali JatoiS/386Quality Control
Environmental Monitoring Report by Settle Plate for Fungal Count in LAF Microbiology Lab Non-Sterile area - CephQCM/5/118-24/00207-10-2024Khalid AliExecutive QC  s/384Quality Control
Mask Filter Changing Logbook - Dispensing Non-CephWHR/5/023-24/00307-10-2024Razia BegumSenior Executive Warehouse  S/73Warehouse
Mask Filter Changing Logbook - Dispensing NutraWHR/5/023-24/00107-10-2024Razia BegumSenior Executive Warehouse  S/74Warehouse
Logsheet for Distilled Water PlantPCG/5/014-24/01207-10-2024Adnan Ali KhanOperator  S/106Production Ceph
Consumption of Main Diesel Storage TankENO/5/113-24/00126-09-2024Zahid IqbalDeputy Manager Eng  S/53Engineering
Environmental Monitoring Report by Settle Plate of Microbiology Lab Laminar Air Flow - NCQCM/5/042-24/00507-10-2024Mehran KhanSenior Executive QC  S/387Quality Control
General Equipment Usage Logbook for Analytical Balance # 03QCI/5/030-24/00910-10-2024Rabab FatimaSenior Executive QC11-12-2024Niaz Ali JatoiS/388Quality Control
Logbook for Filled Logbooks Issuance - NC & NutraQAG/5/309-24/00104-10-2024Hamza AnsariOffice Assistant  S/64Quality Assurance
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00826-09-2024Abdul SabourOfficer QC11-10-2024Niaz Ali JatoiS/378Quality Control
Purified Water Testing Report - Abdul SabourQCG/5/036-24/00911-10-2024Abdul SabourOfficer QC14-11-2024Niaz Ali JatoiS/389Quality Control
Over Printing Machine Logbook - Ink Jet Printer TJ2002PMG/5/043-24/00614-10-2024Imran AbidSenior Executive Production  S/282Production Non-Ceph
WIP In and Out Record Form - Non-CephPRW/5/001-23/01104-12-2023Shahid Ali JhakSenior Executive Production14-10-2024Niaz Ali Jatoi Production Non-Ceph
WIP In and Out Record Form - Non-CephPRW/5/001-24/01814-10-2024Shahid Ali JhakAssistant Manager Production  S/283Production Non-Ceph
Monitoring of Differential Pressure in Nutra - BGK-150 CoatingPNG/5/007-24/00316-10-2024Ayyan Usman KakviExecutive Production  S/50Production Nutraceutical
Logsheet for Entry and Exist in Sterile Area - Washing - CephPCG/5/006-24/00317-10-2024Usama YousufExecutive Production21-11-2024Niaz Ali JatoiS/107Production Ceph
Cleaning and Verification of Weighing Balance - AND-GF-300 - DPI AreaPMG/5/024-24/00217-10-2024Sultan SikandarSenior Officer Production  S/284Production Non-Ceph
Logbook for Pricing of Products - Non-Ceph ProductsQAG/5/299-24/00118-10-2024Abdul Wahab ShahAssistant Manager QA01-01-1900 S/65Quality Assurance
Logbook for Pricing of Products - Ceph ProductsQAG/5/299-24/00118-10-2024Irfan ShahExecutive QA  S/66Quality Assurance
Logbook for Pricing of Products - Nutraceutical ProductsQAG/5/299-24/00118-10-2024Abdul Wahab ShahAssistant Manager QA  S/67Quality Assurance
Machine Equipment Logbook - ZP37 B-I Metal Detector - NCPRG/5/102-24/00518-10-2024Shahid Ali JhakAssistant Manager Production  S/285Production Non-Ceph
Machine Equipment Logbook - ZP37 B-I Deduster - NCPRG/5/102-24/00618-10-2024Shahid Ali JhakAssistant Manager Production  S/286Production Non-Ceph
General Usage Logbook of for Dissolution Apparatus No.04QCI/5/030-24/00621-10-2024Rabab FatimaSenior Executive QC  S/390Quality Control
Usage Logbook for Analytical balance No-05 QC packagingQCI/5/030-24/01221-10-2024Farhat Subhan KhattakAssistant Manager QC06-12-2024Niaz Ali JatoiS/391Quality Control
Logbook for Cleaning and Operation of Autoclave - Shinva Double DoorPCA/5/005-24/00109-09-2024Usama YousufExecutive Production23-10-2024Niaz Ali JatoiS/83Production Ceph
Logbook for Cleaning and Operation of Autoclave - Shinva Double DoorPCA/5/005-24/00223-10-2024Usama YousufExecutive Production  S/108Production Ceph
Monitoring of Differential Pressure in Nutra - Sachet FillingPNG/5/007-24/00323-10-2024Abdul BasitDeputy Manager Production (Nutra)  s/51Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Double Cone BlenderPNG/5/007-24/00325-10-2024Ayyan Usman KakviExecutive Production  S/52Production Nutraceutical
Daily Operation Report of BoilerENG/5/006-24/02025-10-2024Hasnain ShabbirExecutive Engineering24-12-2024Niaz Ali JatoiS/54Engineering
Batch History Audit Logbook - Non-CephQAG/5/018-24/01029-10-2024Abdul Wahab ShahAssistant Manager QA  S/68Quality Assurance
Raw Material Testing Logbook - Ali RazaQCG/5/184-24/00229-10-2024Ali RazaOfficer QC  S/392Quality Control
Finished Product Testing logbook - Bilal Ali KhanQCG/5/015-24/00429-10-2024Bilal Ahmed KhanOfficer QC  S/393Quality Control
Equipment / Machine Log book - ZP37 B-II-- Compression Machine- CephPRG/5/102-24/00630-10-2024Shahid Ali JhakAssistant ManagerProduction   Production Non-Ceph
Verification Logbook for Semi Micro Balance (AP225WD) - PD Analytical LabPDA/5/003-24/00231-10-2024Nadeem MuradAssistant Manager PD  S/45Product Development
Daily Monitoring of Differential Pressure of Sterile Area -CephPCG/5/013-24/00531-10-2024Usama YousufExecutive Production  S/110Production Ceph
Daily Monitoring of Differential Pressure of Non-Sterile Area -CephPCG/5/032-24/00231-10-2024Usama YousufExecutive Production  S/109Production Ceph
Logsheet for Neutralization for Vials - CephPCG/5/002-24/00331-10-2024Usama YousufExecutive Production  S/111Production Ceph
Machine / Equipment Logbook - ZPW26-A METAL DETECTOR - NCPRG/5/102-24/00401-11-2024Shahid Ali JhakAssistant Manager Production  S/289Production Non-Ceph
Machine / Equipment Logbook - ZPW26-A DEDUSTER - NCPRG/5/102-24/00401-11-2024Shahid Ali JhakAssistant Manager Production  S/288Production Non-Ceph
Conveyor Belt Logbook - Belt No. 01 - NCPMP/5/004-24/00201-11-2024Imran AbidSenior Executive Production  S/91Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No.05 - Non-Ceph.PMP/5/004-24/00201-11-2024Imran AbidSenior Executive Production  S/290Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No.05 - Non-Ceph.PMP/5/004-24/00201-11-2024Imran AbidSenior Executive Production  S/291Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No. 02 - Non-Ceph.,PMP/5/004-24/00201-11-2024Imran AbidSenior Executive Production  S/292Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No. 03 - Non-Ceph.,PMP/5/004-24/00201-11-2024Imran AbidSenior Executive Production  S/293Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No. 06 - Non-Ceph.,PMP/5/004-24/00201-11-2024Imran AbidSenior Executive Production  S/294Production Non-Ceph
Overprinting Logbook for 2D Barcode Printing Machine No.04 - Non-Ceph.PMP/5/004-24/00201-11-2024Imran AbidSenior Executive Production  S/295Production Non-Ceph
Conveyor Belt Logbook - Belt No. 01 - NCPMP/5/001-24/00201-11-2024Imran AbidSenior Executive Production  S/296Production Non-Ceph
Conveyor Belt Logbook - Belt No. 02 - NCPMP/5/001-24/00201-11-2024Imran AbidSenior Executive Production  S/297Production Non-Ceph
Conveyor Belt Logbook - Belt No. 03 - NCPMP/5/001-24/00201-11-2024Imran AbidSenior Executive Production  S/298Production Non-Ceph
Conveyor Belt Logbook - Belt No. 04 - NCPMP/5/001-24/00201-11-2024Imran AbidSenior Executive Production  S/299Production Non-Ceph
Conveyor Belt Logbook - Belt No.05 - NCPMP/5/001-24/00201-11-2024Imran AbidSenior Executive Production  S/300Production Non-Ceph
Conveyor Belt Logbook - Belt No.06PMP/5/001-24/00201-11-2024Imran AbidSenior Executive Production  S/301Production Non-Ceph
Conveyor Belt Logbook - Belt No.07 - NCPMP/5/001-24/00201-11-2024Imran AbidSenior Executive Production  S/302Production Non-Ceph
Log Sheet For Operation of Ultra filtration plantENO/5/083-24/01201-11-2024Hasnain ShabbirExecutive Engineering  S/55Engineering
Log Sheet for Operation of RO PlantENO/5/084-24/01201-11-2024Azeemul ZafarOperator  S/56Engineering
Daily Log sheet of Water Management SystemENG/5/004-24/01201-11-2024Azeemul ZafarOperator  S/57Engineering
Purified Water Testing Report - Abdul SabourQCG/5/036-24/01004-11-2024Abdul SabourOfficer QC27-11-2024Niaz Ali JatoiS/395Quality Control
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Rimsha YousufQCP/5/021-24/01501-11-2024Rimsha YousufSenior Officer QC  S/394Quality Control
Daily Temperature and Rh Logsheet - Granulation Area - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/112Production Ceph
Daily Temperature and Rh Logsheet - Compression Area - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/113Production Ceph
Daily Temperature and Rh Logsheet - Coating - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/114Production Ceph
Daily Temperature and Rh Monitoring Logsheet - Suspension Filling Area-CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/115Production Ceph
Daily Temperature and Rh Logsheet - Ampoule Filling - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/116Production Ceph
Daily Temperature and Rh Logsheet - Sterile Washing Area - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/117Production Ceph
Daily Temperature and Rh Monitoring Logsheet - Sterile Filling Area-CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/118Production Ceph
Daily Temperature and Rh Logsheet - Blister Area - CephPCG/5/007-27/00404-11-2024Usama YousufExecutive Production  S/119Production Ceph
Daily Temperature and Rh Logsheet - Encapsulation Area - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/120Production Ceph
Daily Temperature and Rh Logsheet - OPTICAL AREA - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/121Production Ceph
Daily Temperature and Rh Logsheet - WIP-01 - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/122Production Ceph
Daily Temperature and Rh Logsheet - WIP-02 - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/123Production Ceph
Daily Temperature and Rh Logsheet - Packing Area - CephPCG/5/007-24/00404-11-2024Usama YousufExecutive Production  S/124Production Ceph
Daily Cleaning and Housekeeping Logbook - Non-Ceph ManufacturingPMG/5/001-24/00204-11-2024Muhammad QasimManager Production  S/303Production Non-Ceph
General Usage Logbook - Balance No. 04QCI/5/030-24/01305-11-2024Rabab FatimaSenior Executive QC  S/396Quality Control
General Usage Logbook for Dissolution # 06QCI/5/030-24/00505-11-2024Rabab FatimaSenior Executive QC  S/397Quality Control
Daily Cleaning and Housekeeping Logbook - Non-Ceph PackingPMG/5/001-24/00406-11-2024Imran AbidSenior Executive Production  S/304Production Non-Ceph
Weekly Cleaning and Housekeeping Logbook - Packaging AreaPMG/5/054-24/00109-09-2024Muhammad QasimManager Production06-11-2024Niaz Ali JatoiS/257Production Non-Ceph
Weekly Cleaning and Housekeeping Logbook - Packaging AreaPMG/5/054-24/00206-11-2024Imran AbidSenior Executive Production  S/305Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZP37-BPMG/5/052-24/00208-11-2024Shahid Ali JhakAssistant Manager Production  S/308Production Non-Ceph
Tablet Tooling Usage History Log - Compression Machine - ZPW23PMG/5/052-24/00208-11-2024Shahid Ali JhakAssistant Manager Production  S/307Production Non-Ceph
Machine Equipment Logbook - Manual Coating Pan 24 - NCPRG/5/102-24/00608-11-2024Shahid Ali JhakAssistant Manager Production  S/306Production Non-Ceph
Sterile Area Cleaning LogbookPCA/5/003-24/00226-02-2024Usama YousufSenior Officer Production11-11-2024Niaz Ali Jatoi Production Ceph
Sterile Area Cleaning LogbookPCA/5/003-24/00311-11-2024Usama YousufExecutive Production  S/125Production Ceph
PM Testing Logbook of Lid and Base Foil - Zain ul HadiQCP/5/018-24/01411-11-2024Zainul HadiSenior Officer QC04-12-2024Niaz Ali JatoiS/398Quality Control
Logbook for Re-Issuance of Batch Documents Filled - Non-Ceph & NutraQAG/5/2/67-24/00112-11-2024Fauzia Shafi SiddiqiSenior Manager QA  S/69Quality Assurance
Machine Equipment Logbook - Drum Blender (Granulation) - CephPRG/5/102-24/00412-11-2024Usama YousufExecutive Production  S/126Production Ceph
Monitoring of Differential Pressure in Nutra - Blister AreaPNG/5/007-24/00328-10-2024Abdul BasitDeputy Manager Production (Nutra)  S/53Production Nutraceutical
Shift Hand Over and Take Over Logbook - Non-CephPRG/5/023-24/00113-11-2024Muhammad QasimManager Production  S/312Production Non-Ceph
Cleaning and Verification of Weighing Balance - AND-GF-300 - Compression-06PMG/5/024-24/00214-11-2024Shahid Ali JhakAssistant Manager Production  S/313Production Non-Ceph
Cleaning and Verification of Weighing Balance - AND-GF-300 - Compression-03PMG/5/024-24/00214-11-2024Shahid Ali JhakAssistant Manager Production  S/314Production Non-Ceph
Cleaning and Verification of Weighing Balance - AND-GF-300 - Compression-07PMG/5/024-24/00214-11-2024Shahid Ali JhakAssistant Manager Production  S/315Production Non-Ceph
Machine Equipment Logbook - Manesty Mixer (Granulation) - CephPRG/5/102-24/00414-11-2024Usama YousufExecutive Production  S/127Production Ceph
Dies and Punches Issuance, Receiving, Inspection and Maintenance Log - NCPMG/5/047-23/00124-07-2023Shahid Ali JhakExecutive Production21-11-2024Niaz Ali JatoiS/82Production Non-Ceph
Dies and Punches Issuance, Receiving, Inspection and Maintenance Log - NCPMG/5/047-24/00215-11-2024Shahid Ali JhakAssistant Manager Production  S/316Production Non-Ceph
PM Testing Logbook for Adhesive Tape and DI - Rimsha YousufQCP/5/019-24/01115-11-2024Rimsha YousufSenior Officer QC  S/401Quality Control
Finished Product Incoming Logbook - QC Non-CephQCG/5/083-24/01115-11-2024Syed Asif AliAssistant Manager QC  S/402Quality Control
Machine / Equipment Logbook - Coating Machine - BG-400E - NCPRG/5/102-24/00615-11-2024Shahid Ali JhakAssistant Manager Production  S/318Production Non-Ceph
Equipment / Machine Log book - Coating Machine BG-150 Non-cephPRG/5/102-24/00615-11-2024Shahid Ali JhakAssistant Manager Production  S/318Production Non-Ceph
Shift Hand Over and Take Over Logbook - Non-Ceph - Compression AreaPRG/5/023-24/00115-11-2024Muhammad QasimManager Production  S/319Production Non-Ceph
Shift Hand Over and Take Over Logbook - Non-Ceph - Coating AreaPRG/5/023-24/00115-11-2024Muhammad QasimManager Production  S/320Production Non-Ceph
Shift Hand Over and Take Over Logbook - Non-Ceph - Blister AreaPRG/5/023-24/00115-11-2024Muhammad QasimManager Production  S/321Production Non-Ceph
Shift Hand Over and Take Over Logbook - Non-Ceph - Packaging AreaPRG/5/023-24/00115-11-2024Muhammad QasimManager Production  S/322Production Non-Ceph
Shift Hand Over and Take Over Logbook - Non-Ceph - Liquid Manufacturing AreaPRG/5/023-24/00115-11-2024Muhammad QasimManager Production  S/323Production Non-Ceph
Shift Hand Over and Take Over Logbook - Non-Ceph - Dry Powder Inhaler AreaPRG/5/023-24/00115-11-2024Muhammad QasimManager Production  S/324Production Non-Ceph
Shift Hand Over and Take Over Logbook - Nutraceutical PlantPRG/5/023-24/00115-11-2024Ayyan Usman KakviExecutive Production  S/325Production Nutraceutical
Shift Hand Over and Take Over Logbook - Cephalosporin PlantPRG/5/023-24/00115-11-2024Syed Baqar AliAssistant Manager Production  S/326Production Ceph
Environmental Monitoring Report by Settle Plate of Ceph Sterile AreaQCM/5/024-24/00813-11-2024Muzaffar AliSenior Executive QC  S/400Quality Control
Sterility Test Report - QC Micro CephQCM/5/044-24/00515-11-2024Muzaffar AliSenior Executive QC  S/404Quality Control
Bacterial Endotoxin Test Report - QC Micro CephQCM/5/021-24/00215-11-2024Muzaffar AliSenior Executive QC  S/403Quality Control
Machine / Equipment Logbook - Blister Machine - BM 350-D - NCPRG/5/102-24/00815-11-2024Abdul GhaniAssistant Manager Production  S/327Production Non-Ceph
Purified Water Testing Report - Abdul SabourQCG/5/036-24/01119-11-2024Abdul SabourOfficer QC10-12-2024Niaz Ali JatoiS/405Quality Control
Verification Log for Balance (ATX224R) - PD Analytical LabPDA/5/002-24/00219-11-2024Nadeem MuradAssistant Manager PD  S/46Product Development
Daily Temperature and Humidity Monitoring Log - Soft Gel AreaPNG/5/008-24/00218-11-2024Ayyan Usman KakviExecutive Production  S/55Production Nutraceutical
Microbiological Testing Report of Pharmaceutical Products - ValidationQCM/5/057-24/01319-11-2024Mehran KhanSenior Executive QC  S/406Quality Control
PM Testing Logbook for Adhesive Tape and DI - Zain ul HadiQCP/5/019-24/01019-11-2024Zainul HadiSenior Officer QC  S/407Quality Control
Cleaning and Verification of Weighing Balance - GF-300 - ZJT40 Capsule FillingPMG/5/024-24/00220-11-2024Shanza ShowkatAssistant Manager Production  S/328Production Non-Ceph
Cleaning and Verification of Weighing Balance - GF-300 - Sachet-01PMG/5/024-24/00220-11-2024Shanza ShowkatAssistant Manager Production  S/329Production Non-Ceph
Machine / Equipment Logbook - Fette P3030 - Metal DetectorPRG/5/102-24/00620-11-2024Shahid Ali JhakAssistant Manager Production  S/331Production Non-Ceph
Machine / Equipment Logbook - Fette P3030 - DedusterPRG/5/102-24/00620-11-2024Shahid Ali JhakAssistant Manager Production  S/330Production Non-Ceph
Logsheet for Entry and Exist in Sterile Area - Filling - CephPCG/5/006-24/00721-11-2024Usama YousufExecutive Production  S/128Production Ceph
Logsheet for Entry and Exist in Sterile Area - Washing - CephPCG/5/006-24/00421-11-2024Usama YousufExecutive Production  S/129Production Ceph
Temperature Monitoring Log Sheet for Cool Incubator VELP - Micro - NCQCI/5/115-24/00221-11-2024Nida ZehraSenior Officer QC  S/408Quality Control
Microbiological Testing Report of Nutraceutical ProductsQCM/5/049-24/00521-11-2024Mehran KhanSenior Executive QC  S/409Quality Control
Machine Equipment Logbook - ZPW-23 Deduster - NCPRG/5/102-24/00621-11-2024Shahid Ali JhakAssistant Manager Production  S/332Production Non-Ceph
Monitoring of Differential Pressure in Nutra - ZP19 CompressionPNG/5/007-24/00330-10-2024Ayyan Usman KakviExecutive Production  S/54Production Nutraceutical
WIP In and Out Record Form - Non-CephPRW/5/001-24/01922-11-2024Shahid Ali JhakAssistant Manager Production  S/334Production Non-Ceph
Weekly Drain Sanitization Log - Non-CephPMG/5/055-24/00222-11-2024Muhammad QasimManager Production  S/335Production Non-Ceph
Machine / Equipment Logbook - Fluid Bed Dryer (120Kg) - NCPRG/5/102-24/00925-11-2024Amina AslamSenior Officer Production  S/336Production Non-Ceph
Machine / Equipment Logbook - V-Blender - NCPRG/5/102-24/00525-11-2024Shanza ShoukatAssistant Manager Production  S/337Production Non-Ceph
PM Testing Logbook for Adhesive Tape and DI - Imran GhouriQCP/5/019-24/01122-11-2024Imran GhouriExecutive QC  S/410Quality Control
Machine / Equipment Logbook - ZPW26-B Compression Machine - NCPRG/5/102-24/00425-11-2024Shahid Ali JhakAssistant Manager Production  S/342Production Non-Ceph
Machine / Equipment Logbook - ZPW26-B Metal Detector - NCPRG/5/102-24/00425-11-2024Shahid Ali JhakAssistant Manager Production  S/341Production Non-Ceph
Machine / Equipment Logbook - ZPW26-B Deduster - NCPRG/5/102-24/00425-11-2024Shahid Ali JhakAssistant Manager Production  S/340Production Non-Ceph
Machine Equipment Logbook - ZPW23 Metal Detector - NCPRG/5/102-24/00625-11-2024Shahid Ali JhakAssistant Manager Production25-11-2024Niaz Ali JatoiS/339 Note: Logbook entry is cancelled as it is already issued at S. No.333Production Non-Ceph
Machine Equipment Logbook - T-700 Compression Machine - NCPRG/5/102-24/00425-11-2024Shahid Ali JhakAssistant Manager Production  S/338Production Non-Ceph
Microbial Count Report - NCQCM/5/019-24/00725-11-2024Nida ZehraSenior Officer QC  S/411Quality Control
Water Sampling Logbook - QC Non-CephQCG/5/181-24/00727-11-2024Abdul SabourOfficer QC  S/412Quality Control
Preparation and Standardization of Volumetric Solution - QC Non-CephQCG/5/050-24/00227-11-2024Abdul SabourOfficer QC  S/413Quality Control
Daily Log sheet of Centrifugal ChillerENG/5/001-24/01727-11-2024Hasnain ShabbirExecutive Engineering  S/58Engineering
Machine Equipment Logbook - GHL - NCPRG/5/102-24/00829-11-2024Zeeshan ShamsSenior Officer Production  S/343Production Non-Ceph
Disinfectant Preparation Logsheet - Non-CephPMG/5/039-24/00229-11-2024Muhammad QasimManager Production  S/344Production Non-Ceph
Equipment / Machine Logbook - Blister Machine BM 350 - B - NCPRG/5/102-24/01029-11-2024Abdul GhaniAssistant Manager Production  S/345Production Non-Ceph
Disinfectant Preparation Logsheet - Ceph. WarehouseWHG/5/053-23/00207-07-2023KhurramSupervisor02-12-2024Niaz Ali JatoiS/03Warehouse
Disinfectant Preparation Logsheet - Ceph. WarehouseWHG/5/053-24/00302-12-2024KhurramSupervisor  S/75Warehouse
Logbook for Shelf-life Update FormQAG/5/132-24/00114-11-2024Ziaullah MalangExecutive QA  S/70Quality Assurance
Logbook for Batch Document Issuance - General PharmaQAD/5/011-24/00802-12-2024Syed Asif AliOffice Assistant  S/71 Note: Format number transferred from QAG/5/115 to QAD/5/011.Quality Assurance
Machine Equipment Logbook - BM 350-A - Blister Machine - NCPRG/5/102-24/01202-12-2024Abdul GhaniAssistant Manager Production  S/346Production Non-Ceph
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Imran GhouriQCP/5/021-24/01303-12-2024Imran Khan GhouriExecutive QC  S/414Quality Control
Purified Water Testing Report - Abdul SabourQCG/5/036-24/01203-12-2024Abdul SabourOfficer QC23-12-2024Niaz Ali JatoiS/415Quality Control
Log Book for Microbiological Testing of Non Sterile Products - ActiflorQCM/5/092-24/00303-12-2024Mehran KhanSenior Executive QC  S/416Quality Control
Monitoring of Differential Pressure in Nutra - Liquid Filling AreaPNG/5/007-24/00304-12-2024Ayyan Usman KakviExecutive Production  S/57Production Nutraceutical
Monitoring of Differential Pressure in Nutra - Liquid ManufacturingPNG/5/007-24/00304-12-2024Ayyan Usman KakviExecutive Production  S/56Production Nutraceutical
PM Testing Logbook of Lid and Base Foil - Zain ul HadiQCP/5/018-24/01504-12-2024Zainul HadiSenior Officer QC  S/417Quality Control
INTERMEDIATE AND FINISHED PRODUCT SAMPLING LOG - NON-CEPHQAG/5/260-24/00304-12-2024Mudassar NazeerAssistant Manager QA  S/72Quality Assurance
Daily Climatic Chamber Monitoring Log - # 04 Serial # W810-0057QCI/5/104-24/00304-12-2024Daniyal KhalidAssistant Manager QC  S/418Quality Control
Raw Material Testing Logbook - Abdul SabourQCG/5/184-24/00205-12-2024Abdul SabourOfficer QC  S/419Quality Control
Equipment / Machine Log book - Packing Conveyor Belt - CephPCG/5/030-24/00304-12-2024Usama YousufExecutive Production  S/130Production Ceph
Logbook for Mobile Phase PreparationQCG/5/025-24/00605-12-2024Syed Asif AliAssistant Manager QC  S/420Quality Control
Purified Water Testing Report - Ceph - Syed Ahmed HussainQCG/5/036-24/00106-12-2024Syed Ahmed HussainSenior Officer QC  S/421Quality Control
Purified Water Testing Report - Ceph. - Aqib AhmedQCG/5/036-24/00106-12-2024Aqib AhmedExecutive QC  S/422Quality Control
Usage Logbook for Analytical balance No-05 QC packagingQCI/5/030-24/01306-12-2024Rimsha YousufSenior Officer QC  S/423Quality Control
PM Testing Logbook for Unit Carton and Master Carton (PharmEvo & Toll Client) - Rimsha YousufQCP/5/021-24/01606-12-2024Rimsha YousufSenior Officer QC  S/424Quality Control
Machine / Equipment Logbook - Gral Mixer - NCPRG/5/102-24/00906-12-2024Shahid Ali JhakAM Production  S/347Production Non-Ceph
Environmental Monitoring Report by Settle Plate for Fungal Count in LAF Microbiology Lab Non-Sterile area - CephQCM/5/118-24/00309-12-2024Muzaffar AliSenior Executive QC01-01-1900 S/425Quality Control
General Equipment Usage Logbook - Conductivity Meter - Mettler S230QCI/5/030-24/00710-12-2024Abdul SabourOfficer QC  S/426Quality Control
General Equipment Logbook - pH Meter INOLAB - Micro QC - NCQCI/5/030-24/00310-12-2024Nida ZehraSenior Officer QC  S/427Quality Control
Machine / Equipment Logbook - ZPW26-A - Compression Machine - NCPRG/5/102-24/00510-12-2024Shahid Ali JhakAssistant Manager Production  S/348Production Non-Ceph
General Equipment Logbook - Dissolution Apparatus No.01QCI/5/030-24/00410-12-2024Syed Asif AliAssistant Manager QC  S/428Quality Control
General Equipment Usage Logbook for Analytical Balance # 03QCI/5/030-24/01010-12-2024Rabab FatimaSenior Executive QC  S/429Quality Control
General Equipment Usage Logbook - Dissolution Apparatus No.03QCI/5/030-24/00510-12-2024Syed Asif AliAssistant Manager QC  S/430Quality Control
Finished Product Testing logbook - Talal HussainQCG/5/015-24/00110-12-2024Talal HussainExecutive QC  S/431Quality Control
Over printing Machine Logbook - Marko Print XI Jet - MP-PAK-02-03-05PMG/5/043-24/00413-12-2024Imran AbidSenior Executive Production  S/349Production Non-Ceph
Daily Monitoring of Temperature & Rh in Liquid Filling Area - NutraPNG/5/008-24/00213-12-2024Ayyan Usman KakviExecutive Production  S/58Production Nutraceutical
Daily Usage of IPC Equipment - Friability Tester PTF200 - Non-CephQAN/5/001-24/00513-12-2024Mudassar NazeerAssistant Manager QA  S/73Quality Assurance
Finished Product Testing logbook - Tanzeela AfzalQCG/5/015-24/00310-12-2024Tanzeela AfzalSenior Officer QC  S/432Quality Control
Finished Product Testing logbook - Hassan SultanQCG/5/015-24/00116-12-2024Hassan SultanSenior Officer QC  S/433Quality Control
General Equipment Usage Logbook - Micro Balance XPR-02QCI/5/030-24/00217-12-2024Syed Asif AliAssistant Manager QC  S/434Quality Control
Microbiological Media Preparation - Non-CephQCM/5/016-24/00517-12-2024Mehran KhanSenior Executive QC  S/435Quality Control
Usage Log Sheet for Hot Incubator (Memmert B-50)QCM/5/032-24/00317-12-2024Mehran KhanSenior Executive QC  S/436Quality Control
Vehicle In/Out RegisterADG/5/005-24/00718-12-2024Ehtisham WaheedExecutive Admin  S/47Administration
Visitors IN / OUT RegisterADG/5/006-24/00118-12-2024Ehtisham WaheedExecutive Admin  S/48Administration
Staff / MTs IN / OUT RegisterADG/5/007-24/00118-12-2024Ehtisham WaheedExecutive Admin  S/49Administration
Equipment Usage Logbook - Analytical Balance No.01 - QC CephQCI/5/030-24/00318-12-2024Aqib AhmedExecutive QC  S/438Quality Control
General Equipment Usage Logbook for DT Meter - Ceph LabQCI/5/030-24/00218-12-2024Aqib AhmedExecutive QC  S/437Quality Control
Cleaning Log Sheet of Warehouse - City CodingWHG/5/002-24/00120-12-2024Ishtiaque AliSenior Executive Warehouse  S/76Warehouse
Machine / Equipment Logbook - Manual Coating Pan - Manufacturing VesselPRG/5/102-24/00519-12-2024Shahid Ali JhakAssistant Manager Production  S/350Production Non-Ceph
Purified Water Testing Report - Ali RazaQCG/5/036-24/00120-12-2024Ali RazaOfficer QC  S/439Quality Control
Finished Product Testing logbook - Usama AhmedQCG/5/015-24/00120-12-2024Usama AhmedOfficer QC  S/441Quality Control
Finished Product Testing logbook - Aqsa IlyasQCG/5/015-24/00120-12-2024Aqsa IlyasSenior Officer QC  S/440Quality Control
PM Testing Logbook for Unit Carton and Master Carton - Zain ul HadiQCP/5/021-24/01323-12-2024Zainul HadiSenior Officer QC  S/442Quality Control
Purified Water Testing Report - Abdul SabourQCG/5/036-24/01323-12-2024Abdul SabourOfficer QC  S/443Quality Control
Daily Operation Report of BoilerENG/5/006-24/02124-12-2024Hasnain ShabbirExecutive Engineering  S/59Engineering
Raw Material Testing Logbook - Non-Ceph - Narain MalhiQCG/5/184-24/00124-12-2024Narain MalhiDeputy Manager QC  S/444Quality Control
Equipment Usage Logbook - Disintegration Tester No.02QCI/5/030-24/00424-12-2024Narain MalhiDeputy Manager QC  S/445Quality Control
Finished Product Testing logbook - Ahsan KhanQCG/5/015-24/00424-12-2024Ahsan KhanSenior Officer QC  S/446Quality Control
Cleaning and Verification of Weighing Balance - Encapsulation (T-Scale) EHG-300PCG/5/024-24/00224-12-2024Usama YousufExecutive Production  S/131Production Ceph
Cleaning and Verification of Weighing Balance - Suspension Filling - Radwag - CephPCG/5/024-24/00324-12-2024Usama YousufExecutive Production  S/132Production Ceph
Cleaning and Verification of Weighing Balance - Suspension Filling - Radwag - CephPCG/5/024-24/00224-12-2024Usama YousufExecutive Production  S/133Production Ceph
Cleaning and Verification of Weighing Balance - Panther BM-300 - Sterile Area - CephPCG/5/024-24/00324-12-2024Usama YousufExecutive Production  S/134Production Ceph
Cleaning and verification of weighing balance - Packing Hall CA5-BI-100D - CEPHPCG/5/024-24/00326-12-2024Usama YousufExecutive Production  S/135Production Ceph
Cleaning and verification of weighing balance - Omega - Packing Hall CephPCG/5/024-24/00326-12-2024Usama YousufExecutive Production  S/136Production Ceph
Cleaning Verification of Weighing Balance - Packing Hall - Avery BerkelPG/5/024-24/00326-12-2024Usama YousufExecutive Production  S/137Production Ceph
Machine Equipment Logbook - T-700 - Deduster - NCPRG/5/102-24/00426-12-2024Shahid Ali JhakAssistant Manager Production  S/351Production Non-Ceph
General Usage Logbook for Particle Size AnalyzerQCI/5/030-24/00326-12-2024Abdul SabourOfficer QC  S/448Quality Control
General Equipment Logbook - Karl Fischer No.01 (Model V20)QCI/5/030-24/00226-12-2024Abdul SabourOfficer QC  S/449Quality Control
General Equipment Logbook - F.T.I.RQCI/5/030-24/00226-12-2024Abdul SabourOfficer QC  S/450Quality Control
Equipment Usage Logbook - FurnaceQCI/5/030-24/00326-12-2024Abdul SabourOfficer QC  S/451Quality Control
Equipment Usage Logbook - Vaccum Oven # 03QCI/5/030-24/00226-12-2024Abdul SabourOfficer QC  S/452Quality Control
Equipment Usage Logbook - Polarimeter ADP-430QCI/5/030-24/00226-12-2024Abdul SabourOfficer QC  S/453Quality Control
Cleaning and Verification of Weighing Balance - AK-3000H - IPC Lab - CephPCG/5/024-24/00226-12-2024Usama YousufExecutive Production  S/138Production Ceph
Cleaning and verification of weighing balance - PAIR - CEPH WIPPCG/5/024-24/00326-12-2024Usama YousufExecutive Production  S/139Production Ceph
Machine / Equipment Logbook - Compression Machine ZP37-B-1 - NCPRG/5/102-24/00726-12-2024Shahid Ali JhakAssistant Manager Production  S/352Production Non-Ceph
Daily Climatic Chamber Monitoring Log - # 11 Serial # 20170000000459QCI/5/104-24/00326-12-2024Daniyal KhalidAssistant Manager QC  S/454Quality Control
Please wait...
please wait