|
|
| QAG/3/001 | Validation Master Plan | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAG/3/002 | LIST OF MANUFACTURED PRODUCTS - GENERAL PHARMA (NON-CEPH.) | 23-05-2025 | 23-05-2026 | Active | Quality Assurance |
|
|
| QAG/3/003 | Self Inspection Plan | 24-02-2025 | 24-02-2026 | Active | Quality Assurance |
|
|
| QAG/3/004 | LIST OF TECHNICAL STAFF | 02-05-2025 | 02-05-2026 | Active | Quality Assurance |
|
|
| QAG/3/005 | Product Information List for Pharmaceutical Products | 04-10-2024 | 04-10-2025 | Active | Quality Assurance |
|
|
| QAG/3/009 | Risk Assessment Plan for the Site | 02-01-2025 | 02-01-2026 | Active | Quality Assurance |
|
|
| QAG/3/015 | List of Products - Nutraceutical Plant | 28-11-2024 | 28-11-2025 | Active | Quality Assurance |
|
|
| QAQ/3/001 | List of Calibration of Equipment, Instrument and other devices | 18-04-2024 | 18-04-2025 | Active | Quality Assurance |
|
|
| QAQ/3/002 | Equipment Re-Qualification Plan for Ceph Area | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/003 | Equipment Re-Qualification Plan for Non-Ceph Area | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/004 | Equipment Re-Qualification Plan for Nutraceutical Area | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/005 | Equipment Re-Qualification Assessment Plan | 21-07-2023 | 21-07-2024 | Active | Quality Assurance |
|
|
| QAQ/3/009 | AHU Re-Qualification Plan for Ceph Area | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/010 | AHU Re-Qualification Plan for Non-Ceph Area | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/011 | AHU Re-Qualification Plan for Nutraceutical Area | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/012 | Media Fill Qualification Test Plan | 22-07-2024 | 19-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/013 | Thermal Mapping Plan | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/014 | Thermal Mapping Plan for Lab Equipment | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAQ/3/015 | Utilities Re-Qualification Plan | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/001 | Products ADE Value for Cleaning Validation | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/002 | Cleaning Validation Plan for Non-Ceph | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QCG/3/001 | INSTRUMENT CALIBRATION LIST OF QUALITY CONTROL DEPARTMENT | 17-04-2025 | 18-04-2026 | Active | Quality Control |
|
|
| QCG/3/002 | HPLC Clumns Lists | 22-04-2025 | 22-04-2026 | Active | Quality Control |
|
|
| QCG/3/004 | Annual Stability Plan | 28-12-2023 | 28-12-2024 | Active | Quality Control |
|
|
| QCG/3/005 | List of QC Domain ID | 20-06-2024 | 20-06-2025 | Active | Quality Control |
|
|
| QCG/3/006 | List of Quality Control Instrument Authorization (Matrix) | 26-08-2024 | 26-08-2025 | Active | Quality Control |
|
|
| QCG/3/007 | QC Approved Vendor List | 08-12-2023 | 08-12-2024 | Active | Quality Control |
|
|
| QCG/3/008 | QC Equipment Preventive Maintenance Plan | 13-12-2023 | 13-12-2024 | Active | Quality Control |
|
|
| QCG/3/010 | Analytical Method Validation and Verification Plan | 29-12-2023 | 29-12-2024 | Active | Quality Control |
|
|
| QCG/3/011 | List of Analytical Method Validation and Verification | 29-12-2023 | 29-12-2024 | Active | Quality Control |
|
|
| QCG/3/012 | Internal Audit Plan for ISO/IEC-17025:2017 LMS | 26-12-2023 | 26-12-2024 | Active | Quality Control |
|
|
| QCG/3/013 | List LIMS Users (MATRIX) of Quality Control Laboratory | 29-05-2024 | 29-05-2025 | Active | Quality Control |
|
|
| QCG/3/014 | List of LIMS Software Authorization Levels (MATRIX) | 29-05-2024 | 29-05-2025 | Active | Quality Control |
|
|
| PDG/3/001 | Product Development Equipment / Instrument List | 17-04-2025 | 17-04-2026 | Active | Product Development |
|
|
| PMG/3/001 | LIST OF AUTHORIZED PERSONNEL FOR NON CEPHALOSPORIN MANUFACTURING FACILITY | 01-09-2023 | 01-09-2024 | Active | Production Non-Ceph |
|
|
| PMG/3/002 | LIST OF AUTHORIZED PERSONNEL FOR NON CEPHALOSPORIN PACKING FACILITY | 01-09-2023 | 01-09-2024 | Active | Production Non-Ceph |
|
|
| PMG/3/003 | LIST OF AUTHORIZED PERSONNEL FOR DPI AREA | 24-11-2023 | 24-11-2024 | Active | Production Non-Ceph |
|
|
| PMG/3/004 | LIST OF PRODUCTS REQUIRED PERFORATION FOR LOCAL BATCHES – NON-CEPH PRODUCTION | 23-02-2023 | 23-02-2024 | Active | Production Non-Ceph |
|
|
| PMG/3/005 | LIST OF PRODUCTS REQUIRED PERFORATION FOR EXPORT BATCHES – NON-CEPH PRODUCTION | 23-02-2023 | 23-02-2024 | Active | Production Non-Ceph |
|
|
| PCG/3/001 | AUTHORIZED STAFF LIST OF CEPHALOSPORIN MANUFACTURING FACILITY | 11-04-2025 | 11-04-2026 | Active | Production Ceph |
|
|
| WHG/3001 | Finished Goods Storage List | 31-07-2024 | 31-07-2025 | Active | Warehouse |
|
|
| WHG/3/002 | Non-Ceph Raw Material Storage List | 17-04-2025 | 17-04-2026 | Active | Warehouse |
|
|
| WHG/3/003 | Nutraceutical Raw Material Storage List | 18-04-2025 | 18-04-2026 | Active | Warehouse |
|
|
| WHG/3/004 | Cephalosporin Raw Material Storage List | 02-08-2024 | 02-08-2025 | Active | Warehouse |
|
|
| ENG/3/001 | Layout - Water System Flow Diagram | 06-07-2022 | 06-07-2030 | Revised as required | Engineering |
|
|
| ENG/3/002 | Layout - Loop System from RO/Mix Bed to Non-Ceph & Ceph | 06-07-2022 | 06-07-2030 | Revised as required | Engineering |
|
|
| ENG/3/003 | LIST OF AHUS SERVING DETAILS | 21-05-2025 | 21-05-2026 | Active | Engineering |
|
|
| ENG/3/004 | Master Plan of PharmEvo Site | 26-07-2022 | 26-07-2030 | Revised as required | Engineering |
|
|
| ENG/3/005 | Layout Plan of Pharma Manufacturing | 15-05-2024 | 27-07-2030 | Revised as required | Engineering |
|
|
| ENG/3/006 | Persons Flow Ground Floor Pharma | 26-07-2022 | 26-07-2030 | Obsoleted as it is merged in ENG/3/005 | Engineering |
|
|
| ENG/3/007 | Material Flow Ground Floor Pharma | 26-07-2022 | 26-07-2030 | Obsoleted as it is merged in ENG/3/005 | Engineering |
|
|
| ENG/3/008 | HEPA Filters Identification Number List | 28-01-2025 | 28-01-2026 | Active | Engineering |
|
|
| ENG/3/009 | HVAC Schematic / Utilities Drawings Pharma | 01-08-2022 | 01-08-2030 | Revised as required | Engineering |
|
|
| ENG/3/010 | Layout of Dust Collection System at Ground Floor Engineering | 01-08-2022 | 01-08-2030 | Revised as required | Engineering |
|
|
| ENG/3/011 | Preventive Maintenance Plan for 2023-24 | 28-06-2024 | 28-06-2025 | Active | Engineering |
|
|
| ENG/3/012 | Layout of External Drainage System Ground Floor | 06-07-2022 | 06-07-2030 | Revised as required | Engineering |
|
|
| ENG/3/013 | Layout of Process Drainage System Ground Floor | 06-07-2022 | 06-07-2030 | Revised as required | Engineering |
|
|
| ENG/3/014 | HVAC Schematic Drawings Cephalosporin | 01-08-2022 | 08-11-2030 | Revised as required | Engineering |
|
|
| ADG/3/001 | Lockers List of Non-Ceph Manufacturing | 16-08-2024 | 16-08-2025 | Active | Administration |
|
|
| ADG/3/002 | Lockers List of Non-Ceph Packing | 16-08-2024 | 16-08-2025 | Active | Administration |
|
|
| ADG/3/003 | Lockers List of Cephalosporin Area | 16-08-2024 | 16-08-2025 | Active | Administration |
|
|
| ADG/3/004 | Lockers List of Nutraceutical Manufacturing | 18-07-2022 | 18-07-2023 | Expired | Administration |
|
|
| ADG/3/005 | Lockers List of Nutraceutical Packing | 18-07-2022 | 18-07-2023 | Expired | Administration |
|
|
| ADG/3/006 | Lockers List of Finished Goods Warehouse | 16-08-2024 | 16-08-2025 | Active | Administration |
|
|
| ADG/3/007 | Lockers List of City Coding Warehouse | 18-07-2022 | 18-07-2023 | Expired | Administration |
|
|
| ADG/3/008 | Lockers List of Raw Material Warehouse | 16-08-2024 | 16-08-2025 | Active | Administration |
|
|
| QAG/3/018 | Provisional Supplier List | 16-08-2024 | 16-08-2099 | Obsoleted | Quality Assurance |
|
|
| ENO/3/001 | Yearly Facility Preventive Maintenance Plan for the year | 28-02-2025 | 28-02-2026 | Active | Engineering |
|
|
| QAG/3/012 | Product Quality Review Plan | 03-01-2025 | 03-01-2026 | Active | Quality Assurance |
|
|
| QAV/3/003 | Process Validation Plan for Cephalosporin | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/004 | Process Validation Plan for Non-Ceph | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/005 | Process Validation Plan for Nutraceutical | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/006 | Software Validation Plan | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/007 | Hold Time Study Plan for Non-Cephalosporin Products | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/008 | List of Critical Equipment of Non-Ceph and Ceph Production | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/009 | List of Critical Equipment of Nutraceutical Production | 14-11-2024 | 14-11-2025 | Active | Quality Assurance |
|
|
| QAV/3/010 | List of Software | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/011 | List of Maximum Allowable Carry Over Limits | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/013 | Hold Time Study Plan for Cephalosporin Products | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/014 | Hold Time Study Plan for Nutraceuticals Products | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| QAV/3/012 | Products ADE Value for Cleaning Validation - DPI | 15-11-2024 | 15-11-2025 | Active | Quality Assurance |
|
|
| LIST OF EXPORT PRODUCTS SHELF-LIFE - GHANA | QAG/3/022 | 24-01-2024 | 24-01-2025 | Active | Quality Assurance |
|
|
| PNG/3/001 | Access Control List of Nutraceutical Facility | 11-04-2025 | 11-04-2026 | Active | Production Nutraceutical |
|
|
| QAG/3/024 | List of Export Products Shelf Life - Qatar | 11-03-2024 | 11-03-2025 | | Quality Assurance |
|
|
| QAG/3/006 | PRODUCT INFORMATION LIST FOR MEDICAL DEVICES & NUTRACEUTICAL PRODUCTS | 04-10-2024 | 04-10-2025 | Active | Quality Assurance |
|
|
| QAQ/3/017 | LIST OF COMPRESSED AIR USER POINTS AND SPECIFICATIONS | 06-05-2024 | 06-05-2025 | Active | Quality Assurance |
|
|
| QCG/3/017 | LIST OF RAW MATERIALS OF CEPHALOSPORIN MANUFACTURING FACILITY AS PER CONTAINER SIZE | 26-04-2024 | 26-04-2025 | Active | Quality Control |
|
|
| QAG/3/025 | List of Export Products Shelf Life - Veitnam | 31-05-2023 | 31-05-2024 | Active | Quality Assurance |
|
|
| QAQ/3/016 | Lab Equipment Re-Qualification Plan | 14-11-2024 | 14-11-2025 | Active | Quality Assurance |
|
|
| QAQ/3/018 | Software Re-Qualification Assessment Plan | 22-07-2024 | 22-07-2025 | Active | Quality Assurance |
|
|
| WHG/3/005 | List of Authorized Personnel of Warehouse - Raw Material | 07-01-2025 | 07-01-2026 | Active | Warehouse |
|
|
| WHG/3/007 | List of Authorized Personnel of Warehouse - Packaging Material | 12-07-2024 | 12-07-2025 | Active | Warehouse |
|
|
| WHG/3/008 | List of Authorized Personnel of Warehouse - City Coding | 05-03-2025 | 05-03-2026 | Active | Warehouse |
|
|
| CDG/3/001 | LIST OF ELECTRONIC EQUIPMENT & COMPUTERIZED SYSTEMS AS PER DATA INTEGRITY FUNCTIONALITY | 16-08-2024 | 16-08-2025 | Active | Data Integrity |
|
|
| ENG/3/015 | List of machines/equipment with identification number | 24-07-2024 | 24-07-2025 | Active | Engineering |
|
|
| ENG/3/016 | List of areas with identification number | 24-07-2024 | 24-07-2025 | Active | Engineering |
|
|
| ENG/3/017 | Unique identification number of fixtures used in different areas of facility | 24-07-2024 | 24-07-2025 | Active | Engineering |
|
|
| ENG/3/018 | Unique identification number of utilities used in different areas of facility | 24-07-2024 | 24-07-2025 | Active | Engineering |
|
|
| QAG/3/019 | BULK AND FINISHED PRODUCT SAMPLING PLAN | 28-02-2025 | 28-02-2026 | Active | Quality Assurance |
|
|
| PRW/3/001 | LIST OF AUTHORIZED PERSONNNEL OF WIP STORE | 30-08-2024 | 30-08-2025 | Active - SOP PRW/2/001 | Production Non-Ceph |
|
|
| ENG/3/019 | Schematic of Compressed Air Production & Distribution System | 17-10-2024 | 17-10-2030 | Active - Will be revised as per need | Engineering |
|
|
| ENG/3/020 | Layout Plan of Ceph. Manufacturing Facility | 19-02-2024 | 19-02-2030 | Active - Will be revised as per need | Engineering |
|
|
| ENG/3/021 | Layout Plan of Quality Control Laboratory Non-Ceph. | 10-03-2024 | 10-03-2030 | Active - Will be revised as per need | Engineering |
|
|
| PMG/3/006 | LIST OF WEIGHING BALANCES USED IN NON-CEPH PRODUCTION | 31-01-2025 | 31-01-2026 | Active | Production Non-Ceph |
|
|
| QAG/3/016 | List of Departmental Authorization Levels Matrix - QA | 31-01-2025 | 31-01-2026 | Active | Quality Assurance |
|
|
| QCG/3/028 | LIST OF DEPARTMENTAL AUTHORIZATION LEVELS MATRIX - QC | 14-04-2025 | 14-04-2026 | Active | Quality Control |
|
|
| QCG/3/021 | Master List of QC Instruments | 21-04-2025 | 21-04-2026 | Active | Quality Control |
|
|
| QCG/3/023 | LIST OF QC INSTRUMENTS QUALIFICATION AND REQUIRED TESTS | 01-01-2025 | 01-01-2026 | Active | Quality Control |
|
|
| QCG/3/026 | PARTICLE SIZE DISTRIBUTION REQUIREMENTS FOR RAW MATERIALS | 19-12-2024 | 19-12-2025 | Active | Quality Control |
|
|
| PRG/3/001 | LIST OF DEPARTMENTAL AUTHORIZATION LEVELS MATRIX - PRODUCTION DEPARTMENT | 17-04-2025 | 17-04-2026 | Active | Production Non-Ceph |
|
|
| WHG/3/006 | PACKAGING MATERIAL STORAGE LIST | 22-04-2025 | 22-04-2026 | Active | Warehouse |
|
|
| CDG/3/003 | LIST OF DEPARTMENTAL AUTHORIZATION LEVELS MATRIX – DATA INTEGRITY & COMPLIANCE DEPARTMENT | 18-04-2025 | 18-04-2026 | Active | Data Integrity |